SBS Design Status Robin Wines. SBS Design Transfer in process of yoke steel from BNL, but BNL is having issues with their magnet tagging system – update.
Tagger and Vacuum Chamber Assembly Procedure. Outline. Assembly procedure for tagger and vacuum chamber. Support stands. Alignment.
Sectional Assembly and Installation
Cylinder Blocks.
Personal Mobility Lift Capstone Team Members: Jim Folgate Bill Beers Ryan Pelton David Zuercher.
NCSX Machine Platform FDR June 15, 2005 Erik D. Perry.
Magnet, Support and Infrastructure Robin Wines July 9, 2014.
Fluid Power Hydraulic Cylinders
1 UBC International Training Fund Presents. Tensioning.
Installation Instructions. Delivery Light fixtures, mounting structures and electrical components ship together Poles ship on a separate truck.
Concrete Pre Cast Panel By Peter Spence ID:
FF-650 Repair Procedure—CMP 30 Frame Reason for Repair—CMP 30 models with Serial Numbers in the range of 2453 through 3354 in Lot 9587, 0008 through 0120.
Muon g-2 Muon g-2 Experiment Quarterly Report Aria Soha All Experimenter’s Meeting March 2, 2015.
© 2012 Delmar, Cengage Learning Engine Diagnosis and Service: Piston, Piston Rings, Connecting Rod, and Engine Balancing Chapter 54.
piston/connecting rod assembly
Tagger and Vacuum Chamber Assembly Procedure. Preassembly of second bottom yokes and poleshoes. a) Install special support. b) Place the second bottom.
REASSEMBLY and INSTALLATION u Chapter 12 u Classroom Manual u Page 325 CBCAUTOMOTIVERKCBCAUTOMOTIVERK.
STATUS of 6m ANTENNA BASE Matt Fleming 8/24/04 Note 6m = BIMA.
Vbine Energy Generator Assembly Pictures and Info Slide Show.
NATEF Task Area A4 Suspension. Coil Springs and Strut Assemblies  This power point and the corresponding worksheet will help prepare you to remove and.
LCLS-II Magnetic Structure Design Review - Conceptual Mechanical Design: Module Assembly Method Alan Black Steve Marks 7/6/11 1.
© 2015 Cengage Learning. All Rights Reserved. May not be scanned, copied, duplicated, or posted to a publicly accessible website, in whole or in part.
08/24/07Shutdown’07 Week 3 F.G. Garcia1 MTA beam line installation Weekly Report August 24, 2007 Period covered: August 17 th to August 24 th (Week 3)
Submitted by Waris jamal Praveen kumar gautam Shiv pratap singh Ramashwar kumar singh Under the guidence of Prof.safiulla khan.
OUR PASSION: Earthmoving & Mining Machines Plant Maintenance Fabrication Erection.
Artificial Lift Systems
WBS1 SBS Basic: Magnet and Infrastructure Robin Wines 11/4/ SBS DOE Review.
Floor Jacks and Stands Harkness Career Center. Floor Jacks Parts Identification.
MNM Fatal Falling Material Accident Falling Material Accident April 4, 2013 (Arizona) April 4, 2013 (Arizona) Copper Operation Copper Operation.
Automotive Engines: Theory and Servicing, 6/e By James D Halderman © 2009 Pearson Education, Inc. Pearson Prentice Hall - Upper Saddle River, NJ
Barrel Calorimeter Support Mechanism Two designs are proposed for review –Design1. Individual module (Segment) of the Barrel Calorimeter is placed inside.
ZDC Remote Handling Tool Structure and Force Analysis P. Debbins University of Iowa December 10, 2009.
THS Automotive Technology Safety Lesson 3: Raising and Supporting Vehicles Safely Raising and Supporting Vehicles Safely.
NSTX NSTX Center Stack Upgrade Ensure fatigue resistant Welds: minimum # of locations shown, could be more. Various Weld Reinforcements & Hardware Replacement.
Wind Turbine Design and Implementation. Team Members Members: Luke Donney Lindsay Short Nick Ries Dario Vazquez Chris Loots Advisor: Dr. Venkataramana.
LS1 Project. Weld in dowel holes to move head over bores.
Baby MIND coil modules assembly the aluminium folded strip solution 1 Alexey, Philippe, Gabriella, Helder, Herman Baby Mind Magnet CERN June.
