繪製現狀圖.

Slides:



Advertisements
Similar presentations
Standard Business Roadmap
Advertisements

Value Stream Mapping AGENDA Introduction to mapping
Pull System Workshop THE GOAL: Directly link all processes - from the customer back to raw material suppliers - to improve responsiveness, shorten lead.
The Principles Of Lean Repair Dr David J Horton Copyright© 2011 Beta Management Systems - All Rights Reserved.
© Improvement Initiatives (used with permission of author) freeleansite.com The Lean Enterprise Lean Foundations Continuous Improvement Training Lean Foundations.
MSE507 Lean Manufacturing
Lean and Agile supply 1 © The Delos Partnership 2004 Lean and Agile Applying the ideas to the Supply side.
Starting the Journey. Lean Means Eliminating WasteLean Means Eliminating Waste  Ohno – Reduce customer order to cash collection by removing non-value.
VALUE STREAM MAPPING Analysis of Material Transport.
MSE507 Lean Manufacturing
1 Session 22 Planning and Scheduling JIT Operations Session 22 Planning and Scheduling JIT Operations John Striebich Copeland Corporation.
Chapter 2 - The Value Stream
MSE507 Lean Manufacturing
Value Stream Analysis Kaizen Training
Summary: Review of Lean Principles
The Lean Enterprise Lean Foundations Continuous Improvement Training
CONTINUOUS IMPROVEMENT PROGRAM
Value Stream Mapping.
Value Stream Mapping Day 1
The Lean Enterprise VSM Symbols VSM Symbols Lean Foundations Continuous Improvement Training Lean Foundations Continuous Improvement Training.
Organize your Industry Prof. Dr. Christoph Roser Organize your Industry Value Stream Mapping Overview of Symbols.
Process Improvement Strategies Takt Time Future State Value Stream Map
Chapter 5 Value Stream Mapping
© Improvement Initiatives (used with permission of author) freeleansite.com The Lean Enterprise Lean Foundations Continuous Improvement Training Lean Foundations.
Kanban A New Approach (Tool for Information Flow)
The Basics of Lean and Clean Laura Pyzik 2007 Great Lakes/Great Plains P2 Conference March 13, 2007.
Value Stream Mapping How to Create the Future State Issue: You have mapped a current state, so what should your ideal or future state map look like? Overproduction.
Perencanaan Produksi Harian Case #2 One Piece Flow Kuliah 4 LSiPro – FT Untirta Muhammad Adha Ilhami.
Ch-6 Value Stream Mapping1 Value Stream Mapping An effective way of capturing the current situation, identifying the long-term lean vision, and developing.
JIT – Just-In-Time Production
Kenneth J. Andrews EMP Manufacturing Systems: EMP-5179 Module #5: Value-Stream Mapping & Quick Set-Up Dr. Ken Andrews High Impact Facilitation.
Production Components Materials Inventory Time & Costs Production Systems.
Lean Production and the Just-in-Time Philosophy. Lean Production Elimination of All Waste – Waste is Anything that Does Not Add Value to Product. Continuous.
APICS is not responsible for statements or opinions expressed by individuals in its publications or at its meetings. The views expressed are solely those.
MAPPING YOUR VALUE STREAM
Chapter 9 Inventory Kanbans Automating the Replenishment Cycle.
1 Lean Office - Pull Kanban, Just in Time, Standardized Work
© BMA Inc All rights reserved. Decision Making.
Supplier Development project Tools for supplier development Inspiration for tools to be used in workshops.
Syn Lean and Agile supply 1 © The Delos Partnership 2005 Lean and Agile Applying the ideas to the Supply side.
BAE Lean 1 © The Delos Partnership 2004 Lean and Agile Applying the ideas to the Supply side.
1 Lean Manufacturing Overview Lean Manufacturing Overview
FMS 300 Series FBP-FMS320A Introduction to Flow Series: FMS320 to FMS325.
Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall
Kaizen Workshop Report (Operations) DRAFT October 5, 2007 Site: Line/Area: Team Number: Date: Category: : Xxxxx Project Title : Xxxxx BE-P-001-DRAFT-Kaizen.
Value Stream Mapping. Tips Keep it high level Remember this is a value stream map NOT a process map Use approximately 8 process steps Focus on the high.
Open minds. Open doors. TM School of Mechanical, Industrial, & Manufacturing Engineering Engineering Methods Process Analysis and Improvement.
CHAPTER 9 Lean Manufacturing.
5 Day Forecast Mon Tues Wed Thu Fri.
Six Sigma: DMAIC; Y=f(x)
IENG 451 / 452 Just In Time Processes: Cells, Stores, Kanban, Demand
Chapter 27 Cost Management for Just-in-Time Environments
McGraw-Hill/Irwin ©2009 The McGraw-Hill Companies, All Rights Reserved
Lean Manufacturing Basic Overview XYZ Company.
Pull Manufacturing and Just In Time
MSE407 Manufacturing Systems
Value Stream Mapping GEOP 4316.
Kanban Production Just in time Systems
Introduction to Materials Management
A Tool to Move Forward With
Lean / Value Stream Mapping Overview
Value Stream Mapping ASQ March 2018.
Process Improvement Strategies Takt Time Future State Value Stream Map
Lean Methodology and Building Blocks Kaizen Methodology The 5 Whys
Level Scheduling “Ship to Schedule / Build to Plan”
Value Stream Map : Supplier : Picking cart : Fork lift : Material
讓價值流『精實』 消除浪費.
Chapter 5 Value Stream Mapping
Chapter 5 Value Stream Mapping
By Ethan bolander, peter Schulte, and Dominique western
Presentation transcript:

