Hardware Gas leak to repair in Station 4 HV discharge in Station 4 to be understood SBC Move to local accounts (AFS is not stable enough) COVER Make safer the masking of the channels Check the multi-hit and FIFO full flags SRB Fix the NIM outputs (patch to be applied on all boards) Heat sinks installation Trigger matching
Hardware Gas leak to repair in Station 4 HV discharge in Station 4 to be understood SBC Move to local accounts (AFS is not stable enough) COVER Make safer the masking of the channels Check the multi-hit and FIFO full flags SRB Fix the NIM outputs (patch to be applied on all boards) Heat sinks installation Trigger matching (Boards dismounted, patching will start the 8th of April)
Hardware II One DATA cable to be changed in Station 1 Installation of the shielding for the cable trays (Reminder: the data cables are RJ45 but the signals are LVDS) Gain monitor module Full development setup in 154 (16 covers,1 or 2 SRB(s) and a complete MPOD system) 16ch ISEG HV module repairing Temperature sensors to be installed on the manifolds
Hardware II One DATA cable to be changed in Station 1 Installation of the shielding for the cable trays (Reminder: the data cables are RJ45 but the signals are LVDS) Gain monitor module Full development setup in 154 (16 covers,1 or 2 SRB(s) and a complete MPOD system) 16ch ISEG HV module repairing Temperature sensors to be installed on the manifolds
Run Control Init procedure: Recognize PLLs problems + automatic actions ( => restart ALL the PLLs ) Recognize links problems + automatic actions Add masking of not connected straws Add reset of internal links SOB/EOB Automatic checks + actions: Masks Connection to COVERs Thresholds PLLs Noise spikes (induced) Automatic reload of COVER parameters in case of reset Readout of the HW configuration
Run Control Init procedure: Recognize PLLs problems + automatic actions ( => restart ALL the PLLs ) Recognize links problems + automatic actions Add masking of not connected straws Add reset of internal links SOB/EOB Automatic checks + actions: Masks Connection to COVERs Thresholds PLLs Noise spikes (induced) Automatic reload of COVER parameters in case of reset Readout of the HW configuration
VME Monitoring Produce the FW to access the data via VME Generate histograms and optimization of the histograms update Add the 25ns structure of the time distribution
VME Monitoring Produce the FW to access the data via VME Generate histograms and optimization of the histograms update Add the 25ns structure of the time distribution Details in Michal presentation
Raw Data Analysis Toy Montecarlo to estimate the data throughput in case of trigger matching, with various trigger rates. Exercise the trigger algorithm(s) Generate a root tree from the raw data (Straw only) Data merging Searching for problems in COVERs connectivity Multi-hit and FULL full flags Noise spikes
Raw Data Analysis Toy Montecarlo to estimate the data throughput in case of trigger matching, with various trigger rates. Exercise the trigger algorithm(s) Generate a root tree from the raw data (Straw only) Data merging Searching for problems in COVERs connectivity Multi-hit and FULL full flags Noise spikes
DCS Definition of the alarms ranges channel by channel Trip: Adjust the limits Investigate the “rump down problem” Investigate possible MPOD problems Move form local to general DCS
DCS Definition of the alarms ranges channel by channel Trip: Adjust the limits Investigate the “rump down problem” Investigate possible MPOD problems Move form local to general DCS
(# of hits per time slice) OUTPUT FIFO ETHERNET TO FRONTEND FROM INPUT FIFO TIME REORDER 10us 25ns SLICE DEPTH MEMORY (# of hits per time slice) CIRCULAR BUFFER ~ 1 ms TTC L0 TRIGGER QUEUE TTC SOB COARSE TIME COUNTER CLEARING 8bit straw addr 5b fine time 1b edge 2b monitoring 1-2b coarse time 8,16 or 32 hits
25ns Structure
25ns Structure
25ns Structure
Conclusions and Plans A lot of work has been done since the end of the run Trigger matching is now the priority Diagnostic tools have been improved Hardware will be ready and tested before the end of April
First Look at the Raw Data T (25ns)
First Look at the Raw Data T (25ns)
First Look at the Raw Data T (25ns)
First Look at the Raw Data T (25ns)
First Look at the Raw Data T (25ns)
First Look at the Raw Data T (25ns)
First Look at the Raw Data T (25ns)