Chapter 11 Standard costs for control: flexible budgets and manufacturing overhead Copyright  2009 McGraw-Hill Australia Pty Ltd PowerPoint Slides t/a.

Slides:



Advertisements
Similar presentations
A closer look at overhead costs
Advertisements

Standard costs and Variance analysis Unit 10 University of Sunderland Dr Vidya Kumar 1.
Hilton Maher Selto. 17 Flexible Budgets, Overhead Cost Management, and Activity-Based Budgeting McGraw-Hill/Irwin © 2003 The McGraw-Hill Companies, Inc.,
Overhead Budgets n Most companies use flexible budgets to control overhead costs. –A flexible budget is not based on only one level of activity but is.
The Islamic University –Gaza
Chapter 3 Cost behaviour, cost drivers and cost estimation
Copyright  2003 McGraw-Hill Australia Pty Ltd, PPTs t/a Management Accounting: An Australian Perspective 3/e by Langfield-Smith, Thorne & Hilton Slides.
Copyright  2006 McGraw-Hill Australia Pty Ltd PPTs t/a Management Accounting: Information for managing and creating value 4e Slides prepared by Kim Langfield-Smith.
FDM5 Strategic cost analysis 1 Strategic cost analysis 1.
Copyright  2003 McGraw-Hill Australia Pty Ltd, PPTs t/a Management Accounting: An Australian Perspective 3/e by Langfield-Smith, Thorne & Hilton Slides.
Chapter 11 Standard costs for control: flexible budgets and manufacturing overhead.
1 Copyright  2010 & 2007 McGraw-Hill Australia Pty Ltd PPTs t/a Accounting: What the Numbers Mean 2e (revised) by Marshall, McCartney & Van Rhyn PowerPoint.
Chapter 10 The Use of Budgets for Cost Control and Performance Evaluation.
Financial and Managerial Accounting
Copyright © 2008 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin 17 Flexible Budgets, Overhead Cost Management, and Activity-Based.
Chapter 23 Flexible Budgets and Standard Cost Systems
Variances Short summary. Static Budgets A static budget ( master budget) is prepared for only one level of a given type of activity. All actual results.
Flexible Budgets and Standard Costs Chapter 23 HORNGREN ♦ HARRISON ♦ BAMBER ♦ BEST ♦ FRASER ♦ WILLETT.
Chapter 11 Standard costs for control: flexible budgets and manufacturing overhead 11-1 Copyright  2009 McGraw-Hill Australia Pty Ltd PowerPoint Slides.
Chapter 4 Product costing systems: general principles and job costing.
Copyright © 2008, The McGraw-Hill Companies, Inc.McGraw-Hill/Irwin Chapter Three Systems Design: Job-Order Costing.
Copyright  2006 McGraw-Hill Australia Pty Ltd PPTs t/a Management Accounting: Information for managing and creating value 4e Slides prepared by Kim Langfield-Smith.
Copyright  2006 McGraw-Hill Australia Pty Ltd PPTs t/a Management Accounting: Information for managing and creating value 4e By Kim Langfield-Smith 11-1.
© 2012 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license.
Chapter 16 Fundamentals of Variance Analysis.
Chapter 5 Process costing and operation costing 5-1 Copyright  2009 McGraw-Hill Australia Pty Ltd PowerPoint Slides t/a Management Accounting 5e by Langfield-Smith.
Flexible Budgeting Chapter 07, 08
CHAPTER 13 COST ACCOUNTING AND REPORTING SYSTEMS McGraw-Hill/Irwin©The McGraw-Hill Companies, Inc., 2002.
Copyright  2006 McGraw-Hill Australia Pty Ltd PPTs t/a Management Accounting: Information for managing and creating value 4e Slides prepared by Kim Langfield-Smith.
Financial and Managerial Accounting Wild, Shaw, and Chiappetta Fourth Edition Wild, Shaw, and Chiappetta Fourth Edition McGraw-Hill/Irwin Copyright © 2011.
Chapter 4 Product costing systems 4-1 Copyright  2009 McGraw-Hill Australia Pty Ltd PowerPoint Slides t/a Management Accounting 5e by Langfield-Smith.
Chapter 23 Flexible Budgets and Standard Cost Systems.
Activity Based Costing (ABC). Activity based costing An alternative method to absorption costing, called Activity Based Costing (ABC) has emerged. It.
Cornerstones of Managerial Accounting, 5e.
Chapter 8 Activity-based costing
19 Standard Costs, Variable Costing Systems, Quality Costs, and Joint Costs.
Pricing and product mix decisions
Chapter 11 Standard costs for control: flexible budgets and manufacturing overhead.
A closer look at overhead costs
Chapter 21 Information for capital expenditure decisions
Flexible Budgets, Overhead Cost Variances, and Management Control
Chapter 19 Manufacturing Overhead Standard Costs: Completing the Accounting Cycle for Standards costs.
ACC602: Strategic Management Accounting Topic 3: Standard costs for control measures: flexible budgets and manufacturing overhead analysis Slides adapted.
Flexible Budgets & Performance Reports
Activity-based costing
COST ANALYSIS FOR CONTROL
Further aspects of capital expenditure decisions
17 Flexible Budgets, Overhead Cost Management, and Activity-Based Budgeting.
Process costing and operation costing
Chapter 6 Master budget for manufacturing organisations
Chapter 22 Further aspects of capital expenditure decisions
Management accounting: basic terms and concepts
Managerial Accounting
Information for tactical decisions
Chapter 9 Budgeting systems
Chapter 7 Flexible budgets
Flexible Budgets and Overhead Analysis
Activity-based costing
Further aspects of capital expenditure decisions
Principles of Accounting 2002e
Standard Costing and Variance Analysis
Flexible Budgets and Overhead Analysis
Flexible Budgets, Overhead Cost Variances, and Management Control
Chapter 11 Flexible Budgeting and the Management of Overhead and Support Activity Costs.
Flexible Budgets, Standard Costs, and Variances Analysis Chapter 8
Available NOW at your campus bookstore!
Flexible Budgets, Standard Costs, and Variances Analysis Chapter 8
Cost volume profit analysis
Cost behaviour, cost drivers and cost estimation
Flexible Budgets, Overhead Cost Variances, and Management Control
Presentation transcript:

Chapter 11 Standard costs for control: flexible budgets and manufacturing overhead Copyright  2009 McGraw-Hill Australia Pty Ltd PowerPoint Slides t/a Management Accounting 5e by Langfield-Smith Prepared by Kim Langfield-Smith

Outline Flexible budgets Input measures and output measures Overhead application in a standard costing system Calculating and interpreting overhead cost variances Standard costs for product costing An appraisal of standard costing systems Criticisms and advantages Activity-based budgeting Copyright  2009 McGraw-Hill Australia Pty Ltd PowerPoint Slides t/a Management Accounting 5e by Langfield-Smith Prepared by Kim Langfield-Smith

Flexible budgets A detailed budget prepared for a range of levels of activities Compared to a static budget which relates to one specific planned level of activity Often restricted to flexing overhead costs to various levels of activity Allow us to select the most appropriate benchmark for cost control Provide a valid basis for comparing actual and expected costs, for the actual level of activity Copyright  2009 McGraw-Hill Australia Pty Ltd PowerPoint Slides t/a Management Accounting 5e by Langfield-Smith Prepared by Kim Langfield-Smith

Copyright  2009 McGraw-Hill Australia Pty Ltd PowerPoint Slides t/a Management Accounting 5e by Langfield-Smith Prepared by Kim Langfield-Smith

Input measures and output measures Units of output are not usually a meaningful measure of the level of activity in a multi-product firm Output can be measured as the standard quantity of input allowed, given actual output Machine hours Direct labour hours The choice between input or output measures becomes important when multiple products are being manufactured Copyright  2009 McGraw-Hill Australia Pty Ltd PowerPoint Slides t/a Management Accounting 5e by Langfield-Smith Prepared by Kim Langfield-Smith

Flexible overhead budget Flexible budget report: shows flexible overhead budgets at various levels of activity Formula flexible budget: allows us to calculate total overhead at various levels of activity using a formula Copyright  2009 McGraw-Hill Australia Pty Ltd PowerPoint Slides t/a Management Accounting 5e by Langfield-Smith Prepared by Kim Langfield-Smith

Copyright  2009 McGraw-Hill Australia Pty Ltd PowerPoint Slides t/a Management Accounting 5e by Langfield-Smith Prepared by Kim Langfield-Smith

