P. Sievers/CERN. A. Ushakov/Univ. Hamburg. S. Riemann/DESY-Zeuthen.

Slides:



Advertisements
Similar presentations
Photon Collimation For The ILC Positron Target Lei Zang The University of Liverpool Cockcroft Institute 24 th March 2007.
Advertisements

Matt Rooney RAL The T2K Beam Window Matt Rooney Rutherford Appleton Laboratory BENE November 2006.
Proposal for a programme of Neutrino Factory research and development WP-3 The Target The Neutrino Factory Target Lead Author - J R J Bennett CCLRC, RAL.
The Current T2K Beam Window Design and Upgrade Potential Oxford-Princeton Targetry Workshop Princeton, Nov 2008 Matt Rooney.
Mike Fitton Engineering Analysis Group Design and Computational Fluid Dynamic analysis of the T2K Target Neutrino Beams and Instrumentation 6th September.
Michael Butzek, Jörg Wolters, Bernhard Laatsch Mitglied der Helmholtz-Gemeinschaft Proton beam window for High Power Target Application 4th.
for a neutrinos factory
Status of T2K Target 2 nd Oxford-Princeton High-Power Target Workshop 6-7 th November 2008 Mike Fitton RAL.
 Stephen Brooks / UKNF meeting, Warwick, April 2008 Pion Production from Water-Cooled Targets.
The JPARC Neutrino Target
ILE, Osaka Concept and preliminary experiment on protection of final optics in wet-wall laser fusion reactor T. Norimatsu, K. Nagai, T. Yamanaka and Y.
Simulation on ILC undulator based source with liquid lead target Wanming Liu ANL.
2009 Linear Collider Workshop of the Americas Amann - 10/01/09 Global Design Effort 1 Status Update 18MW ILC Beam Dump Design John Amann Mechanical Engineer.
Radiation Cooling of the ILC positron target LCWS 2014, Belgrade, Serbia 7 th October 2014 Sabine Riemann, DESY, Peter Sievers, CERN/ESS, Andriy Ushakov,
KT McDonald MAP Spring Meeting May 30, Target System Concept for a Muon Collider/Neutrino Factory K.T. McDonald Princeton University (May 28, 2014)
Study of a new high power spallation target concept
Design of the Photon Collimators for the ILC Positron Helical Undulator Adriana Bungau The University of Manchester Positron Source Meeting, July 2008.
Horn design for the CERN to Fréjus neutrino Super Beam Nikolas Vassilopoulos IPHC/CNRS.
Status of target and photon collimator work for polarized e+ LCWS 2014, Belgrade, Serbia 7 th October 2014 Sabine Riemann, Friedrich Staufenbiel, DESY.
PSB dump: proposal of a new design EN – STI technical meeting on Booster dumps Friday 11 May 2012 BE Auditorium Prevessin Alba SARRIÓ MARTÍNEZ.
Radiation Cooling of the ILC positron target ALCW 2015, KEK, Tsukuba, Japan 24 th April 2015 Felix Dietrich (DESY), Sabine Riemann (DESY), Peter Sievers.
Heat load of the radiation cooled Ti target of the undulator based e+ source Felix Dietrich (DESY, TH-Wildau),Sabine Riemann(DESY), Andriy Ushakov(U- Hamburg),
F. Regis, LINAC4 – LBS & LBE LINES DUMP DESIGN.
Calculation of Beam loss on foil septa C. Pai Brookhaven National Laboratory Collider-Accelerator Department
1 Alexander Mikhailichenko Cornell LEPP, Ithaca, NY Linear Collider Workshop of Americas ALCPG, September 30, 2009 Albuquerque NM LITHIUM LENS STUDIES.
Contents Beam Dump Work Program submitted to UK funding agencies Motivation to study pressure waves Progress so Far -Energy Deposition -Pressure wave calculation.
SPL-SB and NF Beam Window Studies Stress Analysis Matt Rooney, Tristan Davenne, Chris Densham March 2010.
Mitglied der Helmholtz-Gemeinschaft Jörg Wolters, Michael Butzek Focused Cross Flow LBE Target for ESS 4th HPTW, Malmö, 3 May 2011.
Status: Cooling of the ILC e+ target by thermal radiation LCWS 2015, Whistler, Canada 3 rd November 2015 Felix Dietrich (DESY), Sabine Riemann (DESY),
G.Kurevlev - Daresbury meeting Collimators Material Damage Study Previous results In our group - Adriana Bungau’s thesis - heat deposition on.
R. ArnoldCLIC08, CERN, 16 Oct Heat and Radiation in the Water and Shielding in the18 MW Water Dump for ILC Preliminary Results from FLUKA and FLUENT.
F.Staufenbiel / EuCARD 2 / Heat load and stress studies of the ILC collimator G. Moortgat-Pick 1;2 S. Riemann 2, F. Staufenbiel 2, A. Ushakov.
Present status of production target and Room design Takashi Hashimoto, IBS/RISP 2015, February.
Task2: Liquid Metal Target Thermo hydraulic and structural analysis of the Eurisol liquid metal target Ashrafi-Nik M. * C.E.R.N, AB Department, ATB Group.
Paul Scherrer Institut 5232 Villigen PSI EURISOL Town Meeting Pisa, March 30-April 2, 2009 / W. Wagner PAUL SCHERRER INSTITUT EURISOL Spallation Neutron.
Design for a 2 MW graphite target for a neutrino beam Jim Hylen Accelerator Physics and Technology Workshop for Project X November 12-13, 2007.
Heat, Temperature, Heat Transfer, Thermal Expansion & Thermodynamics.
1 Target Introduction Chris Densham STFC/RAL Mu2e Target, Remote Handling, and Heat & Radiation Shield Review Nov
G.Kurevlev - Manchester meeting1 Collimators Material Damage Study Previous results In our group - Adriana Bungau’s thesis - heat deposition on.
Design Principals for ILC- Positron Targets Peter Sievers-CERN-ESS POSIPOL 2013,Argonne P.Sievers/POSIPOL131.
KT McDonald MAP Spring Meeting May 30, Target System Concept for a Muon Collider/Neutrino Factory K.T. McDonald Princeton University (May 28, 2014)
Chopper Beam Dump Thermal Problem 10/27/20101PX Linac FE Technical Discussions.
1 Chapter 5 Mass and Energy Analysis of Control Volumes.
Chiara Di Paolo EN-STI-TCD Material Choice for the Vacuum Window at the Exit of BTM.
Irradiated T2K Ti alloy materials test plans
New nTOF target: Design Issues
Chapter 19 Heat and the First Law of Thermodynamics
POSIPOL 2016 at LAL/Paris, Sept Peter Sievers-CERN
2016/12/6 Yasuhiro R&D status of a gas-compressor based 2-phase CO2 cooling system for FPCCD vertex detector 2016/12/6 Yasuhiro Sugimoto.
ILC main dump issue AWLC /26
Primary Vacuum Window and Water Dump for the ILC-Photon Beam
Positron production rate vs incident electron beam energy for a tungsten target
Test of Hybrid Target at KEKB LINAC
Rotation Target R and D of ILC E-driven source
Xiaomin Pang, Yanyan Chen, Xiaotao Wang, Wei Dai, Ercang Luo
PHYS 1443 – Section 003 Lecture #21
The ILC positron source target using cooling by thermal radiation
Beam Window Studies for Superbeams
Physical Science Chapter 6
Undulator based e+ source: “Staging” Mini-Workshop
Figure 2.9 T-s diagram for converging only nozzle
Beam Dump outline work plan (UK perspective)
Chapter 5 The First Law of Thermodynamics for Opened Systems
Parameters of the NF Target
EUROnu Beam Window Studies Stress and Cooling Analysis
Overview of mechanical design & construction
PROPOSAL OF APERTURE FOR THE INNER TRIPLET
Laser Cutting Archish Bharadwaj V S
RC1 Prototype Conceptual Design Review 15 December, 2005
SPL-SB and NF Beam Window Studies Stress Analysis
Presentation transcript:

