Land &Water Resource (2012)

Slides:



Advertisements
Similar presentations
Ad Hoc Working Group on The World at 7 Billion and Beyond: Promoting a Forward-Looking Vision of People-Centred Development POSSIBLE ROLE FOR FAO relating.
Advertisements

Pathleen Titus CARDI Representative , St Kitts and Nevis
Improvement of Water Resources Management in Egypt Hesham Moustafa.
Pradhan Mantri Krishi Sinchayee Yojana (PMKSY)
Mahatma Gandhi National Rural Employment Guarantee Act Ministry of Rural Development Government of India.
Hydropower Development: Experience of Nepal
Water Resources State Mission guided by the National Water Mission
Agricultural Policy Analysis Prof. Samuel Wangwe Executive Director REPOA 28 th July 2012.
MINISTRY OF WATER AND IRRIGATION REVIEW OF FINANCIAL FLOWS TO WATER SECTOR BY ENG. P. MANGITI DIRECTOR LAND RECLAMATION/HEAD DONOR COORDINATION UNIT.
WATER ISSUES IN THE EASTERN EUROPE:
5 th WORLD WATER FORUM WATER AND FOOD FOR ENDING POVERTY AND HUNGER SITUATION IN INDIA AND FUTURE APPROACH PRESENTATION BY CHAIRMAN, CENTRAL WATER COMMISSION.
Brief on Project Development Objectives (PDO) The PDO describes the outcomes for which a project can be held accountable, given the project’s duration,
National Conference of Project Directors of District Rural Development Agencies 23 rd June, 2011.
Objectives  Convergence of investments in irrigation  Enhance access to irrigation  Integration of water source, distribution and application  Improved.
World Bank Assisted Watershed Management Project (WBWMP) ‘Neeranchal’ in Support of IWMP Department of Land Resources Ministry of Rural Development.
Management of Degraded Land to Combat Desertification and Climate Change in India Management of Degraded Land to Combat Desertification and Climate Change.
Journey of Watershed Approach in India B. Pradhan Department of Land Resources Ministry of Rural Development Govt. of India B. Pradhan Department of Land.
Ground Realities of Convergence for Agriculture Development By Dr. J.S. Samra CEO, NRAA, New Delhi
Pradhan Mantri Krishi Sinchayee Yojana
Dr Ranu Rani Sethi Senior Scientist ICAR-IIWM, Bhubaneswar, Odisha District Irrigation Plan (A case study of Nayagarh district of Odisha)
RECENT EFFORTS AT ENHANCING SOCIAL SECURITY FOR UNORGANIZED WORKERS IN INDIA.
BS3: FINANCING OF IRRIGATION PROJECTS 6 th April, 2016 INDIA WATER WEEK by R. K. Agrawal Senior General Manager.
COMMERCIAL BANKS & ECONOMIC DEVELOPMENT. Economic Development may be defined as a process whereby an economy’s National Income is carried on from a lower.
 I am Pashupathy, the ED(Finance) and CFO of Krishna Bhagya Jala Nigam Ltd, an irrigation Corporation of the Government of Karnataka.  KBJNL was incorporated.
Hydrology and Water Resources Engineering ( ) Government Engineering College Rajkot Civil Engineering Department Faculty Guide: Prof V.G.Yadav DROUGHT.
Institutionalizing People’s Participation in Water Resources Planning & Manageme nt- गाँव बढ़े तो देश बढ़े Taking Rural India >> Forward.
ENSURING FOOD SECURITY THROUGH WATER CONSERVATION AND RAIN WATER HARVESTING - WITH SPECIAL REFERENCE TO WESTERN UTTAR PRADESH, INDIA K.B.Biswas, Chairman.
Navin Kumar CE (IMO) Central Water Commission Navin Kumar CE (IMO) Central Water Commission - Need for evolving comprehensive guidelines.
Pradhan Mantri Krishi Sinchayee Yojana. Land &Water Resource (2012)  Total Precipitation 4000 BCM  Utilizable 1123 BCM(SW 690, GW 433)  Utilized634.
(Additional Commissioner)
Pradhan Mantri Krishi Sinchayee Yojana
NABARD’s initiatives on Climate Change
Pradhan Mantri Krishi Sinchayee Yojana (PMKSY)
Proposals for State: ……..
On Farm Water Conservation Mission Jalyukt Shivar Abhiyan
Climate Change Elements of the SADC Regional Agricultural Policy (RAP)
Pradhan Mantri Krishi Sinchayee Yojana (PMKSY)-“Per Drop More Crop”
Pradhan Mantri Krishi Sinchayee Yojana (PMKSY)
Pradhan Mantri Krishi Sinchayee Yojana
India Irrigation Forum (IIF) 7 April, new DELHI needs & objectives of iif to meet sustainable development goal in India Dr Ajay Pradhan india.
AN ENVIRONMENTAL ECONOMIC ASSESSMENT OF SUJALA WATERSHED PROGRAMME IN KOLAR DISTRICT BY POORNIMA K N 2006 Presentation By Gourav Kumar Vani.
Bihar Watershed Development Society (BWDS)
Participatory Irrigation Management in Andhra Pradesh
A presentation to Sub-Group – II
SOCIAL ISSUES AND ENVIRONMENT
Building Climate Smart Farmers – Indian Perspective
Water and Economic Growth
Challenges Encountered in CAD Implementation
CADWM Programme and Present Day Challenges
CARIAA Country Reviews: Methodology and outcomes
GROUP V Presentation on Agrarian Crisis and Agricultural Crisis-Issues and Solutions.
Commissioner MoWR,RD&GR
Dr. S.K. Malhotra Crops Division,
COMMAND AREA DEVELOPMENT AND WATER MANAGEMENT (CADWM)
IMPORTANCE OF AGRICULTURE
Agenda item 5b Main challenges and priorities for future work Implementation of the 2008 SNA in the EECCA, SEE and Mongolia Presentation by UNECE Workshop.
MINISTRY OF AGRICULTURE AND RURAL DEVELOPMENT
Department of Agriculture Cooperation & Farmers Welfare
Features of Indian Five Year Plan .
National Year of Millets Department of Agriculture, Cooperation
CLIMATE CHANGE IMPACTS ON THE WATER RESOURCES OF GHANA
Climate Change Elements of the SADC Regional Agricultural Policy (RAP)
Guatemala Water Management Country Status Factsheet
Addressing the challenge of water scarcity and droughts
Summary of Five year Plans
Irrigation Potential for Water Saving Technologies
STRENGTHENING PP governance for resilient water resources
Shri Vikas Deshmukh, Commissioner, Agri,
Water scarcity and droughts
Presentation transcript:

