TIARA Collaboration Council

Slides:



Advertisements
Similar presentations
29 November Research Infrastructures in FP7 Jean-Louis Picqué European Commission DG Research.
Advertisements

Research Infrastructures in Horizon 2020
November 2004 The Research Infrastructures in FP7 DG RTD – Directorate ‘Structuring ERA’
NMP-NCP meeting - Brussels, 27 Jan 2005 Towards FP 7: Preliminary principles and orientations… Nicholas Hartley European Commission DG Research DG Research.
TIARA-FAM Final Annual Meeting R. Aleksan Nov. 25 th, Meeting Objectives 2.General Information 3.Deliverables/milestones.
Research Infrastructures in Horizon 2020 CEA-Saclay Saclay, 10 October 2013 Ana ARANA ANTELO European Commission – DG Research & Innovation Head of Unit.
Potential Funding Opportunities. Horizon 2020 – our targets 2/5 HORIZON 2020 – our target: €17.1m EXCELLENT SCIENCE SOCIETAL CHALLENGES €6.9m.
R. Aleksan FCC-ICB September 9 th, 2014 ESGARD, H2020 and FCC 1.Accelerator R&D in EC-FP 2.DS Projects submitted 3.Conclusion
TIARA WP2 Report and wrap-up Final Annual Meeting R. Aleksan Nov. 27 th, 2013.
Communication, Dissemination & Outreach TIARA-PP final meeting, Daresbury, 2013, November 25th C. Tanguy (CEA) 1.Website 2.Documentation database 3.Accelerating.
Introduction to EC Framework Programme 7 Rob Edgecock CCLRC Rutherford Appleton Laboratory Introduction to Framework Programmes “ “ FP7 Neutrino LOI Mapping.
1 INFRA : INFRA : Scientific Information Repository supporting FP7 “The views expressed in this presentation are those of the author.
ATTRACT is a proposal for an EU-funded R&D programme as part of H2020 for sensor, imaging and related computing (ICT) development Its purpose is to demonstrate.
Dr. Margaretha Mazura (EMF) ICT Day Opportunities to participate in EU ICT research projects San José, 16 February 2010 Principles of EU Research Funding.
The Future of High Energy Physics R. Aleksan CPPM/IN2P3 and DAPNIA/CEA EPS HEP2005 Lisbon, July 23,
EuCARD Number of partners : 40 beneficiaries (12 countries) Total cost ~ 50 M€ (requested EC contribution: ~15 M€) Coordinator : J.-P. Koutchouk (CERN)
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement Report from ESGARD EuCARD-2.
TIARA kickoff R. Aleksan February TIARA 1.WP2 objectives 2.Deliverables 3.Who does what 4.Organization matters 5.Conclusion
CARE Steering Committee and Dissemination Board R. Aleksan CARE Steering Committee Paris, April 11, Introduction.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement An Introduction to EuCARD-2.
Networks ∙ Services ∙ People Dale Robertson GÉANT General Assembly, Luxembourg EU Liaison Update 26 November 2015 Head of EU Liaison, GÉANT.
TIARA – WP6 Involving Industry in TIARA Lucio Rossi (WPD) CERN.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement EuCARD-2 3rd Annual.
H. PERO, E uropean Commission European policy developments and challenges in the field of Research Infrastructures.
R. Aleksan ESSnuSB meeting May 26 th, 2014 ESGARD and H H Projects under investigation 3.Integrating Activities 4.Conclusion
