1 [16-October-2013] [CMWG Meeting] «BE-RF-PM» TBM T0 MBQ TBM T0 MBQ DB SS MB SS TBM T0 MBQ DB SS MB SS MBQ in CLEX Option 1a: MBQ is installed upstream.

Slides:



Advertisements
Similar presentations
The Coin Game. SUPPLY CHAIN BASICS Key Learning Points: The dynamics of a supply chain The benefits to be gained from Supply Chain Visibility Demand/Supply.
Advertisements

Presented By J. Richard Creekmore US Technology Manager AstraZeneca Pharmaceuticals Process Robustness: Development to Life Cycle Management.
E E 2415 Lecture 16 2 nd Order High Pass, Low Pass and Band Reject Filters.
By Elspeth Frascatore October 2013
1 of Audience Survey Results Larry D. Gustke, Ph.D. – October 5, 2013.
Operation of V.90 modems Over Cable Telephony/HFC (Hybrid Fiber Coax) Circuits that use T and GR-303 Signaling Jack Douglass Chairman TIA TR30.3.
Transport.tamu.edu Rec Center Parking Changes Effective Spring 2013 TSAC, October 3, 2012.
1, 5, 9, 13, What is the common difference? 4 Say ‘tn’ represents the nth term. Then ‘tn+1’ represents the next term in the sequence. We can.
EX 6B THE RELATIONSHIP BETWEEN ARITHMETIC SEQUENCES AND FIRST ORDER DIFFERENCE EQUATIONS.
Emergency.lu A CONNECTIVITY SOLUTION FOR RELIEF WORKERS ON THE FRONTLINE 1.
HIPAA/HITECH Privacy and Security “Upstream:” CE, or BA delegating function “Downstream:” BA to which function is delegated “First Tier” BA: BA with direct.
3 GHz SICA: Breakdown measurement in CTF Alexey Dubrovskiy CLIC Workshop January 29, 2013.
1 Islamic University of Gaza Faculty Of Engineering Electrical & Computer Dept. DSL TECHNOLOGY Submitted to: Dr. Basil Hamad Submitted by: Nesreen Deeb.
Wednesday, January 16, 2013MAT 145. Wednesday, January 16, 2013MAT 145.
Event, March th 2013 Pressure. Event, March th 2013 Temperature.
CLIC two-beam module integration issues 4 th CLIC Advisory Committee (CLIC-ACE), May 26-28, 2009 CLIC two-beam module integration issues G. Riddone on.
1 [12-Feb-2014] «BE-RF-PM» CLIC TBM Prototype Status update EDMS №[Number] Dmitry Gudkov 1.
MICE Collaboration meeting May 31 st – June 3 rd 2009 RAL Tim Hayler, Andy Lintern DRAFT SEQUENCE OF EVENTS STEPS
Downstream PID Review Alan Bross MICE CM 16 October 8, 2006.
22-s02 27-s02 25-s04 20-s03 20-s06,7 28-s01 20-s04 22-s01 27-s01 20-s05.
Status of: CLIC Two-Beam Module Magnets R&D and Procurement 1 Michele Modena, CERN TE-MSC IWLC10, WG8, 21October 2010.
06-November-2013 Thermo-Mechanical Tests BE-RF-PM Review of the CLIC Two-Beam Module Program Thermo-Mechanical Tests L. Kortelainen, I. Kossyvakis, R.
1 Status of the CLIC two-beam module program A. Samochkine, G. Riddone Acknowledgements to the Module WG members 4 February 2014 CLIC Workshop 2014 (3-7.
America’s Latest and Greatest!.  Born April 19, 1983  Height: 6’5”  Weight 230 lbs.  Position: Catcher.
CLEX TBM T0 Cooling system Progress Report 1 V. Soldatov, A. Vamvakas, BE-RF
Discussion points TBM meeting 23/09/2015. Updates Global 3D assembly updated, no severe problems/clashes T1 RF network dimensions updated WPS arms machined.
Status of the MICE Project & Dashboard MICE Project Board 14 th November 2013 Roy Preece.
September 2008 SundayMondayTuesdayWednesdayThursdayFridaySaturday
PICTURES OF THE PROJECT 1 Upstream, downstream, general view, close surroundings Petroport Sable Road, N1, Cape town, South Africa – 3 October
CLIC08 workshop CLIC module layout and main requirements G. Riddone, on behalf of the CMWG Home page of the TBM WG:
Rev V182/82 Pressure Regulator PVC, PVDF, PP-natural*, PP, E-CTFE* Installed upstream to control pressure downstream Diaphragm and gauge guard.