Land &Water Resource (2012) Total Precipitation 4000 BCM Utilizable 1123 BCM(SW 690, GW 433) Utilized 634 BCM(SW 403,GW 231) Net Sown Area 141 Million ha Gross Cropped Area 195 Million ha Net Irrigated Area 65 Mha (SW 25, GW 40) Irrig. Potential Created 112 Million ha Potential utilized 91 Mha (Gross irrigated) Precision Irrigation 7.7 Million ha

IRRIGATION SCENERIO High dependence of Indian economy on the agricultural sector. 50-60% of the population is engaged in meeting the food demands of the country and thereby acquire livelihood and life sustenance. Out of the 142 million hectares of agricultural land in India, only about 45 percent has the facilities for irrigation. The rest of the agricultural farm is entirely dependent on rainfall for its water needs

IRRIGATION SCENERIO Delay in rainfall or a failure, spells disaster for the farmers Shortfalls in crop, hikes the prices of food items followed by social unrest and economical losses General wellbeing of the people and attached ecosystems and overall economy of the country gets adversely effected.

Regional imbalances

DEVELOPMENT OF IRRIGATION SECTOR In the First Five Year Plan (1951-56), the country launched a major irrigation programme. Number of Multipurpose and Major Projects such as Bhakra Nangal, Nagarjunasagar, Kosi, Chambal, Hirakud, Kakrapar and Tungabhadra were taken up. During the fifth Plan (1974-78), Command Area Development Programme was launched as a Centrally Sponsored Scheme with the objective of reducing the lag between potential created and optimum utilization of available land and water. For speedy completion of ongoing projects in advance stage of construction Accelerated Irrigation Benefit Programme (AIBP) was launched in 1996-1997

Increase in Irrigation Coverage Year Net Irrig Area (Mha) Gross Irrig Area (Mha) 1982 40 51 1992 50 66 2002 57 78 2012 65 91 We have implemented 6 schemes 6

Source of Irrigation Canals 26% Tube wells 45% Dug Wells 18% Tanks 3.5% Others 7.5%

7.7 Mha covered under precision irrigation Opportunity 7.7 Mha covered under precision irrigation Out of 141 Mha 64 Mha 77 Mha

