PROGRESS REPORT AS OF: END JULY 2017

Slides:



Advertisements
Similar presentations
FY12 Expenditures and Caseload Update Fiscal Committee September 10, 2012.
Advertisements

1 BROOKHAVEN SCIENCE ASSOCIATES Central Chilled Water Facility – Phase II Alan Raphael MPO Project Manager CFAC Committee Review November 9, 2009 Sub-basement/Pipe.
Agile Programing Methods Drew Arrigoni. The Agile Manifesto ● Individual Interactions over Processes and Tools ● Working Software over Comprehensive Documentation.
Phase Difference = Phase Difference = 0.05.
CEAL January 31, Existing Alternative (Preferred Align) Objectives SR-76 Corridor Expand Mobility Improve Safety Enhance natural resources Synergy.
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
State Road Agency of Ukraine CO-OPERATION WITH THE INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT.
ARRA Project Oversight 2010 WTBA Contractor/Engineer Conference 1/21/2010.
TADIPUDI LIFT IRRIGATION SCHEME
Chapter 15 Construction Scheduling. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Identify.
PEDDAGEDDA PROJECT Project cost : Crores Ayacut : Acres
ERCOT Financial Summary For the Month Ended September 30, 2005
Asbestos in Soil Greg Holt Stapleton Redevelopment Program City and County of Denver October 3, 2008.
LEFT LINK CHANNEL 540M RIGHT LINK CHANNEL 210 M LEFT HEAD SLUICE RIGHT HEAD SLUICE PROPOSED RIGHT MAIN CANAL 1,20,000 ACRES Km Km LEFT.
VELIGONDA PROJECT 1. Teegalem Canal (48.15 km) 62,000 Ac
30Nos. Distributaries under the 3 canals are in progress and are to be completed by 3/2006. Lining works for all 3 Main Canals proposed in package 94,
06 August EHN1 civil engineering project status (JULY) Summary: Updating of the activities carried out on-site (Done) in JULY List activities on.
(Water Availability : 57.50TMC, Ayacut proposed: 2,55,510Acs)
E GNV Orange County Solid Waste Management Facility Southern Expansion Site Project.
PHASE – I & PHASE - II.
Welcome To!.
Lecture note 3-1 Summarizing Relationships among variables ©
Welcome to the Community Advisory Board Meeting Second Life (SL) Meeting #2 September 28, 2015.
December 3, 2015 TOWN OF MILLBURY DPW, MA Robert McNeil, P.E., Director PARE CORPORATION, FOXBORO, MA Allen R. Orsi, P.E., Managing Engineer This project.
Evaluation Plan Steven Clauser, PhD Chief, Outcomes Research Branch Applied Research Program Division of Cancer Control and Population Sciences NCCCP Launch.
SRI RAMA SAGAR PROJECT STAGE-II
Telekom Research & Development Sdn. Bhd. All Rights Reserved © 2010 Template Change Request – 3.0 mm PROJECT CHANGE REQUEST > Telekom Research & Development.
MODELING REVETMENT REMOVAL AND IMPLICATIONS FOR MEANDER MIGRATION OF SELECTED BENDS RIVER MILES 222 TO 179 OF THE SACRAMENTO RIVER Eric W. Larsen Dept.
52, 060 Ac. Cap TMC Cap TMC 28, 000 Ac. Under Progress.
Salmon River CSD Capital Project Phase II Monthly Status Report March & April 2016.
Long-Baseline Neutrino Facility LBNF Far Site Conventional Facilities (FSCF) Scope and Interface Overview Tracy Lundin as borrowed from Headley & Willhite.
基 督 再 來 (一). 經文: 1 你們心裡不要憂愁;你們信神,也當信我。 2 在我父的家裡有許多住處;若是沒有,我就早 已告訴你們了。我去原是為你們預備地去 。 3 我 若去為你們預備了地方,就必再來接你們到我那 裡去,我在 那裡,叫你們也在那裡, ] ( 約 14 : 1-3)
AEON GLOBAL SCM SDN. BHD. Development 20 th Feb 2014 BUMTDevelopment.
Museum of Islamic Art Project Package # 3 Site Logistics and Progress Presentation.
FLOW DIAGRAM OF C.B.R RIGHT CANAL (LINGALA CANAL FROM KM TO KM ) WORKS GROUNDED COMPLETED CHITRAVATHI BALANCING RESERVOIR (Existing) KM 0.00.
Area Covered. Work Done Quantity Financial Progress of work.
‘Reply Form’ SUBSURFACE ASSET MANAGEMENT & SURVEYING SEMINAR (SAMS ‘17) Hotel Istana, Kuala Lumpur 6 – 7 November 2017 The Secretary, Persatuan Juruukur.
Plan Sales Vs. Actual Sales by Month Gross Margin by Category
Scope & Milestone - Category/Supplier/Schedule -
Patient Satisfaction Survey
12/10/ /10/2012.
Coordination meeting 12/05/15
Results of the First Phase of the OS 11th IG meeting
LAND DEVELOPMENT INVESTMENT OPPORTUNITY ANTALYA, TURKEY
History of Pool Construction
Updating the System Milestones
Understanding and Managing Erasmus+ International Credit Mobility
Copyright 2013 Jitasa - Confidential - For Internal & Approved Use Only
Sharpen up Saturdays
دوافع الحملة الإعلامية
Слайд-дәріс Қарағанды мемлекеттік техникалық университеті
.. -"""--..J '. / /I/I =---=-- -, _ --, _ = :;:.
PAIN OUT network in Mexico
New Guides on social security where are we now?
PCC Update 10/28/09 Planning Phase
Engineering for Professional training
II //II // \ Others Q.
I1I1 a 1·1,.,.,,I.,,I · I 1··n I J,-·
The project´s specifications, and the connection between the contract´s different specifications.
Research Participant Satisfaction
$ $
i2i Convening – Geneva June Findings from the Post Convening Survey
EUROSTAT Meeting, Luxembourg, 6/7 December, 2001
Strategic Planning Timeline Overview