FONT Meeting1 Charge normalisation and IP LO power scan N. Blaskovic.
CLIC cost drivers Philippe Lebrun on behalf of the C&S WG CLIC Technical Committee 3 November 2009.
FACET Exp Area Christine Clarke 3 rd October 2013.
CLIC two-beam modules TEST modules final schemes Dmitry Gudkov BE/RF CLIC Module Working Group.
cern.ch 1 A. Samoshkin 28-Feb-2011 Progress on CDR module design.
3-dB Power Divider and Hybrids for 8-Pack Phase II Power Distribution.
TBM Vacuum considerations Alex Vamvakas 15/07/2015.
CLEX TBM T0 Cooling system Design strategy 1 V. Soldatov, A. Vamvakas, BE-RF
BE – RF CLEX TBM Cooling System Software Perspective (DAQ and analysis) A. Zelios, BE - RF1 A. Zelios A. Vamvakas.
1 [24-July-2013] [CMWG] «BE-RF-PM» CLIC TBM Prototypes Status EDMS №[Number] Dmitry Gudkov 1.
Dmitry Gudkov BE/RF CLIC Module Working Group Test Module Type 1 (LAB). Design and integration. 3D model Ref: ST
Dmitry Gudkov Phase correction of the CLIC TBM in CLEX Dmitry Gudkov Wilfrid Farabolini.
«BE-RF-PM» 1 Wire Ø0.08mm CLIC TBM Booth Posters Modules Line (1:10) AS and PETS samples RF components, vacuum equipment Supporting, magnets,
Internet Options By OTX-West. Discussion Points Technologies  Dial-Up  DSL  Cable Data Transfer Speeds  1 Kbps (Kilobit per second) = one thousand.
Applications of Linear Systems Objective: To choose the best method for solving a system of linear equations.
Universal IR Controller -- Home Automation. Universal IR Controller Features 360° full range IR launch Wifi, RF communication Remote control Delicate.
Beam Loss Monitor activities at CTF3 and the Australian Synchrotron CLIC Workshop 18 January 2015 M. Kastriotou, E. Nebot del Busto M. Boland, E.B. Holzer,
PPM-DU (WORKING DOCUMENT, DO NOT PUBLISH) A three DOM Detection Unit in place of an Antares string. Nikhef for KM3NeT: PPM-DU optical network DRAFT!, designed.
Module layout and types Two-beam module review, September 2009 Module layout and types G. Riddone for the CMWG,
CLIC Common RF-girder study
Thermal review of CLIC module
Installation plan for LAB modules
LCWS 2017 – 26th October C. Rossi
,..,_ -, =.. t :: ;... t---aM 0 d -...c­ " ss ''- !j!j ! )
'. \s\s I. '.. '... · \ \ \,, I.
Microsoft Connect /26/2018 6:08 PM
حوضه آبریز و پارامترهای آن
. دتوزد،جطنه خهخههههههه... ،كزطظطظس، سء Ss s.
Additional Upstream Coil Shielding
' '· \ ·' ,,,,
Highly Compressed 82MB 1 =---====""- ·-*i.
Installation of New Officers
ES Waterfall Bridge.
Algebra 1 Section 7.6.
1.3 Solving Equations with Variables on Both Sides
Two-beam Test-stand Design and Construction Status
Calculus M 31 October 2011.
Web Service Installation
Option 1: 2257 m Electron Ring with Doglegs – Downstream of IP
Presentation transcript:

1 [16-October-2013] [CMWG Meeting] «BE-RF-PM» TBM T0 MBQ TBM T0 MBQ DB SS MB SS TBM T0 MBQ DB SS MB SS MBQ in CLEX Option 1a: MBQ is installed upstream (after TBM T0): Option 1b: MBQ and SS for TBM T1 are installed upstream (after TBM T0): Option 2b: MBQ and SS for TBM T1 are installed downstream (before TBM T0): DB MB DB MB DB MB TBM T0 MBQ Option 2a: MBQ is installed upstream (before TBM T0): DB MB

2 [16-October-2013] [CMWG Meeting] «BE-RF-PM» TBM T0 MBQ TBM T0 MBQ DB SS MB SS MBQ in CLEX Option 1a: MBQ is installed upstream (after TBM T0): Option 1b: MBQ and SS for TBM T1 are installed upstream (after TBM T0):

3 [16-October-2013] [CMWG Meeting] «BE-RF-PM» TBM T0 MBQ DB SS MB SS MBQ in CLEX Option 2b: MBQ and SS for TBM T1 are installed downstream (before TBM T0): TBM T0 MBQ Option 2a: MBQ is installed downstream (before TBM T0):