P. Sievers/CERN. A. Ushakov/Univ. Hamburg. S. Riemann/DESY-Zeuthen. Photon Dump for the Undulator Driven Positron Source AWLC 2017, SLAC 26 June 2017 P. Sievers/CERN. A. Ushakov/Univ. Hamburg. S. Riemann/DESY-Zeuthen.

Content Introduction. The Tumbling Window. The Water Dump. Discussion and Conclusion.

1.Introduction An undulator with 250 GeV and 2625 bunches is assumed.High Lumi. Computations for 125 GeV and 1312 has still to be done. Simple down scaling is not good enough. FLUKA computations for the passage of the photon beam through thin Ti-windows and in water were made for High Lumi. They show, that the energy deposition EDD in thin windows rises linearly with the thickness and the radial distribution is close to the profile of the incident photon beam.

To investigate the influence of the photon beam size, which depends due to its divergence, on the Target-Window distance, two cases have been considered. Close Window, at 48 m from the target. Far Window, at 1 km from the target.

2. The Tumbling Window As presented previously in the recent Morioka Workshop, a stationary Ti-window will suffer from elevated temperatures, thermal stresses and fatigue and radiation damage. Only very thin windows of 0.1-0.2 mm thickness can be used. Since the photon beam cannot be swept, the window has to be “swept”. Therefore a “Tumbling Window” is considered.

Lay Out of the Tumbling Window

The tumbling movement, the frequency, is 0 The tumbling movement, the frequency, is 0.16 Hz, enough to displace the window by one beam width between pulses. The time between hits of the same spot is thus 6.4 s, much longer than for a stationary window with 0.2 s. Number of hits per spot is reduced by a factor 32. Therefore gas cooling is much simpler for the tumbling window. Optimize gas pressure and gas velocity.