LAB #9 Valve Head replacement. Insert the valve. Make sure that the cap goes on the intake valve. Insert the springs. Insert the keeper.
Max-Planck- Institut für Plasmaphysik Karsten Liesenberg / AS-T Visit NCSX engineers 11/12 October 2007 Final assembly of Stellarator W7-X in the torus-assembly.
SBS Magnet and Infrastructure Status Robin Wines July 2015.
MNM Fatal Falling Material Accident Falling Material Accident April 11, 2012 (North Carolina) April 11, 2012 (North Carolina) Sand & Gravel Operation.
Automotive Engines: Theory and Servicing, 7/e By James D. Halderman Copyright © 2011, 2009, 2005, 2001, 1997 Pearson Education, Inc., Upper Saddle River,
MNM Fatal Machinery Machinery November 18, 2005 (Tennessee) November 18, 2005 (Tennessee) Crushed Stone Operation Crushed Stone Operation Plant.
LARP Collaboration Meeting Racetrack Coil Fabrication
Automotive Engines: Theory and Servicing, 6/e By James D Halderman © 2009 Pearson Education, Inc. Pearson Prentice Hall - Upper Saddle River, NJ
Update: Puck and Gun Magnet March 1, Magnetized Gun 2 K 2 CsSb Preparation Chamber HV Chamber.
AfterSalesTraining Welcome to AfterSalesTraining.
Magnetized Beam LDRD: Design Tasks February 19, 2016.
Chapter 12 Replacing Hoods, Bumpers, Fenders, Grilles, and Lids.
Work in the Tevatron A0 D0 B0 C0 E0 F0 Separators A49 Separator B48 TEL 2 installation A0 Xtal Collimator 1.5 m collimator A48 Shimming 6 magnets/day At.
Work in the Tevatron A0 D0 B0 C0 E0 F0 Separators A49 Separator B48 TEL 2 installation A0 Xtal Collimator 1.5 m collimator A48 Shimming 6 magnets/day At.
LHQ Coil Fabrication Experience and Plan Miao Yu 04/08/2013.
Page 1 TQC Mechanical Model Igor Novitski / Rodger Bossert May 24, 2006 Results of MM#4 and MM#5.
STEP 1: ASSEMBLE ANGLE PLATES
Automotive Engines Theory and Servicing
QXF Coil Fabrication & Tooling Reaction / Impregnation
ENGINE INSTALLATION AND BREAK-IN
Automotive Engines Theory and Servicing
Compressor Safety Practices
HQ Mirror Assembly R. Bossert
Step IV PRY Preparation - Contents
STEP 1: ASSEMBLE ANGLE PLATES
Compressor Safety Practices
Modern Automotive Technology PowerPoint for by Russell Krick
FIGURE 31-1 Prelubricating the engine is a very important step that should be performed before starting the engine. Notice that oil is flowing through.
Bunker Wall Design Wall ESS
One Coil Gun Magnet February 2, 2016.
Engine Sealing and Reassembly
Presentation transcript:

SBS- Counterweight Support and Magnet Assembly - Status R Wines - April 13, 2016

Prior to lifting the structure off of the wooden blocks and having it support it's own weight: 1. Finish the assembly of the counterweight. Install and torque the two 2.5" rods that hold the CW blocks together. 2. Add the 1" dowels between the CW blocks at the specified locations. 3. Bolt test to ensure the soft magnet steel can handle the torque (preload) we require. Build out the hydraulic system to run the cylinders that will lift the structure off the wooden blocks.  There is a flow control valve that must be installed as close to the cylinder as possible to prevent the jacks from slamming back down. 5. Add the spacer shims to the jacks to set the proper height of the system. Prior to building the magnet on the structure we need to design and fabricate the magnet build stand that will allow the full depth of the steel blocks to be supported during assembly.

Plan to assemble magnet on the CW including the new saddle coil. Assembly and testing is being done when technicians are not needed for priority work in the Hall. LCW and power supply are not accessible in the location of the CW assembly area. Powering of the magnet will require separate assembly on the floor, additional 4 man-weeks (2 technicians for 2 weeks). LCW upgrades in the TestLab are planned to be completed by the end of April.