Vito Palladino Straw Working Group 23/3/2015

Slides:



Advertisements
Similar presentations
Octal ASD Certification Tests at Michigan J. Chapman, Tiesheng Dai, & Tuan Bui August 30, CERN.
Advertisements

Jianchun Wang Syracuse University 10/16/99 CLEO Meeting Outline DAQ problems solved Recent results Status of DAQ Work to be done.
LKr readout: present and future R. Fantechi 30/8/2012.
The TIMING System … …as used in the PS accelerators.
MICE CM26 March '10Jean-Sebastien GraulichSlide 1 Detector DAQ Issues o Achievements Since CM25 o DAQ System Upgrade o Luminosity Monitors o Sequels of.
Straw electronics Straw Readout Board (SRB). Full SRB - IO Handling 16 covers – Input 16*2 links 400(320eff) Mbits/s Control – TTC – LEMO – VME Output.
Prototype Test of SPring-8 FADC Module Da-Shung Su Wen-Chen Chang 02/07/2002.
Status of NA62 straw electronics and services Peter LICHARD, Johan Morant, Vito PALLADINO.
Plans for the 2015 Run Vito Palladino Straw Working Group 2/2/2015.
Straw Electronics status and preparation for the technical run NA62 workshop Siena.
7 Nov 2007Paul Dauncey1 Test results from Imperial Basic tests Source tests Firmware status Jamie Ballin, Paul Dauncey, Anne-Marie Magnan, Matt Noy Imperial.
DC12 Commissioning Status GOALS: establish operating conditions, determine initial calibration parameters and measure operating characteristics for the.
Status of Global Trigger Global Muon Trigger Sept 2001 Vienna CMS-group presented by A.Taurok.
FADC progress in Vienna Reported by H.Ishino for Vienna FADC group M.Pernicka and H.Steininger.
11th March 2008AIDA FEE Report1 AIDA Front end electronics Report February 2008.
1 VeLo L1 Read Out Guido Haefeli VeLo Comprehensive Review 27/28 January 2003.
Straw Working Group Status assembly at CERN Plans 10/2/14Straw WG.
MuTr Shutdown Work Rusty Towell for And JUNE 22, 2004 at the Muon Physics and Forward Upgrades Workshop.
TELL-1 and TDC board: present status and future plans B. Angelucci, A. Burato, S. Venditti.
Status of NA62 straw electronics Webs Covers Services Readout.
FPGA firmware of DC5 FEE. Outline List of issue Data loss issue Command error issue (DCM to FEM) Command lost issue (PC with USB connection to GANDALF)
Update on final LAV front-end M. Raggi, T. Spadaro, P. Valente & G. Corradi, C. Paglia, D. Tagnani.
NA62 straw tracker readout status Georgios Konstantinou
CERN, 18 december 2003Coincidence Matrix ASIC PRR Coincidence ASIC modifications E.Petrolo, R.Vari, S.Veneziano INFN-Rome.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
Integration and commissioning of the Pile-Up VETO.
October Test Beam DAQ. Framework sketch Only DAQs subprograms works during spills Each subprogram produces an output each spill Each dependant subprogram.
Straw electronics status  Signal generation and formation in straw  Webs + Cover  Backend  TTC  Services + DCS  New engineer on VIA program Georgios.
Preparation for production phase Web – New web with HV pigtail qualified (?) – Installed on 2 views in Technical run Very little effect on noise; detector.
SRB data transmission Vito Palladino CERN 2 June 2014.
FW and HW Status TDAQ WG 10/6/2015. Hardware MPOD: ◦ HV was NOT floating   Sensibility of current limit to external devices  Particularly for chamber.
Straw VME Data Monitoring M. Koval Straw WG meeting
The NA62 Spectrometer Acquisition System TWEPP 2015, Lisbon Peter Lichard and Vito Palladino - CERN On Behalf of NA62 Straw Working Group.
Straw readout status Status and plans in Prague compared with situation now Choke and error Conclusions and plans.
Evelyn Thomson Ohio State University Page 1 XFT Status CDF Trigger Workshop, 17 August 2000 l XFT Hardware status l XFT Integration tests at B0, including:
Plans for the 2015 Run Michal Koval, Peter Lichard and Vito Palladino TDAQ Working Group 25/3/2015.
Software and TDAQ Peter Lichard, Vito Palladino NA62 Collaboration Meeting, Sept Ferrara.
Sumary of the LKr WG R. Fantechi 31/8/2012. SLM readout restart First goal – Test the same configuration as in 2010 (rack TS) – All old power supplies.
Report from the straw working group H. Danielsson 8/29/13Plenary Liverpool, H. Danielsson.
Straw (T)DAQ Peter Lichard, Vito Palladino NA62 Collaboration Meeting, Sept Ferrara.
Straw Working group Ferrara 4/9/2014. Outline Status and Plans Installation of Chambers 1-3 Chamber 4 Vacuum test SRB Readout, monitoring and software.
DAQ and Trigger for HPS run Sergey Boyarinov JLAB July 11, Requirements and available test results 2. DAQ status 3. Trigger system status and upgrades.
Electronics and DAQ status Frontend - covers – Preparation of the final cover version and production Design finished Mounting of RJ45 verified using selective.
Straw readout status Run 2016 Cover FW SRB FW.
DAQ ACQUISITION FOR THE dE/dX DETECTOR
Status of NA62 straw electronics and services
Status of NA62 straw readout
LKr status R. Fantechi.
PID meeting SNATS to SCATS New front end design
Michal Koval (CERN) Straw WG Meeting
Enrico Gamberini for the GTK WG TDAQ WG Meeting June 01, 2016
* Initialization (power-up, run)
Iwaki System Readout Board User’s Guide
Injectors BLM system: PS Ring installation at EYETS
DCH FEE 28 chs DCH prototype FEE &
EMU Slice Test Run Plan a working document.
COVER Full production should arrive today
WP02 PRR: Master Oscillator and RF Reference Distribution
M. Alexeev on behalf of Torino TIGER Test Group
Run experience Cover FW SRB FW DAQ and monitoring
EMC Electronics and Trigger Review and Trigger Plan
Front-end electronic system for large area photomultipliers readout
Status of n-XYTER read-out chain at GSI
Level-1 Calo Monitoring
CPM plans: the short, the medium and the long
Trigger system Marián Krivda (University of Birmingham)
BESIII EMC electronics
Optical links in the 25ns test beam
Trigger issues for the CALICE beam test
Beam instrumentation and background monitoring
Presentation transcript:

Vito Palladino Straw Working Group 23/3/2015 Plans for the 2015 Run Vito Palladino Straw Working Group 23/3/2015

Hardware Gas leak to repair in Station 4 HV discharge in Station 4 to be understood SBC Move to local accounts (AFS is not stable enough) COVER Make safer the masking of the channels Check the multi-hit and FIFO full flags SRB Fix the NIM outputs (patch to be applied on all boards) Heat sinks installation Trigger matching

Hardware Gas leak to repair in Station 4 HV discharge in Station 4 to be understood SBC Move to local accounts (AFS is not stable enough) COVER Make safer the masking of the channels Check the multi-hit and FIFO full flags SRB Fix the NIM outputs (patch to be applied on all boards) Heat sinks installation Trigger matching (Boards dismounted, patching will start the 8th of April)

Hardware II One DATA cable to be changed in Station 1 Installation of the shielding for the cable trays (Reminder: the data cables are RJ45 but the signals are LVDS) Gain monitor module Full development setup in 154 (16 covers,1 or 2 SRB(s) and a complete MPOD system) 16ch ISEG HV module repairing Temperature sensors to be installed on the manifolds

Hardware II One DATA cable to be changed in Station 1 Installation of the shielding for the cable trays (Reminder: the data cables are RJ45 but the signals are LVDS) Gain monitor module Full development setup in 154 (16 covers,1 or 2 SRB(s) and a complete MPOD system) 16ch ISEG HV module repairing Temperature sensors to be installed on the manifolds

Run Control Init procedure: Recognize PLLs problems + automatic actions ( => restart ALL the PLLs ) Recognize links problems + automatic actions Add masking of not connected straws Add reset of internal links SOB/EOB Automatic checks + actions: Masks Connection to COVERs Thresholds PLLs Noise spikes (induced) Automatic reload of COVER parameters in case of reset Readout of the HW configuration

Run Control Init procedure: Recognize PLLs problems + automatic actions ( => restart ALL the PLLs ) Recognize links problems + automatic actions Add masking of not connected straws Add reset of internal links SOB/EOB Automatic checks + actions: Masks Connection to COVERs Thresholds PLLs Noise spikes (induced) Automatic reload of COVER parameters in case of reset Readout of the HW configuration

VME Monitoring Produce the FW to access the data via VME Generate histograms and optimization of the histograms update Add the 25ns structure of the time distribution

VME Monitoring Produce the FW to access the data via VME Generate histograms and optimization of the histograms update Add the 25ns structure of the time distribution Details in Michal presentation

Raw Data Analysis Toy Montecarlo to estimate the data throughput in case of trigger matching, with various trigger rates. Exercise the trigger algorithm(s) Generate a root tree from the raw data (Straw only) Data merging Searching for problems in COVERs connectivity Multi-hit and FULL full flags Noise spikes

Raw Data Analysis Toy Montecarlo to estimate the data throughput in case of trigger matching, with various trigger rates. Exercise the trigger algorithm(s) Generate a root tree from the raw data (Straw only) Data merging Searching for problems in COVERs connectivity Multi-hit and FULL full flags Noise spikes

DCS Definition of the alarms ranges channel by channel Trip: Adjust the limits Investigate the “rump down problem” Investigate possible MPOD problems Move form local to general DCS

DCS Definition of the alarms ranges channel by channel Trip: Adjust the limits Investigate the “rump down problem” Investigate possible MPOD problems Move form local to general DCS

(# of hits per time slice) OUTPUT FIFO ETHERNET TO FRONTEND FROM INPUT FIFO TIME REORDER 10us 25ns SLICE DEPTH MEMORY (# of hits per time slice) CIRCULAR BUFFER ~ 1 ms TTC L0 TRIGGER QUEUE TTC SOB COARSE TIME COUNTER CLEARING 8bit straw addr 5b fine time 1b edge 2b monitoring 1-2b coarse time 8,16 or 32 hits

25ns Structure

25ns Structure

25ns Structure

Conclusions and Plans A lot of work has been done since the end of the run Trigger matching is now the priority Diagnostic tools have been improved Hardware will be ready and tested before the end of April

First Look at the Raw Data T (25ns)

First Look at the Raw Data T (25ns)

First Look at the Raw Data T (25ns)

First Look at the Raw Data T (25ns)

First Look at the Raw Data T (25ns)

First Look at the Raw Data T (25ns)

First Look at the Raw Data T (25ns)