To accommodate the beam signature on the window, a circle with a diameter of 5 cm, the diameter of the window has to be 8 cm. For the flow of the buffer gas, injected downstream of the window, air or better He of several kg/h is to be used.

Design Figures for the «Close» Tumbling Window at High Lumi Window Thickness ( mm) 0.1 0.2 ΔT/Pulse ( K) 47. 94. Thermal Stress/ Pulse (MPa) 71. 141. Peak Temp. in Steady State with He-Gas Cooling 1Atm. ( C). 67. 114. Static Stress by Gas Pressure at 1 Atm (5 Atm) (MPa). 20. (100.) 10. (50.) Life Time (h) for max 0.5 dpa. 1150.

Design Figures for the “Far” Tumbling Window at High Lumi Design Figures for the “Far” Tumbling Window at High Lumi. PEDD scaled down by a Factor 7.5, tbc. Window Thickness (mm) 0.1 0.2 ΔT/Pulse (K) 6.2 12.5 Thermal Stress/pulse(MPa) 9.5 19. Peak Temperature in Steady State with He-Cooling ( C). 26.2 32.5 Static Stress with He at 1 Atm (5 Atm). 20. (100.) 10. (50.) Life Time (h) for 0.5 dpa 8000.

3. The Water Curtain Dump. A Ti-window in direct contact with the water of the dump should be avoided. High pressure, corrosion, thermal stresses, radiation damage. The tumbling window solves part of this problem. The “hot” cascade in the water, where most of the energy is deposited, extends over about 1 m and a radius of 5 cm. It contains 66% of the beam power of 86 kW. Along the axis, the energy deposition is still very narrow, close to the beam size.

Energy deposition by the High Lumi beam in the water dump (A Energy deposition by the High Lumi beam in the water dump (A. Ushakov), placed at 48 m and 1 km downstream of the target. Axial Position z (cm) 0.01 4.-5. PEDD (J/g) for close ( far) dump ~ 80. (11.) 760. (101.) ΔT/pulse (K) ~ 10. (~1.-2.) 181.! (~ 24. )

To avoid pile up of the temperature in the water between pulses, a vertical flow of the water of some cm over 200 ms, 0.1 m/s is required. Whenever a EDD of about 340 J/g is reached, (see A.Ushakov), the water will start to boil. The vapor created along the axis may push aside the surrounding water. A hole may be created already DURING the beam pulse. The remaining beam pulse will continue to drill. Where does this process end?

A simple Model: Assume an EDD decreasing linearly with z from 760 J/g to zero at z=100 cm and at t= 1ms.

This should be calculated more precisely. However, one may expect that the depth of the hole due to boiling at the end of the pulse will be about 1. m. One needs an additional water length of some meters, to contain during 1 ms fully the evaporated zone and to provide downstream additional “healthy” water, to contain fully the beam energy, till a safe metallic end stop can be used.

Pressure Waves in the Water In addition to the boiling problem, the beam causes linearly rising thermal expansion of the liquid volume over 1 ms. This is partially prevented by the surrounding, cold water and by the mass inertia of the heated volume itself. This can cause pressure waves with positive and negative pressure (depletion) waves already during the pulse. At “negative” pressures, the water may “brake up”, start to boil and create a hole. Such negative pressures of -1.5 atm have been reported for the TESLA-water dump (M. Schmitz). At what time during the pulse does this occur? To be studied.

Water Curtain Photon Dump

4. Discussion and Conclusion. A tumbling window, in combination with a water curtain dump at 1 atm could be an option. By placing the tumbling window about 10 m upstream of the water dump, its replacement or preventive exchange can be envisaged. Direct contact of the window with water is avoided. It is only in contact with air (?)or He. The water and vapor is completely confined in a closed circuit.

The production of water vapor in the tank of the dump must be tolerated. The response of the water to the beam pulse must be studied in more detail, using professional FEM-codes, comprising dynamic effects, depletion waves and phase change in water. At what time during the pulse does this occur?

The water of the dump is continuously “reconditioned” in the associated water treatment plant. So, no radiation damage. The required water flow is about 10-30 kg/s. The total length of the water dump could be about 8 m (tbc) to allow for a safe end window and end stop. Space for shielding and other safety aspects, water leaks, production of Tritium, Be7,…to be studied.

The Ti-window is probably the most critical part. Tests of Ti-windows are under way at MAMI. Further expertise with Ti-windows exists with proton beams at T2K, PSI,…. With preventive maintenance of the window, its limited life time can be handled. Due to the enlarged beam size for the far dump, the window will have a much longer life time.

Also the dynamic effects in the water, if they exist, will be much smaller in the far dump. The water treatment plant for the ILC main dumps can be used in parallel for the water treatment of the photon dump. For the far dump, the pointing direction of the photon beam should be controlled within +/- 10 µ rad. Prototyping and long term tests of the entire system is virtually impossible. So, lets jump into the cold water! Thank you.