LHC Hardware Commissionning

Slides:



Advertisements
Similar presentations
. TYPICAL SUPERCONDUCTING MAGNET TEST SEQUENCE. PREPARATORY TESTS AT ROOM TEMPERATURE Lyre Test: Simulate Effect of Thermal Contraction in Cold condition.
Advertisements

1 Powering Tests and Safety Electrical Safety Hugues Thiesen Power Converter Group.
New HV test specification for the LHC N. Catalan for the EI section.
TE-MPE –TM, 16/05/2013, Mateusz Bednarek, TE/MPE-EE ELQA testing during and beyond LS1.
HQ TEST CERN by Marta Bajko CERN TE-MSC TF For Hi Lumi and LARP the 16 th of November 2011 CERN.
Chamonix Risks due to UPS malfunctioning Impact on the Superconducting Circuit Protection System Hugues Thiesen Acknowledgments:K. Dahlerup-Petersen,
HQ01e CERN test preparation update CERN Team: H. Bajas, M. Bajko, A. Chiuchiolo, G. Deferne, O. Dunkle, J. Feuvrier, P. Ferracin, L. Fiscarelli, F. Flamand,
LHC Hardware Commissioning Review May 2005, CERN, 1211 Geneva 23 1 LHC Hardware Commissioning Review Contribution ID: 20 – Quality assurance and.
CERN Rüdiger Schmidt FCC week 2015 Long Magnet Stringpage 1 Incident September 19 th Architecture of powering and protection systems for high field.
TE-MPE-TM 25/10/2012, ELQA team TP4 System – the main tool for ELQA Mateusz Bednarek, CERN, Geneva Jaromir Ludwin, IFJ-PAN, Krakow.
D. Bozzini, AT/MEL/EM, Chamonix Workshop XIV, January Chamonix Workshop XIV Session 4 – Other Issues affecting Beam Commissioning 1 Electrical Quality.
Frequency Transfer Function Measurements during LS1 Emmanuele Ravaioli Thanks to Arjan Verweij, Zinur Charifoulline, Andrea Musso MPE-TM
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
General Considerations for the Upgrade of the LHC Insertion Magnets
TE/MPE/EE Short ‘Halfway’ Update ELQA – LS1 Activities MPE/The Electrical Engineering section Knud, on behalf of TE/MPE/EE – 20 September LSC Reminder:
AT-MEL-PM, R. Denz, CERN, CH-1211 Geneva 23 1 QPS system and its risks  Principal risks  General remarks  Quench heater circuits  Quench detection.
AT-MEL AT-MEL, K. H. Mess, “Chamonix” 2005, CERN, 1211 Geneva 23 1 What are today's issues for all other magnets? Questions 1.) What are the as build performances.
5 th Joint Hi-Lumi LHC-LARP Annual Meeting 2015 SC Link Protection A.Ballarino 28/10/2015.
Power Converters and DC cablesSlide 1/.. LHC - HC review Hugues THIESEN – AB/PO Thursday, 12 May 2005 Water cooled cables warm bus bars power converter.
BCWG - 16/11/20102 Content WHY do we need a HW Commissioning campaign? WHAT are we going to do? HOW are we going to do it? ElQA QPS Powering Tests Planning.
SAFETY DURING HARDWARE COMMISSIONING, 18 October 2007, D. Bozzini, AT/MEL-EM 1 Safety during Hardware Commissioning Davide Bozzini on behalf of the ELQA.
[R. Alemany] [CERN AB/OP] [Engineer In Charge of LHC] HWC Workshop ( ) Consolidation and major changes that have impact on the powering circuits.
1 J. Mourao (TE/MPE/CP) Enhanced DQHDS functionality  Status for 2011  Increase Magnet diagnostic capabilities  Our proposals.
MPE Workshop for LS1 / 22 & 23 Nov. 2012, G. D’Angelo TE/MPE-EE ELQA during LS1 train, Special measurements and NCs Magnet replacement: AIV Splices consolidations:
Correctors magnets V. Zubko, IHEP, Protvino SIS 300 Pre-consortium Meeting Thursday 19 March 2009, Protvino.
AT-MEL Group Meeting, CERN, 1211 Geneva 23 1 ElQA activities during hardware commissioning N. Catalan Lasheras.
MP3- MIC-C S1-2 A22R1- 19/08/2009 G.D’Angelo on behalf of Elqa team MP3 MIC-C test campaign in S1-2 Special guest: A22R1 (MB2413)  MIC-C in the ARC results.
E. Todesco MAGNET (RE)Training E. Todesco Magnets, Superconductors and Cryostats Group Technology Department, CERN LHC risk review, 5 th March 2009 Acknowledgements:
Machine Protection Review, R. Denz, 11-APR Introduction to Magnet Powering and Protection R. Denz, AT-MEL-PM.
TE/MPE-MS MPE-TM meeting 14/06/2012, Richard Mompo Updated ELQA test procedure Co-authors: Nuria Catalan Lasheras Mateusz Bednarek Giorgio D’Angelo Richard.
MPP Meeting 07/03/2007 MPP Main Ring Magnet Performance Panel Meeting Wednesday 7th March 2007 Agenda: 1)Matters arising 2)Recommendations for the case.
The prototype test String 2 May 13, 20082Roberto Saban – Academic Training Lecture 1 – Why LHC Hardware Commissioning?
Logo area HL LHC IT STRING M. Bajko CERN TE-TM and QXF Review.
TEST FACILITY STATUS FOR TESTING CERN Marta Bajko WP10. EUCARD 2 Task 4 - HTS Magnet Tests, June 2015.
Training LHC Powering – Blanca Perea Solano From Individual System Tests to Powering to Nominal Blanca Perea on behalf of Hardware Commissioning Coordination.
Hardware Commissioning Review, R. Denz, 12-May Superconducting circuits: what remains to be done during hardware commissioning R. Denz AT-MEL-PM.
Click here to add footer 1 Ludovic Grand-Clément & Hervé Prin 08/12/2014.
Considerations from machine protection and the ELQA teams
Electrical insulation of magnet circuits in sector 7-8
MPP Result of the investigation in the orbit correctors faults.
Powering LHC magnets version 30/3/2007.
HO correctors update Massimo Sorbi and Marco Statera
ELQA Electrical Quality Assurance
HO Corrector Magnets: decapole test and future plans
Minimum Hardware Commissioning – Disclaimer
The HL-LHC Circuits: Global View and Open Questions
Giorgio on behalf of ELQA team
Giorgio on behalf of ELQA team
Experience: past events and accidents
The LHC - Status Is COLD Is almost fully commissioned
R&D of neutrino beam production for future (Multi-)MW proton facility:
Quench protection of the MAGIX high-order correctors
Coordination of Hardware Commissioning
Powering the LHC Magnets
MPE main activities planned for LS2
Status of ELQA equipment and related software
Recommissioning of sector 12 after a short warm-up during eYETS 2016/17 QBT, MP3 – May 2017 S. Le Naour.
HO Corrector Magnets: decapole test and future plans
Powering from short circuit tests up to nominal
Circuits description and requirements - Closed Session-
LS1 TE/MPE/EE CABLE ACTIVITIES
Re-Commissioning (IST) of Electrical Systems: QPS, EE & PIC
Rüdiger Schmidt and Karl Hubert Mess
+ many slides from various colleagues (KH, Rudiger, Paul, …)
MQY as Q5 in the HL LHC era Glyn Kirby MQY 001 bat 927.
Magnetic axis tolerances for the SSS magnets
Brief report of the hardware commissioning activities
Commissioning of the LHC superconducting magnets systems: Why an LHC Hardware Commissioning? Specificity and complexity of this machine Roberto Saban.
Hardware Commissioning
Presentation transcript:

