Reducing “Unknown” Misoperation Causes

Slides:



Advertisements
Similar presentations
WECC Board of Directors April 21-23, 2004 Seattle, Washington WECC Procedure for Reporting of System Events Disturbance Reports Rod Maslowski OC Vice Chairperson.
Advertisements

Summary of Second Draft of the NERC Standard PRC Disturbance Monitoring and Reporting JSIS Meeting August 10, 2010 Salt Lake City, UT.
Definition of Firm Energy and Interruptible Transmission Two Issues Causing Problems for Business in the Western Interconnection.
Operating Reserves --- Again A Discussion Primer
The Western Electricity Coordinating Council Doug Tucker Associate Engineer September 22, TRD/TADS Webinar.
Doug Tucker Associate Staff Engineer TRD/TADS update and Future reporting.
Transmission Operator Protection System Misoperations 2014 ERCOT Transmission Protections System Misoperations Data – 138kV and 345kV Combined (Not including.
PER
2014 System Operator Conference 1 Protection System Misoperations: Why Should a System Operator Give a Hoot? April 17 & May 1, 2014 – Charlotte, NC September.
August 14, 2003 Blackout Final Report
Change Advisory Board COIN v1.ppt Change Advisory Board ITIL COIN June 20, 2007.
National Association of College and University Attorneys 1 November 11, 2009 NACUA Fall 2009 Workshop November 2009.
Transmission planning in Vermont Past, present and future Docket 7081 workshop By Dean LaForest 9/19/05.
Support Systems and Tools Brittany Power Data Coordinator.
Entity Registration Under EPAct 2005 Public Power Council April 6, 2006 Louise McCarren Chief Executive Officer WECC.
EMERGENCY MANAGEMENT PLANNING. COUSINO HARRIS DKI EMERGENCY MANAGEMENT PLANRESPONDRESTORE.
The Account Executive’s Job Description. Account Service Advertising is an ideas business. People create ideas. Good account executives like working with.
Actions Affecting ERCOT Resulting From The Northeast Blackout ERCOT Board Of Directors Meeting April 20, 2004 Sam Jones, COO.
Overview of WECC and Regulatory Structure
WPPI – Member Reliability Standards Compliance 2007 APPA National Conference Given by Mike Stuart June 25, 2007.
Cigre B5 – 06 Working Group Presentation Protection and Control Asset Program Management John Robertson March 25, 2008.
February 26, 2013 Board of Directors Meeting 2012 ERCOT Region Reliability Update.
Curtis Crews, Reliability Services Texas Reliability Entity, Inc. Changes in Relay Misoperations Reporting.
Gen Maintenance w/ GridView DWG – Dec. 14, 2015 W ESTERN E LECTRICITY C OORDINATING C OUNCIL WECC System Adequacy Planning.
1 1- Introduction Focus of Human Factors: Human factors (or ERGONOMICS) focus on human beings and their interaction with products, equipment, facilities,
Misoperations Reduction Strategy
Kenneth Silver Los Angeles Department of Water & Power
MOPC Meeting Oct , 2016 Little Rock, AR
NERC Published Lessons Learned Summary
About Georgia Transmission Corporation (GTC)
Utility Needs and Smart Grid for Major Storm Events
NOGRR-169 OWG discussion Bill Blevins June 28, 2017.
Steve Rueckert – Director of Standards
Advanced Fuse-Saving Techniques
WECC Regional Standards Update
NERC Published Lessons Learned Summary
Presenter Name, organization
PRC Implementation Plan and Summary of Devices
the CERN Electrical network protection system
What is an Operation and Misoperation
Removal of Fraser RAS from RAS Databse
NERC TPL Standard Overview
MIC Committee Discussion
Misoperations in the West: Lay of the Land
Specifications Updates and Approval
Compliance Open Webinar
Commissioning: Best Practices and Possible Traps
Western Electricity Coordinating Council
WECC August 2017 Reliability Workshop James Merlo, PhD
Value of Trending: Application Exercise
WECC Performance Analysis
2018 State of the Interconnection Overview
How to Build a Successful Corrective Action Plan
WECC August 2017 Reliability Workshop James Merlo, PhD
Value of Trending: Application Exercise
Misoperations Reduction Strategy
Marketing Your Student Organization
What is an Operation and Misoperation
Reliability Assurance Initiative (RAI) 101
Randy Spacek AvistaCorp, RWG chair
Compliance Open Webinar
Commissioning: Best Practices and Possible Traps
Misoperations in the West: Lay of the Land
Support Systems and Tools
Presenter Name, organization
Removal of Fraser RAS from RAS Databse
Western Electricity Coordinating Council
TPL Voltage Guideline Presented to TSS Baj Agrawal Arizona Public Service Co. 8/21/2017.
Reducing “Unknown” Misoperation Causes
System Review Work Group Update to TSS
Presentation transcript:

Reducing “Unknown” Misoperation Causes Bill Middaugh, Tri-State G & T Western Electricity Coordinating Council

Western Electricity Coordinating Council Tri-State G & T Ass’n. 5485 Miles of Transmission Lines at 115 kV or higher About 140 Substations with Relays Protecting BES Elements Most in WECC but some in the MRO Western Electricity Coordinating Council

Tri-State Organization 43 customers Each customer (TSGT Member) has a representative on the Tri-State Board of Directors Each Member’s operations manager receives copies of interruption reports and is comfortable with contacting our executive management Western Electricity Coordinating Council

What’s Working at Tri-State Each customer gets copies of our operation reports so they can tell if an outage they had was associated with a correct operation. They are comfortable with contacting our executive management directly. Identifying and mitigating misoperation causes has been a high priority for a long time. PRC-004 NERC expectations. Use of tools such as DFRs and mproc relays leads to successes in identifying causes. Management support. Culture of expected identification of causes. Western Electricity Coordinating Council

EVERY MISOPERATION HAS A CAUSE Tenet #1 EVERY MISOPERATION HAS A CAUSE Western Electricity Coordinating Council

THE CAUSE OF EVERY MISOPERATION CAN BE IDENTIFIED Tenet #2 THE CAUSE OF EVERY MISOPERATION CAN BE IDENTIFIED Western Electricity Coordinating Council

Western Electricity Coordinating Council NERC Expectations PRC-004-5(i) – Application Guidelines: Requirement R4 is intended to provide a mechanism to continue a diligent review of Misoperations to determine causes after the time periods defined in Requirements R1 and R3 and not to provide an immediate opportunity to classify the cause as “Unknown.” Disclaimer – I am not an auditor, but I believe that the language in R4 requires entities not to declare a Misoperation as “Unknown” until at least two full calendar quarters after the Misoperation identification. Western Electricity Coordinating Council

Western Electricity Coordinating Council Tools 40 Substations with digital fault recorders Over 260 Substations with microprocessor relays Almost 120 substations have microprocessor relays protecting BES elements Western Electricity Coordinating Council

Western Electricity Coordinating Council Intangibles Management Support Installation of DFRs and relays with event capability Allow engineers and technicians the time to research Culture of expected identification Western Electricity Coordinating Council

Western Electricity Coordinating Council Summary We believe that the cause of every misoperation can be identified. Western Electricity Coordinating Council

To Reduce “Unknown” Misoperation Causes… If you are finding that insufficient data is available to identify causes, stress the importance of recording tools. The Benefit? Customer satisfaction and perhaps less RE and ERO scrutiny. Consistent, early, thorough evaluation of operations and Misoperations can lead to faster and more accurate classification, allowing more time to spend with the ones you love! Every Misoperation has a cause, and it can be identified. Western Electricity Coordinating Council