PLC-based control systems at SOLEIL - ICALEPCS 2017

Slides:



Advertisements
Similar presentations
Control and IT Systems status and strategy ALBA, Piotr Goryl on behalf of Michał Ostoja-Gajewski, Krzysztof Wawrzyniak, Łukasz Żytniak, Tadeusz.
Advertisements

NetSure™ RDB Series.
André Augustinus 16 June 2003 DCS Workshop Safety.
Laboratory for SoC design TEMPUS meeting Niš,
Hamid Shoaee LCLS FAC Controls June 17, LCLS Control System Personnel Linac & BC2 Controls progress LTU, Dump Controls.
AS-i, The Simplest Automation Networking Solution Dated: 10/30/2008.
Notes: For the installation of a PB network, you can use shielded twisted pair copper cable, glass or plastic FO and infrared components. And you can mix.
Industrial Control Engineering Industrial Controls in the Injectors: "You (will) know that they are here" Hervé Milcent On behalf of EN/ICE IEFC workshop.
PM-RS / March Industrial CMC. PM-RS / March Industrial CMC III Where did it start? Where is it headed? Rittal supplies infrastructure for.
February 17-18, 2010 R&D ERL James Jamilkowski R&D ERL Controls Larry Hoff James Jamilkowski February 17-18, 2010 Controls.
Digital PECVD Machine Design and Construction Zlatan Ceric William Edwards Timothy Gurtler David Ogden Quan Tran Date:12/10/2010.
ITS Subsystems Availability MACS Week, June 2011 E. Sargsyan PP a-ESA_ITS_MACS_Week_June2011.pptm E. Sargsyan ITS Subsystems Availability 1.
IRRInet & ICC System Concept
Workshop “Vacuum systems of Synchrotron Light Sources“ organized by MAX-LAB & ALBA Barcelona, th September 2005 Instrumentation and Vacuum Control.
Openlab Workshop on Data Analytics 16 th of November 2012 Axel Voitier – CERN EN-ICE.
NCSX NCSX Preliminary Design Review ‒ October 7-9, 2003 G. Oliaro 1 G. Oliaro - WBS 5 Central Instrumentation/Data Acquisition and Controls Princeton Plasma.
1 Kenneth Osborne, 9/14/07 Inter Group communications at the Advanced Light Source. Overview of the different methods of communication between different.
CLS Machine Protection and PLC Hardware Presentation to Beamlines Group Elder Matias Canadian Light Source University of Saskatchewan October 20, 2001.
The microIOC Family Gasper Pajor EPICS Collaboration Meeting Argonne National Laboratory June 2006.
CLS Control System Progress Report Elder Matias Canadian Light Source University of Saskatchewan Saskatoon Saskatchewan.
FAIR Accelerator Controls Strategy
DFC on behalf of controls software and electronics groups Tango meeting March 19 th 2007 Status of Alba Controls.
Instrumentation at CLS (Presentation to Saskatchewan Instrumentation Society Executive) Elder Matias Canadian Light Source University of Saskatchewan
Adrian Oates Daresbury Laboratory ALICE Control System July 08.
FAIR PROJECT COST BOOK. FAIR cost 1.2 mld euro 1. Civil construction and infrastructure 322Meuro 2. Accelerator systems 592 Meuro 3. Experimental facilities.
LHC Cryogenics Control: INTEGRATION OF THE INDUSTRIAL CONTROLS (UNICOS) AND FRONT-END SOFTWARE ARCHITECTURE (FESA) APPLICATIONS Enrique BLANCO Controls.
Internet 0 for Industrial Applications Fred Cohn 13-Dec-07.
Steve Lewis Gas Attenuator 11 December Instrumentation & Controls Steve Lewis 11 December 2006 LCLS Gas Attenuator Preliminary.
7th IMAC Meeting 7th MACHINE ADVISORY COMMITTEE MEETING OF TARLA CONTROL SYSTEMS Ayhan AYDIN ANKARA UNIVERSITY ON BEHALF OF TARLA TEAM.
Managed by UT-Battelle for the Department of Energy SCL Vacuum Control System Upgrade Derrick Williams