LHC Hardware Commissionning Electrical Qualif. of the Magnets Superconducting Circuits CERN 06/09-10/09 Technology Department (TE) Group (MPE) : The Machine Protection & Electrical Intergrity Design, construct, operate, maintain electrical equipments of magnets superconducting circuits. T.Roulet 1 16/12/2009

LHC Hardware Commissionning Electrical Qualif. of the Magnets Superconducting Circuits ELQA Team Magnets/Circuits Types of Tests Conditions/Method Results Non conformities MAGNETS TP4 DOC MIC PARAMET HVQ IRC ICC ORC QHR TFM T.Roulet 2 16/12/2009

Electrcal Quallif of Magnets Superconducting Circuits LHC Hardware Commissionning Electrical Qualif. of the Magnets Superconducting Circuits ELQA : 28p CERN Staff: 4p Polish collaboration (Phy.Nucl.Inst.Krakovi): 18p Help from PH department: 2p Help from SubContrators: 4p 5 Teams of 2 / Shift 2 X 8 / 4 Months T.Roulet 3 16/12/2009 T.Roulet 15/11/2009

LHC Hardware Commissionning Electrical Qualif. of the Magnets Superconducting Circuits Magnets 9672 MAGNETS / 1232 CRYOSTATS / 3552 Circuits Tested by ELQA For 1 Sector Magn Circuits Power MB main dipoles MQ quadrupoles MCD decapole MCS sextupoles MCO octupoles MQT quadrupoles MQTL quadrupoles MQS quadrupoles MS sextupoles corrector MSS skew sextup. Correct. MO octupoles correctors MCBC dipoles correctors MQM Ins.Reg.Quadrup. MCOSX Multip. Correct. MCBC Orbit. Correct. 154 168 156 308 60 4 8 85 6 40 30 22 10 2 1 5 3 18 13kA 5.9kA 600A 120A MCB Dipoles Orbit Correctors 114 80 A NbTi + Cu (ø 1 mm) Supraconducting Cable 6kA Quadripôles LHC (15 mm x 1,6 mm) T.Roulet 4 16/12/2009