Overhead application in a standard costing system Overhead application is the method of allocating overhead cost to products Recorded in the WIP inventory account Overhead is applied to inventory using the standard overhead rate Based on the standard quantity of input allowed, given actual output The activity chosen for the standard overhead rate should be a cost driver Any activity or factor that causes costs to be incurred Copyright  2009 McGraw-Hill Australia Pty Ltd PowerPoint Slides t/a Management Accounting 5e by Langfield-Smith Prepared by Kim Langfield-Smith

Calculating overhead cost variances The flexible budget provides a tool for controlling manufacturing overhead costs At the end of an accounting period, the flexible budget can be used to calculate the amount of overhead cost that should have been incurred, given the actual level of activity Four different overhead variances can be calculated to compare the actual overhead cost incurred with the flexible budget Copyright  2009 McGraw-Hill Australia Pty Ltd PowerPoint Slides t/a Management Accounting 5e by Langfield-Smith Prepared by Kim Langfield-Smith

Calculating variable overhead cost variances Variable overhead spending variance A measure of the difference between the actual variable overhead and the standard variable overhead rate multiplied by actual activity = Actual variable overhead – (AH × SVR) Where AH = actual direct labour hours SVR = standard variable overhead rate (cont.) Copyright  2009 McGraw-Hill Australia Pty Ltd PowerPoint Slides t/a Management Accounting 5e by Langfield-Smith Prepared by Kim Langfield-Smith

Calculating variable overhead cost variances (cont.) Variable overhead efficiency variance A measure of the difference between the actual activity and the standard activity allowed, given the actual output multiplied by the standard variable overhead rate = SVR(AH – SH) Where SH = standard direct labour hours allowed for actual output AH = actual direct labour hours SVR = standard variable overhead rate Copyright  2009 McGraw-Hill Australia Pty Ltd PowerPoint Slides t/a Management Accounting 5e by Langfield-Smith Prepared by Kim Langfield-Smith

Copyright  2009 McGraw-Hill Australia Pty Ltd PowerPoint Slides t/a Management Accounting 5e by Langfield-Smith Prepared by Kim Langfield-Smith

Interpreting variable overhead variances Spending variance Actual cost of variable overhead is greater/less than expected, after adjusting for the actual quantity of cost driver that is used Used to control variable overhead cost Efficiency variance The cost effects of excessive or minimal use of the particular activity (cost driver) The spending variance is the real control variance for variable overhead Copyright  2009 McGraw-Hill Australia Pty Ltd PowerPoint Slides t/a Management Accounting 5e by Langfield-Smith Prepared by Kim Langfield-Smith

Calculating fixed overhead variances Fixed overhead budget variance The difference between actual fixed overhead and budgeted fixed overhead = actual fixed overhead – budgeted fixed overhead Fixed overhead volume variance The difference between budgeted fixed overhead and fixed overhead applied to production = budgeted fixed overhead – applied fixed overhead Copyright  2009 McGraw-Hill Australia Pty Ltd PowerPoint Slides t/a Management Accounting 5e by Langfield-Smith Prepared by Kim Langfield-Smith

Copyright  2009 McGraw-Hill Australia Pty Ltd PowerPoint Slides t/a Management Accounting 5e by Langfield-Smith Prepared by Kim Langfield-Smith

Interpreting fixed overhead variances Fixed overhead budget variance Used for control Assumes fixed overhead will not change as activity varies Fixed overhead volume variance Standard cost driver allowed for actual output is more/less than the planned level of production Reconciles the two purposes of costing systems: product costing and cost control Copyright  2009 McGraw-Hill Australia Pty Ltd PowerPoint Slides t/a Management Accounting 5e by Langfield-Smith Prepared by Kim Langfield-Smith

Copyright  2009 McGraw-Hill Australia Pty Ltd PowerPoint Slides t/a Management Accounting 5e by Langfield-Smith Prepared by Kim Langfield-Smith

Standard costs for product costing Costs of direct material, direct labour and manufacturing overhead are all charged to inventory at standard costs, not actual costs Variances are closed off at end of the accounting period To cost of goods sold expense Prorate between WIP, FG and COGS inventory if the amount is large Copyright  2009 McGraw-Hill Australia Pty Ltd PowerPoint Slides t/a Management Accounting 5e by Langfield-Smith Prepared by Kim Langfield-Smith

Criticisms of standard costing systems Variances are too aggregated and concentrate on consequences rather than the causes of problems Variance reports are too late to be useful Monthly reporting may be too late to correct problems Standard costing systems tend to focus too heavily on cost minimisation May encourage cost reduction which can adversely affect other areas of strategic importance (cont.) Copyright  2009 McGraw-Hill Australia Pty Ltd PowerPoint Slides t/a Management Accounting 5e by Langfield-Smith Prepared by Kim Langfield-Smith

