TPITF March 6, 2017 Juliano Freitas

Slides:



Advertisements
Similar presentations
Transparent, Repeatable, Defendable, and Published Generation, Transmission & Nat Gas Network Co-Optimizations
Advertisements

Electricity Technology in a Carbon-Constrained Future February 2007 Steven Specker President and CEO.
1 March 2, 2009 FERC Conference on Integrating Renewables Washington, DC Hamid Elahi Integrating Renewables into Power Systems GE Energy.
March 17, 2015 Striking the Balance Community Zoning, Military Mission and Renewable Energy Capitol Airspace Group.
SPP’s 2013 Energy Consumption and Capacity 2 12% annual capacity margin requirement CapacityConsumption Total Capacity 66 GW Total Peak Demand 49 GW.
Queue Reform at the Midwest ISO NARUC February, 2008.
EStorage First Annual Workshop Arnhem, NL 30, Oct Olivier Teller.
Month Year Working together to achieve your desired outcomes, by delivering service excellence. Building Engineering Solutions for the optimisation of.
INTEGRATION COST. Integration Cost in RPS Calculator While “Integration Cost” is included in NMV formulation, the Commission stated that the Integration.
Achieving 50 percent renewable electricity in California: The role of non-fossil flexibility in cleaning the electricity grid Jimmy Nelson, Ph.D. Energy.
U.S. Transmission Capacity & Reliability Are we willing to do what it takes to preserve the transmission option? David R. Nevius - NERC.
The Transmission Imperative November 3, 2011 Jay Caspary.
Need for Transmission Investment 2010 Mid-American Regulatory Conference AEP.
W IND E NERGY C HALLENGES. W IND ENERGY HAS MANY BENEFITS Oil independence Locally produced (jobs) No air pollution (or CO2) Uses no water Renewable Lower.
City of Fort Collins Wind Power Program March 24, 2004 John Phelan, PE Energy Services Engineer.
Toronto, Ontario - Cigre Canada Annual Membership meeting, October 4, 2009 CIGRÉ – 2010 Study Committee Presentation C1 System Development and Economics.
Page 1© 2009 Quanta Technology LLCPage 1 November 2007 BGE January 4, 2008 Strategic Midwest Area Renewable Transmission (SMART) Study October 06, 2009.
Updated 1/28/2011. Cost Allocations and Affordability of Tariffs March 8, 2011 Jay Caspary ·
Windfarms Implementing SPP6 Nick Evans 6 th December 2007.
OFFSHORE WIND CONNECTION & COSTS Mary Doswell Alternative Energy Solutions December 7 th, 2010.
Designing Energy Solutions without Borders National Association of Regulatory Utility Commissioners National Association of Regulatory Utility Commissioners.
Project Tracking Update July 12, 2011 MOPC. 2 STEP List (Excel Spreadsheet) –Engineers enter technical data and analysis on upgrades –Used as a repository.
SPP.org 1. Status Update for Reliability and Economic Assessments Stakeholder Meeting September 16, 2008 Austin, TX.
SPP.org Transmission Expansion and Cost Allocations for FERC SPP-Entergy CBA 1.
Bob Cupit Manager, Energy Facility Permitting Minnesota Public Utilities Commission.
Electric Capacity Market Performance with Generation Investment and Renewables Cynthia Bothwell Benjamin Hobbs Johns Hopkins University Work Supported.
© 2000 PACIFICORP kV LINE WALLA WALLA – WALLULA – Mc NARY 500 kV LINE HEMINGWAY – CAPTAIN JACK – REGIONAL PLANNING MEETING REGIONAL PLANNING PROJECT.
SPP.org 1. Status Update for Reliability and Economic Assessments Stakeholder Meeting June 20 th, 2008 Austin, TX.
Generation Subcommittee, Day Two Arne Olson Energy & Environmental Economics, Inc. (E3) Presented to: Subcommittee on Generation Resources Boise, Idaho.
1 Rate Impact Task Force’s Updated Results for it’s Report to the SPP Regional State Committee January 24, 2011.
C A L I F O R N I A E N E R G Y C O M M I S S I O N Integrated Energy Policy Report Workshop Landscape-Scale Environmental Evaluations for Energy Infrastructure.
Long Term Study Transmission Results May 21 st, 2013.
May14, 2010 RPG Meeting Houston Import Study Update Jeff Billo.
What are the factors affecting renewable energy use?
IDAHO STATE ENERGY PLAN Capabilities Overview. OBJECTIVES Help identify Plan objectives Help outline current Idaho energy situation Assess future energy.
RMR Exit Strategies Update TAC November 6, RMR UNITS.
June 11, 2010 RPG Meeting Houston Import Study Update Jeff Billo.
Steering Committee Meeting March 9, Why talk about assumptions? Garbage in, garbage out! “Let’s go dumpster diving!” Results sensitive to key.
SM SOUTHERN CALIFORNIA EDISON® RETI 2.0 Workshop 03/16/2016 IOU Panel.
© ABB Group October 1, 2016 | Slide 1 DynaPeaQ ® SVC Light ® with Energy Storage FACTS.
Pan-Canadian Wind Integration Study (PCWIS) Prepared by: GE Energy Consulting, Vaisala , EnerNex, Electranix, Knight Piésold Olga Kucherenko.
Wind Development in an Evolving Power Market
Nebraska Wind Conference Wednesday, November 16, 2011
Wind Management at MISO
The Charter Clear outline of the problem statement, including what is in and what is out of scope ….
Trends in Generation Dispatch
Opportunities in the Changing Energy System
Transmission Planning at PJM Interconnection LLC
CHILE CALIFORNIA COUNCIL
SunZia Project Description
Renewable Energy. Sustainable Future.™
Resilience and Reliability in PJM’s Competitive Markets
Transmission As Enabler
Integrated Distribution Planning Process
Module 40 Planning Our Energy Future
Changing Market Dispatch
Austin Electricity Conference Austin, Texas April 12, 2018
Michael Bailey, P.E. SDS Meeting, June 25-26, 2018
The GridSolar Project Presentation – NRCM January 21, 2010
Byron Woertz, Manager—System Adequacy Planning
CAWG Wind Survey March 28, 2011 Dallas, TX ESWG
Byron Woertz, Manager—System Adequacy Planning
Creating Benefits for New England: Putting the Pieces Together
Electricity Technology in a Carbon-Constrained Future
Gordon van Welie, President & Chief Executive Officer
Wholesale Electricity Costs
Jim Mcintosh Director, Executive Operations Advisor California ISO
WECC Scenario Task Force (WSTF)
Creating Benefits for New England: Putting the Pieces Together
Environmental & Energy Policy
Presentation transcript:

TPITF March 6, 2017 Juliano Freitas ITP20 TPITF March 6, 2017 Juliano Freitas

20 Year Plan Target 300+ kV Solutions Broad Set of Futures: Renewable Energy Penetration Load Growth Environmental Regulations Flexible to Evolve with Changing Landscape Categorized Upgrades: Reliability Upgrades Economic Upgrades Policy Upgrades

20 Year Plan Milestones Scope Development: 760 hours Policy Survey: 190 hours Resource Plan: 1300 hours Siting Plan: 415 hours Benchmarking: 320 hours Constraint Assessment: 350 hours Economic Model Building: 1300 hours Economic Assessment: 489 hours Policy Assessment: 443 hours Reliability Assessment: 1030 hours

20 Year Plan Milestones Solution Development: 124 hours Project Selection: 503 hours Portfolio Consolidation: 150 hours Stability Assessment: 230 hours Benefit Metrics: 2000 hours Sensitivity Analysis: 320 hours Report: 496 hours Study Management: 3000 hours TOTAL: 13420 hours

20 Year Plan Improvements Scope Development: 4-5 months discussion with SPP Members Constraint Assessment: Add Generation Outlet Facilities analysis Economic Model Building: Build only 20 year model for each Future Portfolio Consolidation: Exclude this milestone and have one specific portfolio per Future

20 Year Plan Improvements Stability Assessment: Wind transfer Benefit Metrics: Calculate APC only Calculate only one year B/C Solution Development: +300 kV solutions only Reliability Assessment: Exclude this milestone, focusing on economic and policy assessments