Plan-wise Cumulative IPC and IPU under MMI

Plan-wise expenditure incurred on Irrigation and Flood Control Sectors Sl. No Plan Period Major & Medium Irrigation MI/MI & CAD Total Irrigation Flood Control Total Plan Expenditure All Sectors Percentage expenditure on Irrigation 1. First (1951-56) 376.2 65.6 441.8 13.2 1960 23 2. Second (1956-61) 380.0 161.6 541.6 48.1 4672 12 3. Third (1961-66) 576.0 443.1 1019.1 82.1 8577 4. Annual (1966-69) 429.8 560.9 990.7 42 6625 15 5. Fourth (1969-74) 1242.3 1173.4 2415.7 162 15779 6. Fifth(1974-78 2516.2 1409.6 3925.8 298.6 28653 14 7. Annual (1978-80) 2078.6 1344.9 3423.5 330 22950 8. Sixth (1980-85) 7368.8 4159.9 11528.7 787 109292 11 9. Seventh (1985-90) 11107.3 7626.8 18734.1 941.6 218730 9 10. Annual (1990-92) 5459.2 3649.5 9108.7 460.6 123120 7 11. Eighth (1992-97) 21071.9 13885.3 34957.2 1691.7 483060 8 12. IX Plan(1997-02) 49289.0 13760 83049.0 3038 941041 13. X Plan (2002-07) 83647.0 16458.9 100105.9 4344.18 1618460 6 XI Plan (2007-2012) Outlay (Projection) 165350 46350 211700 20100 3644718

Year-wise Progress inXI Plan under MMI Physical (in mha) Financial (in Rs. Crore) Potential created/anticipated Expenditure/Outlay 2007-08 0.84 29390.64 2008-09 1.02 32341.80 2009-10 1.12 34882.26# 2010-11 2.02* 68735.3* 2011-12 Total 5.00 165350 ## *anticipated #Revised Approved Outlay ## Recommended Outlay by Working Group for XI Plan

Plan-wise Progress under CAD Works Central Assistance released under CADWM Programme (Rs. Crore) Period Outlay approved by Planning Commission BE Allocation Release % Release w.r.t. BE Allocation IX Plan 1000 825.72 751.66 91.03 X Plan 1208 969.8 818.57 82.12 XI Plan   2007-08 300 277.14 92.38 2008-09 350 324.29 92.68 2009-10 400 413.7 103.4 2010-11 499 456.4 91.5

Plan-wise Progress under CAD Works Cumulative progress of works of field channels and drains (Million Hectare) Item of work Cumulative achievement since 1974-75 to 1996-97 Achievement during   IX Plan X Plan 2007-08 2008-09 2009-10* 2010-11* Field Channel 13.95 1.8 2.31 0.394 0.429 0.384 0.413 Field Drains 0.77 0.35 0.64 0.069 0.13 0.094 0.058

TOTAL WATER USE ASSESSED BY NCIWRD (1999) Sl. No Total Water Use (in BCM)    Uses Year 1997-98 Year 2010 Year 2025 Year 2050 %in Year 2010 %in Year 2025 Low High 1 Irrigation 524 543 557 561 611 628 807 78 72 2 Domestic 30 42 43 55 62 90 111 6 7 3 Industries 37 67 81 5 8 4 Power 9 18 19 31 33 63 70 Inland Navigation 10 15 Flood Control Environment(1) Afforestation Env.(2)Ecology 20 Evaporation losses 36 50 76 Total 629 694 710 784 843 973 1180 100

General Constraints contd Lack of integrated and coordinated approach Lack of holistic implementation of Programmes Widening Gap between IPC and IPU Lack of thrust on Precision Irrigation Modernisation of State Irrigation Departments Non-adoption of PIM in many States and non-functional WUAs in the States where the PIM Act has been adopted contd

General Constraints Policy issues Laws Land tenancy rights Free electicity No incentive for water use efficiency Laws Land tenancy rights MSP for other crops Lack of Funds Almost negligible collection of cess No O&M Build forget and rebuild aproch

Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) Har Khet Ko Paani

Enhanced farm productivity Vision Strategy Outcome Increase gross irrigated area More crop per drop Access to Irrigation to every farm (Har Khet ko Pani) Bridging the gap between irrigation potential & utilisation Enhanced farm productivity Creating/Strengthening water distribution network Rural prosperity Enhance water use efficiency & management