繪製現狀圖

CSUN - Prof. David Shternberg MSE595LM - Lean Manufacturing Example PROCESS BOX ICONS DATA BOX ICONS - C/T time - C/O time - Up time - Scrap

CSUN - Prof. David Shternberg MSE595LM - Lean Manufacturing Example Information Flow INVENTORY ICONS WITH PUSH ARROWS Material Flow

Value Stream Step 4 Current State Map - 1st View First - Show the Customer Value Stream Step 4 Current State Map - 1st View State St. Assembly 18,400 pcs/mo -12,000 “L” -6,400 “R” Tray=20 pcs. 2 Shifts

Value Stream Step 4 Current State Map - 2nd View Second - add the major Processes, Data Boxes, and Inventory Triangles Value Stream Step 4 Current State Map - 2nd View State St. Assembly 18,400 pcs/mo -12,000 “L” -6,400 “R” Tray=20 pcs. 2 Shifts I I Stamping I S. Weld # 1 I S. Weld # 2 I Assy # 1 Assy # 2 I Shipping Coils 4600 L 1100L 1600 L 1200 L 2700 L 2400 R 600 R 850 R 640R 1440 R 5 days CT=1sec. CT=39sec. CT=46sec. CT=62sec. CT=40sec. Co=0 Co=1 hr. Co=10 min. Co=10 min. Co=0 Uptime=85% Uptime=100% Uptime=80% Uptime=100% Uptime=100% 27,600 sec. avail 2 shifts 2 shifts 2 shifts 2 shifts 27,600 sec.avail EPE=2 weeks 27,600 sec.avail 27,600 sec.avail 27,600 sec.avail The data obtained is put in the data box directly beneath the process box.

Value Stream Step 4 Current State Map - 3rd View Third - Show the Material Flow Value Stream Step 4 Current State Map - 3rd View The supplier of raw material is identified with a factory icon. In this case they deliver 500 ft coils State St. Assembly Michigan Steel Co. 18,400 pcs/mo -12,000 “L” -6,400 “R” 500 Ft. Coils Tray=20 pcs. Tues & Thurs. 2 Shifts A truck icon and broad arrow indicate movement of finished goods to the customer and raw material to the site. 1X Daily I Stamping I S. Weld # 1 I S. Weld # 2 I Assy # 1 I Assy # 2 I Shipping 4600 L 1100L 1600 L Coils 1200 L 2700 L 2400 R 600 R 850 R 640R 1440 R 5 days CT=1sec. CT=39sec. CT=46sec. CT=62sec. CT=40sec. Co=0 Co=1 hr. Co=10 min. Co=10 min. Co=0 Uptime=85% Uptime=100% Uptime=80% Uptime=100% Uptime=100% 27,600 sec. avail 2 shifts 2 shifts 2 shifts 2 shifts 27,600 sec.avail EPE=2 weeks 27,600 sec.avail 27,600 sec.avail 27,600 sec.avail

Value Stream Step 4 Current State Map – 4th View Fourth - show Information Flows & Push Arrows Value Stream Step 4 Current State Map – 4th View 90/60/30 day Forecasts 6 WEEK Forecast Production Control State St. Assembly MRP Weekly Fax Daily Order Michigan Steel Co. 18,400 pcs/mo -12,000 “L” -6,400 “R” 500 ft. Coils WEEKLY SCHEDULE Tray=20 pcs. 2 Shifts Tues & Thurs. 1X Daily I Coils Stamping S. Weld # 1 S. Weld # 2 Assy # 1 Assy # 2 Shipping 5 days I I 4600 L I I I 1100R 2400 R 1600 L 2700 L 600 R 1200 L 850 R 1440 R CT=1sec. CT=39sec. CT=46sec. CT=62sec. 640R CT=40sec. Co=0 Co=1 hr. Co=10 min. Co=10 min. Co=0 Uptime=85% Uptime=100% Uptime=80% Uptime=100% Uptime=100% 27,600 sec. avail 2 shifts 2 shifts 2 shifts 2 shifts 27,600 sec.avail EPE=2 weeks 27,600 sec.avail 27,600 sec.avail 27,600 sec.avail

EPE Every part every (2 weeks)

Material Flow Icons I FIFO Assembly C/T=45 sec. XYZ Corporation C/O=30 min. 300 pieces 3 Shifts. 1 day 2% Scrap Process Box Supplier/ Customer Data Box Inventory Supermarket Mon + Wed FIFO Shipment Push Physical Finished Goods First-In-First-Out Pull to Customer

Information Flow Icons Weekly Schedule Sequenced-Pull Ball Electronic Information Flow OXOX Load Leveling Box Manual Information Flow Kanban Post Withdrawal Kanban Production Kanban Signal Kanban

General Icons Kaizen Lightning Burst Operator Buffer or Safety Stock Uptime Changeover Kaizen Lightning Burst Buffer or Safety Stock Operator “Go See” Production Schedule