SC meeting R. Aleksan February 11 th TIARA 1.General Information 2.Final Budget 3.Meeting Objectives 4.Organizational matters 5.Kickoff meeting 6.Conclusion.
WP leaders meeting R. Aleksan October 5 th, 2009 TIARA 1.Objectives 2.General Context 3.Building TIARA 4.Conclusion.
WP leaders meeting R. Aleksan October 5 th, 2009 TIARA 1.Objectives 2.WP management 3.General rules 4.Conclusion Work Packages.
GC meeting R. Aleksan February TIARA 1.Meeting objectives 2.General Information 3.Final Budget 4.Consortium Agreement 5.Next meetings 6.Conclusion.
R. Aleksan EuCAN, Frankfurt September 30 th, 2014 Role and Impact of EC Co-Funded Accelerator R&D Projects 1.Accelerator R&D in EC-FP 2.DS Projects submitted.
R. Aleksan EuCARD2 meeting May 21 th, 2014 ESGARD and H H Projects under investigation 3.Integrating Activities 4.Conclusion
Research & Innovation Preparatory Phase and Early Phase Support under the WP * of Horizon 2020 Harry Tuinder Research Infrastructure Unit DG Research,
11/19/ Third Meeting of the EuCARD Steering Committee 1 EuCARD Management Report J.P. Koutchouk, S. Stavrev for the Coordination Office.
European Open Science Cloud and e-Infrastructures work-programme DI4R – Krakov - 28th September 2016 Augusto BURGUEÑO ARJONA Head of Unit e-Infrastructure.
ARIES WP2 Task 2.2 kick-off Coordination, support and enhancement of communication/outreach activities for accelerators in Europe Jennifer Toes (CERN),
WP2.3 Accelerator and SC magnet TI sustainability
A new Integrating Activity for Particle Accelerator R&D
AMICI WP1 – Management, coordination and dissemination
Training, Communications and Outreach
TIARA TIARA website: General Information
How to make H2020 eInfrastructure Work Programme work for you
Panel discussion on Principles of Engagement
INFRA : Scientific Information Repository supporting FP7
Support Sustainable Research through a
TIARA: Structuring further Accelerator R&D in Europe
TIARA Executive Office
Strengthening the foundations of ERA
Coordinated Accelerator R&D in Europe
for the EURISOL Steering Committee
M&E Task Force Meeting
TIARA: Structuring further Accelerator R&D in Europe
Accelerator Research and Innovation for European Science and Society
Goal of the workshop To define an international roadmap towards colliders based on advanced accelerator concepts, including intermediate milestones, and.
WP 4 CERN Nov 2, 2009.
EU-Russia Cooperation in the Areas of Science, Research and Innovation
ICT NCP Infoday Brussels, 23 June 2010
TIARA WP5 Survey Results
ARIES A new Integrating Activity for Particle Accelerators
WP4.1: Industry Survey – Accelerator Technologies
Alessandra Luchetti Deputy Head of Unit
Project Overview and EOSC Governance
Olivier Napoly, coordinator CEA/Irfu
Research Infrastructures activities in Horizon Work Programme
AMICI WP1 – Management, coordination and dissemination
S3P Agri-Food Working Committee Meeting
Futurs Programmes Européens et Co-Innovation Industrielle
Juan Gonzalez eGovernment & CIP operations
AMICI WP1 – Management, coordination and dissemination
ACTRIS – EMEP, THE WAY FORWARD
AMICI WP5 INDUSTRIALIZATION
Presentation transcript:

TIARA Collaboration Council R. Aleksan TCC meeting June 19-20, 2017 General information H2020 IA call TIARA resources Preparation WP2018-2020

Past and on-going activities (History) 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 Accelerator R&D CARE (IA) EuCARD (IA) EuCARD2 (IA) ARIES (IA) EUROTEV (DS) EURISOL (DS) EUROnu (DS) HiLumi (DS) EuroCIRCOL (DS) EuPRAXIA (DS) SLHC-PP (PP) ILC-HiGrad (PP) TIARA (PP) EUROLEAP AMICI (INNOV) EASITrain (MSCA) FuSuMaTech (FET) P6 P7 H20 H20 H20 So far, ESGARD/TIARA has overseen the submission of 15 successful projects in the INFRA calls : Total cost : ~297 M€ with EC contr. ~99 M€ See presentation: M. Vretenar, M. Benedikt, R. Dorda, O. Napoly, A. Dael

Past and on-going activities (History)

On going calls and projects INFRA: WP 2016-17-INFRAINNOV New type of calls ATTRACT proposal submitted Surprisingly many proposals were submitted, i.e. ATTRACT not warrantied to succeed. Results in August Not dedicated to Accelerator but could be used for diagnostics and instrumentation ?

INFRA: WP 2016-17-INFRADEV (cont’d) IRI PP data DS 2 projects submitted (ESSnuSB and CompactLight) Overall, 41 projects were submitted, i.e. expected success rate ~20% Results in August

FET: WP 2016-17-FETOPEN FET calls FuSuMaTech proposal (coordination activity with Industry on Supraconducting Magnets) submitted to FETOPEN-03 (~0.5M€ , 1.5 years) APPROVED See presentation by A. Daël

MSCA: WP 2016-17-ITN ITN-ETN calls EASITrain proposal (coordination activity with Industry on Supraconducting Magnets) was re submitted (~4M€ , 4 years) : APPROVED Presentation at next TIARA meeting

Participant Short name TIARA financial Status Participant Number Participant Short name Received 2016 Recived 2017 sum comment 1 CEA 5000 5 000 10 000 2 CERN 3 CNRS 4 CIEMAT Administrative issues 5 DESY 6 GSI 7 INFN 8 PSI 9 STFC 10 UU 11 IPJ-PAN   55 000 50 000  100 000 Additional TIARA-PP 4 725.28 Available Total 59 725.28 109 725.28 No funding used so far Proposal : Workshops not included in ARIES and/or co-innovation with industry Education & Training (depending on ARIES) Dissemination and outreach activities Other suggestions

TIARA in-kind contribution Status cost personnel FTE person-month unit cost (k€) cost (k€) Contributor Name secretary 0,1 1,2 3,5 4,2 CERN E. Delucinge scientific assistant 0,3 3,6 5 18 CEA A. Chancé TIARA webmaster 6 INFN D. Sertore+ Database management STFC P. McIntosh+ DC&O officer 0,2 2,4 12 CERN+INFN TBD+Sertore financial officer N. Judas edu.&train. (elearning+portal 1,5 90 2 10 CNRS CIEMAT GSI PSI 4 20 P. Burrows UU IFJ-PAN Modifications: D. Sertore has replaced G. Volpini (see presentation later) J. Double will replace E. Delucinge as our secretary

Discussion with the EC EC is concentrating on H2020-WP2018-2020 (discussion on going with Programme committee) : Total Budget 1.15B€ 6 large themes: (the following are preliminary trends nothing confirmed) EC concentrates on WP2018 Development and Long Term Sustainability (former INFRADEV) DS call in 2019 Preparatory Phase call 2018 (for new ESFRI RM 2018) possible call in 2020 for new ESFRI projects in RM2020? ESFRI-OWCRI (other world-class RI) call 2018 Interoperability & EOSC (cutting-edge services for Open Science Cloud) New : Joint funding with CNECT Consolidation of generic services Prototyping of new services Clusters of services in EOSC Integrating/opening European Infrastructures (former INFRAIA) Advanced Community call in 2018 (targeted basis to be discussed with PC) Starting Community call in 2019 (2-stage call) in discussion Pilot Action Pilote for most mature Community ( ?!?!) in 2020 (one stage)

Topics (Type of Action) Discussion with the EC Development and Long Term Sustainability Topics (Type of Action) Budgets (EUR million) Deadlines 2019 2020 Opening: 10 Oct 2018 INFRADEV-02-2019-2020 (CSA) 20.00   29 Jan 2019 Opening: 14 Nov 2018 INFRADEV-03-2019 (RIA) 60.00 20 Mar 2019 Opening: 18 Jul 2019 INFRADEV-01-2019-2020 (RIA) 10.00 12 Nov 2019 Overall indicative budget 100.00 PP for ESFRI RM18 Impl. for ESFRI/OWCRI DS Indicative budget for 2020: EUR 28 million INFRADEV-02-2019-2020: Preparatory Phase of new ESFRI projects (b) 2020 deadline: Preparatory Phase of the new projects in the 2020 ESFRI Roadmap

Topics (Type of Action) Discussion with the EC Integrating/opening European Infrastructures Topics (Type of Action) Budgets (EUR million) Deadlines 2018 2019 Opening: 05 Dec 2017 INFRAIA-01-2018-2019 (RIA) 115.00   22 Mar 2018 Opening: 14 Nov 2018 110.00 20 Mar 2019 Overall indicative budget IA advanced commu. IA advanced commu. Indicative budget: EUR 150 million INFRAIA-02-2020: Integrating Activities for Starting Communities INFRAIA-03-2020: Pilot for a new model of Integrating Activities