Objectives Achieve convergence of investments in irrigation at the field level (preparation of district level and, if required, sub district level water use plans). Enhance the physical access of water on the farm and expand cultivable area under assured irrigation (Har Khet ko pani), Integration of water source, distribution and its efficient use, to make best use of water through appropriate technologies and practices. Improve on-farm water use efficiency to reduce wastage and increase availability both in duration and extent, Enhance the adoption of precision-irrigation and other water saving technologies (More crop per drop). Enhance recharge of aquifers and introduce sustainable water conservation practices

Objectives Enhance recharge of aquifers and introduce sustainable water conservation practices Ensure the integrated development of rainfed areas using the watershed approach towards soil and water conservation, regeneration of ground water, arresting runoff, providing livelihood options and other NRM activities. Promote extension activities relating to water harvesting, water management and crop alignment for farmers and grass root level field functionaries. Explore the feasibility of reusing treated municipal waste water for peri-urban agriculture, and Attract greater private investments in irrigation.

Programme Components (MoWR,RD&GR) A. Accelerated Irrigation Benefit Programme(AIBP) To focus on faster completion of ongoing Major and Medium Irrigation including National Projects. B. PMKSY (Har Khet ko Pani) Creation of new water sources through Minor Irrigation Repair, restoration and renovation of water bodies (Jal Sanchay); Command area development, strengthening and creation of distribution network from source to the farm; Ground water development in the areas where it is abundant, Improvement in water management and distribution system for water bodies. Diversion of water from source of different location where it is plenty to nearby water scarce areas, Creating and rejuvenating traditional water storage systems like Jal Mandir (Gujarat); etc. at feasible locations.

Programme Components (Other Ministries) PMKSY(Per Drop More Crop): Ministry of Agriculture Micro level storage structures, efficient water conveyance & application, precision irrigation systems, topping up of input cost beyond MGNREGA permissible limits, secondary storage, water lifting devices, extension activities, coordination & management . PMKSY (Watershed): Deptt. of Rural Development Ridge area treatment, drainage line treatment, soil and moisture conservation, water harvesting structure, livelihood support activities and other watershed works.

Thrust Areas of MoWR, RD&GR Bridging the gap between irrigation potential creation and utilization Emphasis on Command Area Development Project benefitting DPAP areas and DDP areas to be assigned higher priority Completion of priority MMI projects Judicious use of ground water and recharge of ground water

Issues & Constraints Total requirement of fund to achieve Har Khet Ko Pani will be about Rs. 15.4 lakh crore [Rs. 2.00 lakh/ha for complete chain of activities (Source-Distribution-Application-Extension)] - Current year allocation of Rs. 5300 crore. Pending large liabilities under AIBP and IWMP will affect prioritizing projects Unless precision farming is expanded through Bank finance and NBFCs, coverage will be limited by the total subsidy alone. Free water, power and subsidy on diesel, is a serious disincentive for adaptation of precision irrigation Change in funding pattern to 50:50 from the existing level may slow down the pace of implementation Difficult to ensure appropriate coordination, synergy and convergence at field level in the existing system with diverged heterogeneity in administrative hierarchy

Challenges & Way Forward Compilation of District-wise Data in spatial layers in terms of: Agricultural Area (Crop-wise) Area under Irrigation Scheme-wise; existing, ongoing and proposed Natural water bodies with size Ground water scenario Delineation of un-irrigated area Preparation of schemes for providing irrigation to un-irrigated area; either through extension of existing schemes or introduction of new scheme, through precision irrigation Impact of watershed development on existing projects and catchment areas of the proposed projects

Challenges & Way Forward Preparation of District Irrigation Plans (DIPs) ensuring convergence of all the schemes of the three Line Miniseries and resolving trans-boundary issues Prioritization of various schemes in DIPs in terms of return values Options available through interlinking of Rivers for water deficit areas Exploring Funding Options Making the irrigation sector self sustainable through participation of Private sectors Implementation of water sector reforms Socio-political issues in terms of prioritization and completion of schemes

Session directed to house The session is dedicated to generate discussion on delivering its vision oriented objectives, Effeciency enhancement Use of pipe net work in ERM project Use of micro irrigation PPP for farmers benefit Use of volumetric measurement technique Change in mindset of states to adopt Micro irrigation Mode of disbursement of funding, Way forward for its successful implementation. Suggestions to further improve or augment the scheme.

THANK YOU