Land Reclamation.
. '. '. I;.,, - - "!' - -·-·,Ii '.....,,......, -,

National Agricultural Statistics Service
Presentation transcript:

PROGRESS REPORT AS OF: END JULY 2017 CADANGAN TAMBAK LAUT SELUAS 66 EKAR UNTUK TUJUAN PEMBANGUNAN DI ATAS TANAH KERAJAAN KAWASAN BANDAR XL, DAERAH MELAKA TENGAH, MELAKA PHASE I – PLOT I AND E PHASE II – PLOT F, G, J, K, L PROGRESS REPORT AS OF: END JULY 2017

Executive Summary: Developer :- Egah Group Sdn Bhd Main Contractor :- Gold Palm Global Bhd Contract :- Execution & Completion Of Reclamation Works, Revetment Works & All Related Works Contract Period :- 15 September 2015 to 14 July 2016 (10 months) LAND RECLAMATION WORKS PLOT PLOT AREA (m2) AREA DONE (m2) PROGRESS (%) E 30351.495 29280.09 96.47% F 19587.289 18441.433 94.15% SL1 1505.735 0.00 0.0% G 13638.003 6918.559 50.73% I 96680.195 83908.741 86.79% SL2 12237.217 10229.089 83.59% SL3 3844.757 J 81343.413 SL4 16335.782 K 22581.171 L 2918 TOTAL 301023.057 m2 TOTAL AREA DONE 148777.912 m2 OVERALL RECLAMATION PROGRESS : 55.85% REVETMENT WORKS PLOT TOTAL LENGTH (m) ACTUAL DONE (m) PROGRESS (%) E 339.63 290 85.38% F 197.479 - SL1 14.628 G 155.348 I 780.446 633.976 81.23% SL2 20.319 100% SL3 30.676 J 461.233 SL4 31.089 K 322.249 TOTAL 2353.10 m TOTAL DONE 944.295 m OVERALL REVETMENT PROGRESS : 40.13%

Layout of 66 Acres

Work Progress

Mud Clearance using Longarm excavator at Plot I on 5/7/2017

Mobilizing Excavator to Plot I on 8/7/2017

Surveying Works for Revetment Repair at Plot I on 15/7/2017

Revetment Repair in progress at Plot I on 17/7/2017

Revetment Repair in progress at Plot I on 18/7/2017

Revetment Repair in progress at Plot I on 19/7/2017

Revetment Repair in progress at Plot I on 20/7/2017

Revetment Repair in progress at Plot I on 21/7/2017

Revetment Repair in progress at Plot I on 22/7/2017

Surveying Works for Revetment Repair at Plot E on 26/7/2017

Revetment Repair in progress at Plot I on 29/7/2017

Revetment Repair in progress at Plot I on 30/7/2017