(Quench Protection System) Dipoles Orbital Correct. LHC Hardware Commissionning Electrical Qualif. of the Magnets Superconducting Circuits Type of Circuits Tested : TP4/DOC/MIC TP4 Tests : 106x8 Circuits Main Magnets Circuits (50m 3km) MIC Tests : 224x8 Local Circuits Magnets Instrum. Check (Quench Protection System) Feed Box DOC Tests : 114x8 Local Circuits Dipoles Orbital Correct. T.Roulet 5 16/12/2009

LHC Hardware Commissionning Electrical Qualif. of the Magnets Superconducting Circuits TP4 Tests : Magnets Supercond. Circuits HVQ  = Magnets Circuits Insulation (High Voltage Qualification) ORC/IRC = Magnets resistance/Potentiel taps resistance (Ohmic Resistance Check/Instrumentation Resistance Check) ICC  = Potentiel Taps Order Instrumentation Continuity Check TFM  = Magnets Circuits Impedance (Transfert Function of the Magnet) TP4:HQV_IRC_ICC_ORC_TFM Feed Box Feed Box EX 1 SECTOR : 1 MAIN DIPOLES CIRCUIT =154 MAGNETS / 3Km T.Roulet 6 16/12/2009

LHC Hardware Commissionning Electrical Qualif. of the Magnets Superconducting Circuits DOC Tests : Local Dipoles Orbital Correctors Circuits HVQ  = Magnets Circuits Insulation (High Voltage Qualification) ORC_IRC = Magnets resistance_Pontentiel taps resistance (Ohmic Resistance Check_Instrumentation Resistance Check) TFM  = Magnets Circuits Impedance (Transfert Function of the Magnet) DOC:HQV_ORC_IRC_TFM T.Roulet 7 16/12/2009

LHC Hardware Commissionning Electrical Qualif. of the Magnets Superconducting Circuits MIC Tests (Local Magnets Instrum. Check) : Quench Heaters Circuits QH_HVQ = Quench Heaters Circuits Insulation (Quench Heaters High Voltage Qualification) QHR = Quench Heaters Resistance IRC  = Instrumentation Resistance Check (Potentiel Taps) Proxim. Equip. Potentiel Taps Quench Heaters T.Roulet 8 16/12/2009

Electrcal Quallif of Magnets Superconducting Circuits LHC Hardware Commissionning Electrical Qualif. of the Magnets Superconducting Circuits Conditions : Warm flushing Cool-down 80K 1.9K DOC (Dip.Orbt.Cor): 912 CIRCUITS HQV_IRC TFM HQV_IRC_TFM MIC (Magnets Instrum. Check): 1792 CIRCUITS QHVQ QHR_IRC QHVQ_QHR_IRC TP4 (Magnets Circuits) : 848 CIRCUITS IRC_ORC ICC_TFM HVQ HVQ_IRC_ORC 23880 TESTS ELQA by Shut-Down Shut-Do. Act ELQA Tests Cryo Tests ELQA Tests Power Tests T.Roulet 9 16/12/2009 T.Roulet 15/11/2009

LHC Hardware Commissionning Electrical Qualif. of the Magnets Superconducting Circuits Method : TP4 DOC MIC Equip. used DC Power Supply HV Power Supply Hz Gene. LabView 3 Programms ELQA Results CERN Web page ORACLE T.Roulet 10 16/12/2009

LHC Hardware Commissionning Electrical Qualif. of the Magnets Superconducting Circuits Method : Parameters 10 10000 TP4 Cryo Conditions 1 DOC T.Roulet 11 16/12/2009

LHC Hardware Commissionning Electrical Qualif. of the Magnets Superconducting Circuits LHC monitoring Sector 6.7 Cool-Down Monitoring system during Cool-Down Leakage current 1mA current nA 5 weeks T.Roulet 12 16/12/2009

LHC Hardware Commissionning Electrical Qualif. of the Magnets Superconducting Circuits Results : TP4_HVQ Main Dipoles : 154 Magnets Applied HV : 1900V Limit Leakage current : 50µA Voltage (V) 25 min Final Leakage current 21µA current nA Insulation Pb. between. Current Lead & Converter Pb with newQPS cables 5 min T.Roulet 13 16/12/2009

LHC Hardware Commissionning Electrical Qualif. of the Magnets Superconducting Circuits Results : DOC_HVQ Orbit Corrector : 1 Magnet Applied Voltage = 600V Limit Leak. current= 1000nA current nA Final Leak. Current = 821 nA Water inside the basket Final Leakage current = 30nA current nA 1 min T.Roulet 14 16/12/2009

