Small Column Insulated Delay (SCID) Issues

Slides:



Advertisements
Similar presentations
APPROVAL OF CHECK AIRMEN AND FLIGHT INSTRUCTOR
Advertisements

New York City Department of Education Charter Matching – Facilities Upgrades/ Capital Improvements – FY 2014.
VETERANS OF FOREIGN WARS Subscription Dues Training&Implementation.
This teaching material has been made freely available by the KEMRI-Wellcome Trust (Kilifi, Kenya). You can freely download, adapt, and distribute this.
History of New Crane & Derricks Standard July 30, 2003: C-DAC first meeting July 30, 2003: C-DAC first meeting Committee met 11 times Committee met 11.
ARRA Project Oversight 2010 WTBA Contractor/Engineer Conference 1/21/2010.
The Working Smarter Programme Paul Milmore Programme Manager 4 th November 2010.
IL PHA EFFICIENT LIVING ENERGY PROGRAM GUIDELINES University of Illinois at Urbana-Champaign DCEO Northern Illinois Trade Ally Rally | July 24, 2014.
Results of pilot benchmark study Anfried Sauerborn/René Colin EAQG Metrics WGtApril 2008.
YEAR 2000 STATUS Peter Georges Year 2000 Project Manager March 4, 1998.
Chapter 22: Accounting for Inventory By: Audrey Marshall.
AT&L / Logistics & Material Readiness Office of Deputy Assistant Secretary (Supply Chain Integration) Government Furnished Materiel Requisitions GFP Working.
B1B AIRCRAFT MAINTENANCE HANGAR DAHA99-01-R-4001 Debriefing July 16, 2001.
Substation L1/ Booster Substation Y-BE2 Update #3 August 15,2012.
The SaTH Foundation Trust Programme Deborah Shaw March 29th 2007.
© The McGraw-Hill Companies, Inc., Just-in-Time and Lean Systems.
PMO Update to PRS Troy Anderson ERCOT Program Management Office June 17, 2010.
01-05 October 2007 Heppenheim, Germany eb - 1 SMWG Closing Plenary Report Fall 2007 Meeting Erik Barkley 5 October 2007.
1 THE EVALUATION OF STATE PROCUREMENT SYSTEM Joint Stock Company «National Power Network of Kyrgyzstan» Experts: Bazakeeva Zhyldyz Zhamanchaevna Abdymomunova.
Alternative Rate Structure Paul Smith Vice President, Rates Duke Energy Ohio June 20, 2006.
WBS Experiment Infrastructure: LArTF GPP Project Status Dixon Bogert Prepared for the MicroBooNE Collaboration Meeting 11/02/12.
Chapter 2-Part A. Filing Requirements, Estimated Tax Statute of Limitations Penalties Edited September 7, 2016 Howard Godfrey, Ph.D., CPA Professor of.
Pollution Prevention & Management DentalBMPs. Overview Amalgam in POTW New EPA Guidelines City of Tulsa Dental BMPs.
JL47 PERIPHERY, MILD DETONATING CORD
Agenda Program Manager, Air (PMA)-201 Organizational Structure
Chapter 14 Inventory Control.
CAD/PAD Ordnance Assessment (OA) & Surveillance
T-6 Ballistic Canopy Fracturing Initiation System (CFIS-B)
CAD/PAD Development Process
Final Expenditure Report General Instructions
Return/Wasted Vaccine Reporting
Customer Advocate, Army CAD/PAD
CAD/PAD Life Cycle Sustainment Plan (LCSP) 2017 CAD/PAD International Logistics meeting Lee Manis USN/USMC CAD/PAD APML 23 May 2017.
Program Integrity Reforms Personal Care and Home-Based Services
Parliament and the National Budget Process
Laser Monitoring System On behalf of the Caltech group
MT23/JM61 FIRE EXTINGUISHER CARTRIDGE
Service Life Extension (SLE) Request and Program Office SLE Oversight
HL Consolidation Day Analysis of needs from BE-ICS
USN/USMC CAD/PAD Program Overview 2017 CAD/PAD Industry Summit
USAF CAD/PAD Program Overview
CAD/PAD Requirements Determination
XW36 and MG67 MK 205 Mod 1/2 Catapult Cartridge MK 113 Mod 0/1 Rocket Motor Assembly Tina Simms CAD/PAD Logistics 23 May 2017.
2018 Adopted Budget February Financial Plan
Foreign Military Sales (FMS)
Redundancy and diverse routing for data exchange
PRODUCTION PLANNING AND CONTROL
US Army CAD/PAD Program Overview CAD/PAD Industrial Summit 23 May 2017
Purchase Requisition (PR) Training
USN/USMC CAD/PAD Program Update 2017 CAD/PAD International Logistics Meeting Jurgen Smith USN/USMC CAD/PAD DPM 23 May 2017.
Improvements to Power Management
Detonating Cord Assembly (DCA)/ Thin Layer Explosive (TLX) Delivery Delays & Performance Issues Ben Kerlin, CAD/PAD, In-Service Engineering Detonating.
CONTROL AND SERVICE TECHNOLOGY LTD
Overall Project RAG Status:
Handheld for SAP B1
ViVa_MultimediaStoryboard
2017 International Logistics Meeting (ILM)
EUC Project Timelines Key Upcoming Dates:
Rekeying Protocol Fix Date: Authors: Month Year
June 19 Timelines Key Upcoming Dates:
CEOS Work Plan Progress Report & Update
Motivation for Vendor Specific Request Element
June 19 Timelines Key Upcoming Dates:
CP Replay Attack Protection
Initial Licensure Process, Survey Types & Licensure Action
The Billing Process.
Service Delivery Summaries
Risk Description: Bus Tapes
Ad Hoc Team (AHT) Lifecycle
Regulation and Licensing Department RLD Permitting and Inspection Software Modernization Change (Planning) Request Agency CIO/IT Lead - Michelle Langehennig,
Presentation transcript:

Small Column Insulated Delay (SCID) Issues Jeffrey Peters NSWC IHEODTD 23 May 2017

Small Column Insulated Delay (SCID) JL56 XW55 JL57 XW54 MC60 SCIDs B-1 PNs JN10 WB56 JN11 JL56 WB55 JN12 WB54 XW54

ISSUE During Ordnance Assessment (OA) testing of the WB55 (F-18) October 2012 several units failed to function when initiated Led to decrease the installed time limit from 48 to 24 months Several JL56 (T-6) units failed to function during July 2014 OA testing Aircraft switched to SOLO mode to bypass JL56 Contractor replaced several lots worth of units Two XW54 (F-18, T-45) units failed to function during 2017 OA testing Effected lots removed from service Closely monitoring lots remaining in-service Doubling the WB55 requirement and replacement of JL56 units has strained the contractor’s capability, leading to delivery delays Limited Service Life Extensions (SLE) possible All SCID items tend to slow with total age and installed time With observed no-fires, little or no extension is possible on WB55/JL56/XW54

PATH FORWARD JL56 Vendor increased production. Replacement lots being delivered, currently out of Stock. New production deliveries due in Nov 2017 Delivering new design (New Part Number & NSN) JL57 A reduced shelf/service life is being considered for delay timing Current: 84/48 months shelf/service; proposed: 48/24 months shelf/service NOTE: T-6 BOTH/SOLO/CMD FWD use must be authorized by The Program Office WB55 Request expedited deliveries from Vendor Redesign in qualification with goal of achieving at least prior life limits Considering MC50 production run

PATH FORWARD CONTINUED For all SCID items: Continue to monitor items through OA, testing more regularly than standard item Vendor has increased production with new hires Current inventory will be strictly monitored Manufacturing order and priority are being closely monitored based on requirements Estimated date to return to prior ages and stock levels: January 2020