Criticisms of standard costing systems (cont.) Standard costing systems take a departmental perspective rather than a process perspective Miss opportunities for cost control Controlling one department’s costs may increase costs in other departments Too much emphasis is placed on the cost and efficiency of direct labour This is of decreasing importance in the face of increasing automation Overhead variances give limited cost control information (cont.) Copyright  2009 McGraw-Hill Australia Pty Ltd PowerPoint Slides t/a Management Accounting 5e by Langfield-Smith Prepared by Kim Langfield-Smith

Criticisms of standard costing systems (cont.) Variance analysis does not explicitly encourage continuous improvement Due to 12-month standards Standard costs become outdated quickly due to shorter product life cycles Standard costing systems do not capture the full costs of materials The full cost of ownership includes cost of ordering and paying for materials, storage, handling, rework Copyright  2009 McGraw-Hill Australia Pty Ltd PowerPoint Slides t/a Management Accounting 5e by Langfield-Smith Prepared by Kim Langfield-Smith

Advantages of standard costing Provides a good basis for cost comparisons Particularly with the use of flexible budgets Enables managers to use management by exception Focus only on those variances that are significant and save management time Provides a basis for managerial performance evaluation and determining bonuses (cont.) Copyright  2009 McGraw-Hill Australia Pty Ltd PowerPoint Slides t/a Management Accounting 5e by Langfield-Smith Prepared by Kim Langfield-Smith

Advantages of standard costing (cont.) Participation in setting standards and assigning responsibility can have motivational effects on employees May lead to more stable product costs compared to using actual costs Useful for pricing and setting product mix Can be used for external financial reporting Copyright  2009 McGraw-Hill Australia Pty Ltd PowerPoint Slides t/a Management Accounting 5e by Langfield-Smith Prepared by Kim Langfield-Smith

Activity-based budgeting A process of building up budgets from the major activities of the business Uses principles of ABC to estimate a firm’s future demand for resources ABB works in reverse to ABC Start with analysis of the market, estimate sales demand, estimate production activities, required level of production and resources (cont.) Copyright  2009 McGraw-Hill Australia Pty Ltd PowerPoint Slides t/a Management Accounting 5e by Langfield-Smith Prepared by Kim Langfield-Smith

Copyright  2009 McGraw-Hill Australia Pty Ltd PowerPoint Slides t/a Management Accounting 5e by Langfield-Smith Prepared by Kim Langfield-Smith

Copyright  2009 McGraw-Hill Australia Pty Ltd PowerPoint Slides t/a Management Accounting 5e by Langfield-Smith Prepared by Kim Langfield-Smith

Activity-based budgeting (cont.) Inaccuracies in ABB may include the following: Spending versus consumption of resources The cost of unused resources are not included in ABC product costs Estimates of non-manufacturing activities may be distorted Shared resources may not be accounted for accurately Information requirements for ABB are high compared to traditional budgeting systems (cont.) Copyright  2009 McGraw-Hill Australia Pty Ltd PowerPoint Slides t/a Management Accounting 5e by Langfield-Smith Prepared by Kim Langfield-Smith

Activity-based budgeting (cont.) Performance evaluation under ABB Need to compare actual activity costs to budgeted costs Budgeted costs should be based on flexible budgets which show the budgeted cost of activities as various cost drivers change Complexity would make it difficult to prepare an information report Such flexible budgets have the potential to be very complex and costly to design and maintain, with difficulties relating to data collection Copyright  2009 McGraw-Hill Australia Pty Ltd PowerPoint Slides t/a Management Accounting 5e by Langfield-Smith Prepared by Kim Langfield-Smith

Summary A flexible budget can be used to control manufacturing costs, based on a range of different levels of activity Cost variances can be calculated for variable and fixed overheads, but their usefulness for controlling overhead costs can be questioned Standard costing systems have been criticised in the light of more modern methods for controlling costs and evaluating performance Activity-based budgeting may provide more accurate benchmarks than a flexible budget, but may be complex and costly to implement Copyright  2009 McGraw-Hill Australia Pty Ltd PowerPoint Slides t/a Management Accounting 5e by Langfield-Smith Prepared by Kim Langfield-Smith