Beam-Beam status in SixTrack (1)

Slides:



Advertisements
Similar presentations
Testing Relational Database
Advertisements

Configuration management
Configuration management
Requirements Specification and Management
Algorithms. Software Development Method 1.Specify the problem requirements 2.Analyze the problem 3.Design the algorithm to solve the problem 4.Implement.
Contributing source code to CSDMS Albert Kettner.
Pertemuan 16 Matakuliah: A0214/Audit Sistem Informasi Tahun: 2007.
Chapter 3: System design. System design Creating system components Three primary components – designing data structure and content – create software –
1 CMSC 132: Object-Oriented Programming II Nelson Padua-Perez William Pugh Department of Computer Science University of Maryland, College Park.
Molly, Gwyn, Sam, and Eric.  Configure DACs to have their digital input set to zero (2.5V) when they receive power  Ramp up to higher voltage at a “user.
“GENERIC SCRIPT” Everything can be automated, even automation process itself. “GENERIC SCRIPT” Everything can be automated, even automation process itself.
United Nations Economic Commission for Europe Statistical Division Applying the GSBPM to Business Register Management Steven Vale UNECE
Introduction Status of SC simulations at CERN
Semester 1, 2003 Week 7 CSE9020 / 1 Software Testing and Quality Assurance With thanks to Shonali Krishnaswamy and Sylvia Tucker.
Testing. Definition From the dictionary- the means by which the presence, quality, or genuineness of anything is determined; a means of trial. For software.
PTC ½ day – Experience in PS2 and SPS H. Bartosik, Y. Papaphilippou.
Problem Solving: Methods, Formats, and Conventions Introduction to Mechanical Engineering The University of Texas-Pan American College of Science and Engineering.
 To explain the importance of software configuration management (CM)  To describe key CM activities namely CM planning, change management, version management.
© 2008 Cisco Systems, Inc. All rights reserved.Cisco ConfidentialPresentation_ID 1 Chapter 6: Static Routing Routing Protocols.
Algebra I Vocabulary Chapter 2. Equations that have the same solution(s) are called.
Usability Issues Documentation J. Apostolakis for Geant4 16 January 2009.
Database structure for the European Integrated Tokamak Modelling Task Force F. Imbeaux On behalf of the Data Coordination Project.
Configuration Management (CM)
Pre kick off meeting 1 1 NCHRP_22_24 January CME Activities 1.Define reporting procedures for simulations (data output, variables, etc) 2.Define.
Software Project Planning Defining the Project Writing the Software Specification Planning the Development Stages Testing the Software.
Release Management Configuration management. Release Management Goal Coordinate the processes through the project development life cycle Ensure the.
A Technical Validation Module for the offline Auger-Lecce, 17 September 2009  Design  The SValidStore Module  Example  Scripting  Status.
T Iteration Demo METAXA PP Iteration 17 November November November 2015.
CMPT371 – Team 1 Luminance. Project – Luminance  Puzzle game  Guide a beam of light using a limited set of tools to certain goals avoiding obstacles.
General guidelines for SixTrack The code options aim at being general with no implicit assumptions to avoid misunderstanding (overhead for the user) and.
Copyright 2010, The World Bank Group. All Rights Reserved. Managing Data Processing Section B.
© 2008 Cisco Systems, Inc. All rights reserved.Cisco ConfidentialPresentation_ID 1 Chapter 6: Static Routing Routing Protocols.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
28-Aug-2003 Steve Kahn Standardized MucGeant I/O Front End to MucGeant Standardize the input files for MucGeant: –The input should be in the ICOOL for003/4.
TTCN-3 Testing and Test Control Notation Version 3.
BNL trip  Goal of the BNL-FERMILAB- CERN collaboration  The codes  BB tune foot-prints  DA studies.
Introduction to Problem Solving Programming is a problem solving activity. When you write a program, you are actually writing an instruction for the computer.
Introduction to CAST Technical Support
XINFO HORIZONT Scheduler migration support Software for Datacenters
Software Testing.
Software Configuration Management
Business System Development
Testing the System.
System Design, Implementation and Review
SECTION 2 SETUP, WRITING AND CREATING
CONTRACT ADMINISTRATION
Tracking simulations of protons quench test
Overview of Needs for SixTrack on-line Aperture Check
Navigating the E-rate Invoicing Process
DMS Self-Service Center Introduction
DMS Self-Service Center Introduction
Systems Analysis and Design
GIRO usage and GSICS Lunar Observation Dataset Policy S. Wagner
Beam-beam checks R. De Maria.
NA4 Test Team Status Test meeting, 07/09/04
Applied Software Implementation & Testing
Engineering Processes
Introduction to CAST Technical Support
CLINICAL INFORMATION SYSTEM
Modeling of Advanced LIGO with Melody
Student.GWB.com → Download → Software
Claire Osgood November 2017
Search for coincidences and study of cosmic rays spectrum
Amos Introduction In this tutorial, you will be briefly introduced to the student version of the SEM software known as Amos. You should download the current.
Assignment #3 Programming Language, Spring 2003
Welcome 1 This is a document to explains the chosen concept to the animator. This will take you through a 5 section process to provide the necessary details.
First Article Inspection (Per AS9102)
Templates Generic Programming.
Contributing source code to CSDMS
Templates Generic Programming.
Presentation transcript:

Beam-Beam status in SixTrack (1) comparison between the old and new implementation: differences in the input files -> 3 examples (HO 4D, HO 6D, LR) made by Javier and used for comparisons. state of the differences in the output files for equivalent input -> small numerical differences found by Javier and Kyrre and compatible with expected floating point inaccuracy but not fully understood state of the full test suite with the new implementation -> not yet done, to be done by Javier with introduction from SixTrack team. Meeting 11/11/2015: Javier, Riccardo, Tatiana, Yannis

Beam-Beam status in SixTrack (2) documentation: state of the user manual (description of the input files) -> description available in the Twiki, sign conventions not specified. Javier to produce drawings explaining the conventions and update of the user manual. state of physics manual (full description of the physics implemented) -> Leunissen’s paper explains most of the code. First version in the SixTrack Physics manual drafted by M. Fjellstrom from actual code in 2013. Javier to verify, complete missing equations and establish link with user input. developer manual (description of the internal variables). -> Written in the Twiki by Javier. Meeting 11/11/2015: Javier, Riccardo, Tatiana, Yannis

Beam-Beam status in SixTrack (3) mask files: definitions of the quantities madx should now calculate for the new input.-> Will be available when the user manual will be completed. request to the madx team for implementing the necessary conversions -> Riccardo will send a ticket to madx team with the specification from the manual. update of the mask file -> Resources and time scale to be identified. crabbing and rf-curvature: new code allows full control of a 6D kicks. proof that a set of 6D slices with proper definitions of the parameters are equivalent to internal slicing in Sixtrack without crab cavities and for gaussian longitudinal profile. -> Resources and time scale to be identified. proof that this mechanism can be extended to include the effects of crab cavities with RF- curvature and non-gaussian profiles. -> Resources and time scale to be identified. Meeting 11/11/2015: Javier, Riccardo, Tatiana, Yannis