Discussion with the EC (cont’d) European Data Infrastructure (EDI) New : Joint funding with CNECT Mix of funding with LEIT, FET and e-infra Support to PRACE and GEANT EDI: exascale infrastructure for HPC machines, interconnectivity and data nodes for HPC (linked with CEF Connecting Europe Facility) Innovation (ex-INFRAINNOV) Stimulate innovating potential of SMEs as users of advanced HPC Network of RI - ILO Pilot super-JRA on key-technos ? INFRASUPP (Policy and international actions) Support to NCP, ESFRI Club, GSO secretariat, collaborations with Middle-East (a new beamline at SESAME ?), and with Russian facilities (access for european users) I am working with the French representative at the PC to suggest appropriate wording for the calls of interest

Topics (Type of Action) Discussion with the EC Innovation Topics (Type of Action) Budgets (EUR million) Deadlines 2019 Opening: 10 Oct 2018 INFRAINNOV-01-2019 (RIA) 8.00 29 Jan 2019 Opening: 14 Nov 2018 INFRAINNOV-02-2019 (CSA) 1.50 20 Mar 2019 Overall indicative budget 9.50   HPC use for SMEs Network of RI-ILO Indicative budget: EUR 60 million INFRAINNOV-03-2020: Co-Innovation platform for research infrastructure technologies INFRAINNOV-04-2020: Innovation pilots

Topics (Type of Action) Draft WP2018-2020 INFRASUPP (Policy and international actions) Topics (Type of Action) Budgets (EUR million) Deadlines 2018 2019 Opening: 05 Dec 2017 INFRASUPP-01-2018-2019 (RIA) 6.00   22 Mar 2018 INFRASUPP-01-2018-2019 (CSA) Opening: 14 Nov 2018 27.00 20 Mar 2019 Overall indicative budget 12.00 SESAME…. ERIC network….

Enhancing co-innovation with industry Co-Innovation Workshop (principle approved at previous meeting) Sole Objective of the workshop : « How to enhance co-innovation with industry » We discussed this with the EC and they are very interested, i.e. want to participate We discussed the idea at the ARIES kickoff meeting are received a strong support from industry present at the meeting First meeting with Workshop Organizing Committee 14/6/2017 R.A., J.L. Lancelot(SIGMAPHI) , M. Losasso, M. Plesko (COSYLAB), T. Torims, M. Vretenar 2 half days Tentative dates : period 5-8/12, 29/11-1/12 or 13-15/12, 2017 Venue: Brussels

Enhancing co-innovation with industry Objectives in of the Workshop: Reflect on most effective way to develop co-innovation with industry in Europe Propose appropriate mechanism and funding scheme Propose and establish new EC instruments to boost co-innovation Strong interest from Industry members of the WoC

Meetings TCC-IRC: TIARA Collaboration Council – Implementation Review Committee Reminder of next meeting : October 19, 2017 at CERN Talk on status of FAIR Talk on EASITrain Extended talk on EuPRAXIA Proposal for following meeting : CERN, doodle for the period February/March 2018 ? Should we heve the following meeting (~june/july 2017) outside CERN ? At last meeting Sweden was candidating! GSI was also interested! Reminder of other project general meetings April 9-13, 2018 : 5th FCC/EuroCirCol annual meeting in Amsterdam May, 2018 : ARIES meeting

Additional Slides

TIARA Collaboration Council meetings Institute Representative Substitute « IRC » (ESGARD functions) CEA P. Vedrine A. Chancé CERN F. Bordry M. Vretenar CNRS J.-L. Biarrotte CIEMAT J. Perez L. Garcia-Tabares DESY R. Brinkmann R. Assmann GSI P. Spiller J. Stadlmann INFN E. Nappi S. Guiducci PSI L. Rivkin T. Garvey STFC G. Blair C. Jamieson P. MacIntosh UU T. Ekelof IFJ-PAN M. Jezabek P. Malecki Members