600 A circuits resistance measurements

Slides:



Advertisements
Similar presentations
Frédérick BORDRY – LHCMAC 22- 6th December 2007 Review of the experience of LHC powering: short-circuit tests and sector 7-8 and start of powering sector.
Advertisements

New HV test specification for the LHC N. Catalan for the EI section.
TE-MPE –TM, 16/05/2013, Mateusz Bednarek, TE/MPE-EE ELQA testing during and beyond LS1.
1 Copper Stabilizer Continuity Measurement Project CSCM Mini Review Powering Implementation H. Thiesen 30 November 2011.
Powering Group of Circuit Doubts and proposals of the procedure reviewing team (Gianluigi, Rob, Sandrine, Matteo, Boris) Ref document: LHC-MPP-HCP-071.
1 Second LHC Splice Review Copper Stabilizer Continuity Measurement possible QC tool for consolidated splices H. Thiesen 28 November 2011 K. Brodzinski,
Powering of the Superconducting Circuits: Procedures and Strategies for Circuit Validation Antonio Vergara on behalf of the Hardware Commissioning Coordination.
LHC Hardware Commissioning Review May 2005, CERN, 1211 Geneva 23 1 LHC Hardware Commissioning Review Contribution ID: 20 – Quality assurance and.
HC Review, May 2005 Hardware Commissioning Review Hardware Commissioning Review Quality Assurance and Documentation of Results Félix Rodríguez Mateos,
1 Copper Stabilizer Continuity Measurement Project Copper Stabilizer Continuity Measurement Status & Plans – May 2011 MPE-TM – 12 May 2011 M. Koratzinos,
Frequency Transfer Function Measurements during LS1 Emmanuele Ravaioli Thanks to Arjan Verweij, Zinur Charifoulline, Andrea Musso MPE-TM
ELQA MP3 08 Septembre 2010, R. Mompo, TE/MTE-EI ELQA IPQs Splice measurements “New” current cycle applied since July 2010 Impact of low band passive filters.
Training LHC Powering R. Denz Quench Protection System R. Denz AT-MEL.
MTF – Manufacturing and Test Folder Large Scale Deployment of MTF Sonia Mallón Amérigo Elena Manola-Poggioli on behalf of the EDMS Team, TS-CSE.
HC Review F. Rodriguez-Mateos Powering tests The outcome of the work conducted within HCWG and many discussions among colleagues.
MPE Review – June 2, 2015 A. Erokhin, TE-MPE-EE Upgrade, IST and Powering tests of the Upgrade, IST and Powering tests of the 600A Energy Extraction Systems.
MP3 recommendations from June 2013-Feb 2014 Arjan Verweij on behalf of the MP A. Verweij, LSC meeting 7/2/2014 One of the tasks of the MP3 is.
Recent cross-wiring issue and implication for circuits protection Bozhidar Panev TE-MPE-CP
By Zinour Charifoulline, Scott Rowan Automation of Hardware Commissioning - Offline Analysis of 60A circuits.
AT-MEL-MI Hardware Commissioning Review, , Suitbert Ramberger 1 The Normal Conducting Magnets and their Circuits Suitbert Ramberger, AT-MEL-MI.
The Alloy Analyzer June 14 th Alloy small modelling notation that can express a useful range of structural properties is easy to read and write.
M. POJER, ON BEHALF OF THE USUAL BUNCH OF SUSPECTS… S UPERCONDUCTING CIRCUITS RE - COMMISSIONING AFTER THE 2011 C HRISTMAS BREAK.
Review of Sector th of February Electrical Safety for the interventions during Hardware Commissioning of LHC Anne Funken, TS-ICC.
Power Converters and DC cablesSlide 1/.. LHC - HC review Hugues THIESEN – AB/PO Thursday, 12 May 2005 Water cooled cables warm bus bars power converter.
BCWG - 16/11/20102 Content WHY do we need a HW Commissioning campaign? WHAT are we going to do? HOW are we going to do it? ElQA QPS Powering Tests Planning.
SAFETY DURING HARDWARE COMMISSIONING, 18 October 2007, D. Bozzini, AT/MEL-EM 1 Safety during Hardware Commissioning Davide Bozzini on behalf of the ELQA.
Actual Circuit Total inductance:15.4 H (154x0.1H) Total resistance:1 m  RB output current:13 kA RB output voltage:190 V Main Power Converter RB circuit.
MA PM performance, Adriaan Rijllart Post Mortem data handling and performance Adriaan Rijllart, Beno î t Pannetier, Boris Khomenko, Greg Kruk,
TE-MPE, MP3 Mini Workshop 2011, G.D’Angelo, 8-Mar ELQA PNO2 analysis tool and NCs Giorgio D’Angelo  Which circuits? Type? Schematic Ref. doc for.
Special interventions Status of production and QC Nicolas Bourcey TE-MSC-MDT Fourth LHC Splice Review November 2013.
MPE Workshop for LS1 / 22 & 23 Nov. 2012, G. D’Angelo TE/MPE-EE ELQA during LS1 train, Special measurements and NCs Magnet replacement: AIV Splices consolidations:
AT-MEL Group Meeting, CERN, 1211 Geneva 23 1 ElQA activities during hardware commissioning N. Catalan Lasheras.
Conclusions on UPS powering test and procedure I. Romera Acknowledgements: V. Chareyre, M. Zerlauth 86 th MPP meeting –
Malgorzata Macuda MTF Statistics Historic 1. September 2005 – March manual upload done by Esther Barbero Soto - upload via EDMS support ( s.
Protection of 600 A bus bars, follow up W. Venturini Delsolaro and A. Verweij MPP meeting, 17/10/2006.
Training LHC Powering - Markus Zerlauth Powering Interlocks Markus Zerlauth AB/CO/MI.
MPP Workshop Status of Powering Interlocks I. Romera on behalf of MPE-MS MPP Workshop, 12 June 2015, I. Romera (TE-MPE)1.
TE-MPE –EI, TE - MPE - TM 8/12/2011, Antonopoulou Evelina RQS circuit Simulation results Antonopoulou Evelina December 2011 Thanks to E. Ravaioli.
TE-MPE –EI, Circuit Modeling Meeting 4/8/2011, Antonopoulou Evangelia RQTL circuit First Simulation results Antonopoulou Evangelia August 2011 Thanks to.
Training LHC Powering Robin Lauckner Software Tools for Commissioning Robin Lauckner 28 th March, 2007.
 Automation Strategies for LHC System Tests and Re-Commissioning after LS1 Kajetan Fuchsberger TE-MPE LS1 Workshop On behalf of the TE-MPE-MS Software.
AB-CO Review September Session on circuit commissioning Session on circuit commissioning Post-Mortem requirements F. Rodríguez-Mateos on behalf.
PGC tests Test procedure and acceptance criteria for the Powering of Group of Circuits EDMS No
11T Quality Assurance O. Housiaux, R. Berthet, S. Menu, R. Principe 3rd International Review on the 11T dipoles at collimator Section for the HL-LHC 6-8.
Hardware Commissioning Review, R. Denz, 12-May Superconducting circuits: what remains to be done during hardware commissioning R. Denz AT-MEL-PM.
M. Modena and D. Wollmann 2 “MP3 Review Day”, 28 April 2015: Session 2: “Preparation for the Powering Tests”, M. Modena, D. Wollmann.
LHC Post Mortem Workshop - 1, CERN, January 2007 (slide 1/52) AB-CO Measurement & Analysis Present status of the individual.
MPP Result of the investigation in the orbit correctors faults.
Powering LHC magnets version 30/3/2007.
ELQA Electrical Quality Assurance
Giorgio on behalf of ELQA team
LHC Hardware Commissionning
Giorgio on behalf of ELQA team
Configuration Management and Layout Database ELENA Project
MP3 Review Software tools
MPE main activities planned for LS2
Status of ELQA equipment and related software
Recommissioning of sector 12 after a short warm-up during eYETS 2016/17 QBT, MP3 – May 2017 S. Le Naour.
Status of Magnet Setup Cycling for LHC
Powering from short circuit tests up to nominal
Circuits description and requirements - Closed Session-
Agenda Contents Different types of documents
Mike Lamont 4th HERA and the LHC workshop 26th May 2008
Ohm’s Law If the current I = 0.2A and the resistance R = 1000 ohms, solve for voltage. If V = 110V and R = ohms, how much current is flowing through.
Agenda 9:00-10:00 Beam Interlock System Changes Following the 2006 Audit Benjamin Todd 10:00-11:00 Beam Dump System follow-up from the 2008 Audit Jan Uythoven.
Wednesday 30th November 10:00 Access PZ33 for RP, Cryo, EPC, ELQA
Brief report of the hardware commissioning activities
Wednesday 23/2 Thanks CRYO!!!.
Online data analysis Franco J. Mangiarotti CERN – TE-MSC-TF
Electrical measurements and diagnostics
Presentation transcript:

600 A circuits resistance measurements Edward Nowak Wrap-up of hardware commissioning 2011 8th of Mars 2001

Procedure test MP3 Procedure - LHC-MPP-HCP-0003 ver. 3.0 #EDMS 874716 PCS: SPLICES VERIFICATION (±I_PCS) This test is to verify the low-current integrity of the splices. PNO.A3: BIPOLAR CYCLE This test is to verify the correct functionality of magnet and Current Leads at nominal current level as well as the high-current integrity of the splices. NOTA BENE: This test must be analysed by MP3 with the PCS Analysis Tool in the PM Event Analyser, to automatically transfer data to MTF Elqa can make also non standard test- type test in the tunnel

MTF RC03 - Superconducting 600 A Without EE Circuit RC06 - Superconducting 600 A With EE Circuit RC17 - Superconducting 600 A Without EE With Crowbar Circuit Easy last data but previous on request to EDMS

HC 2011

Should be : RPNO = R± = 1.318E-06 Ohm Fake data in the MTF RPNO 9.731E-06 Ohm R±45 9.731E-06 Ohm ? Should be : RPNO = R± = 1.318E-06 Ohm

HC 2011

RQTL11.R2B2 R±45 21.228E-06 Ohm < R±350 31.41E-06 Ohm Test passed 

Without RQTL11.R2B2 RQTL11.R2B2 out of range RCO RQ6

HC 2011 and 2009

Resistance per splice

HC 2011 and 2009

Histogram of resistance/splice in MQT% HC 2009 HC 2011

RQT13.L7B1 - history

Conclusions Transfer data from PCS application to MTF Operator mistake Application bug (PCS or MTF) Re-measure a resistance of RQTL11.R2B2 circuit Do we really know how many and what kind of splices is in measured 600A circuit? Does PCS application take proper number of splices?