LHC Hardware Commissionning Electrical Qualif. of the Magnets Superconducting Circuits Results : MIC_QHR_HVQ Final Leakage current = 42nA Magnet Instrum : 1 Quench Heater Applied Voltage = 2000V Limit Leak. current= 1000nA current nA Pb. Dust on PCB Final Leakage current = 8nA current nA 1 min T.Roulet 15 16/12/2009

LHC Hardware Commissionning Electrical Qualif. of the Magnets Superconducting Circuits Results : MIC_QHR_HVQ 1 Quench heater of Q1 magnet sector 12 = weak electrical insulation: Breakdown at 1200V Discussions between the magnet manufacturer (KEK Japan), people responsible for the integration (BNL, USA) and CERN. Was the test voltage appropriate (1200 V)? Can we protect this magnet with 1 only quench heater (out of 2)? Inspection of the Harting connectors installed on top of the Feed Box. T.Roulet 16 16/12/2009

LHC Hardware Commissionning Electrical Qualif. of the Magnets Superconducting Circuits Results : TP4_ORC Main Quadrupoles Resistance: 154 Magnets Applied current = 1.5A Limit Resistance = 200µ Ω Pb. Cryo Conditions Final resistance (513 µ V)=> 335µΩ Final resistance (157µ V)=> 102µΩ T.Roulet 17 16/12/2009

LHC Hardware Commissionning Electrical Qualif. of the Magnets Superconducting Circuits Results : TP4_ORC First sector cooled down this year =>, Adjusting cryo. parameters Resistance µΩ T.Roulet 18 16/12/2009

Pb. Instrumentation Cable LHC Hardware Commissionning Electrical Qualif. of the Magnets Superconducting Circuits Results : TP4_IRC Pb. Instrumentation Cable Main Quadrupoles Potentiel Taps of Current Lead: Applied current = 1A Limit Resistance = 3Ω Resistance Ω Potentiel Taps Resistance Ω Potentiel Taps T.Roulet 19 16/12/2009

LHC Hardware Commissionning Electrical Qualif. of the Magnets Superconducting Circuits Results : DOC_IRC Dipole Orbit Correct. Potentiel Taps of Current Lead : Applied current = 1A R limit VTap_C/ VTapW = 1mΩ R limit VTap_L_W/VTap_H_W = 2mΩ Pb. Cryo Conditions T.Roulet 20 16/12/2009

Tolerance with Parameters LHC Hardware Commissionning Electrical Qualif. of the Magnets Superconducting Circuits Results : MIC_IRC Magnet Instrumentation : Potentiel Taps for Quench Heaters Applied current = 1A R limit = 4Ω Resistance Ω Potentiel Taps Tolerance with Parameters T.Roulet 21 16/12/2009

Pb. With Update Parameters LHC Hardware Commissionning Electrical Qualif. of the Magnets Superconducting Circuits Results : MIC_QHR Magnet Instrumentation : Quench Heaters Resistance: Applied current = 200mA R limit = 26Ω Resistance Ω Quench Heater Pb. With Update Parameters T.Roulet 22 16/12/2009

LHC Hardware Commissionning Electrical Qualif. of the Magnets Superconducting Circuits Results : DOC_TFM Dipople Orbit Correct : Impedance Applied voltage = 10Vrms +90° Phase deg. Modulus Ω x1/ω xω -90° Frequency(Hz) T.Roulet 23 16/12/2009

Pb. Defective Solartron LHC Hardware Commissionning Electrical Qualif. of the Magnets Superconducting Circuits Results : TP4_TFM Main Dipole : Impedance Applied voltage = 2.5 Vrms +90° Modulus Ω Phase deg. xω Pb. Defective Solartron Frequency(Hz) T.Roulet 24 16/12/2009

LHC Hardware Commissionning Electrical Qualif. of the Magnets Superconducting Circuits Non Conformities : MIC_QH_HVQ Magnet Instrumentation : MB2413,A22R1 Quench Heaters Insulation: Applied voltage = 600V Leak. Current limit = 1µA Final Leak. Current = 11.2µA current µA 1 min To high leakage current High Field quench heaters. Low Field quench heaters are healthy. LowFields used as nominal protection instead of HighFields T.Roulet 25 16/12/2009

LHC Hardware Commissionning Electrical Qualif. of the Magnets Superconducting Circuits Non Conformities A26L2 V.tap EE211 found open, V.Tap Circuit shorted T.Roulet 26 16/12/2009

LHC Hardware Commissionning Electrical Qualif. of the Magnets Superconducting Circuits CONCLUSION Cryogenics conditions. Measurements accumulated on all LHC circuits => refine tolerances (process still on-going). New Qualifications of the “new.QuenchProtectionSystem”. T.Roulet 27 16/12/2009