ICALEPCS 2007 The Evolution of the Elettra Control System The evolution of the Elettra Control Sytem C. Scafuri, L. Pivetta.
News from LAL on Vacuum System Racks for cryotraps: call for tender done provider selected purchase of electro-tech components in progress prototype expected.
Updated Overview of Run II Upgrade Plan Beam Instrumentation Bob Webber Run II Luminosity Upgrade Review February 2004.
11 th February 2008Brian Martlew EPICS for MICE Status of the MICE slow control system Brian Martlew STFC, Daresbury Laboratory.
CEA DSM Irfu SIS LDISC 18/04/2012 Paul Lotrus 1 Control Command Overview GBAR Collaboration Meeting Paul Lotrus CEA/DSM/Irfu/SIS.
1 September 2007 – Tango Meeting – A.Buteau ICALEPS 2005 Status report SOLEIL September 2007.
R. A. Barlow, LIU-PSB review, 20 Nov BI.DIS Pulse generators controls R.A.Barlow, LIU-PSB review, 20 Nov
Danish Ali Nawaz 1CLIC workshop 2016 Danish Ali NAWAZ, BE-ABP LEETCHI: Drive Beam Electron Source Automation Control.
Laser Control Status A. Masi, T. Feniet, K. Szczurek Awake Technical Board November 12 th 2015 Thanks for inputs from: M. Donze`, V. Fedosseev, C. Hessler.
Alice TOF Production Readiness Review Gas Control Systems.
Data Acquisition, Diagnostics & Controls (DAQ)
Report Technical Director Storage-Ring-Installation Completed
HMS Status Steven Lassiter Jan 20, 2017.
Report Technical Director Storage-Ring-Installation Completed
SESAME Control System Status
Presented by Li Gang Accelerator Control Group
FCT and CERN Portuguese Trainee Programme Report
UNICOS: UNified Industrial COntrol System CPC (Continuous Process Control) Basic course SESSION 3: PLC basics UCPC 6 UNICOS-Continuous Process Control.
LAPP BPM Read-out Electronics
Facility for Rare Isotope Beam (FRIB) PLC Control Systems Introduction
Recent developments in the Vacuum Control Software
Concepts and practices applied to PLCs at SOLEIL From specification up to development. ICALEPCS 2017 Patrick ROMMELUERE on behalf of Electronics, control.
352MHz Klystron Control for the 3MeV Linac test stand
Engineering - potential areas for action
XFEL Vacuum System Commissioning
Proton Source and LEBT Luigi Celona & Lorenzo Neri
Programmable Logic Controllers (PLCs) An Overview.
Peter Erning, PSP-T11, Power Gen 2010
EPICS Controls Steve Lewis 13 December 2007
PLC Hardware Components.
LTU/Undulator Installation Status
CERN with UNICOS M. Pezzetti AT_ECR_CE 27 June 2005.
Experimental Program and Endstations System (WBS ) J
Upgraded Injector Test Facility
LTU/Undulator Installation Status
Vacuum Control System for Monolith Vacuum
Field installable, upgradeable and scaleable
LCLS Control System Personnel Linac & BC2 Controls progress
Project Migration / Management
Overview of Computer system
Presentation transcript:

PLC-based control systems at SOLEIL - ICALEPCS 2017 Patrick ROMMELUERE on behalf of Electronics, control and acquisition group

Since 2006: French synchrotron light facility Electron storage ring (354m circumference / 500mA@2.85GeV) 29 Beamlines in operation (43 possible) Permanent staff: 357 persons ~58M€/year operation budget St-Aubin (~25 km from Paris) 2700+ users per year All scientific domains using X-rays covered 43 weeks of run per year (5200 h) 1 machine day/week

Types and applications of PLC Technical choices: SIEMENS S7 300 Profibus DP as fieldbus Domain Quantity Details Vacuum ~130 Machine & Beamlines Machine interlocks 21 Use of daisy chained Boolean processors (FM352) Magnet power supply (DC and pulsed) 31 Large Profibus networks (max 104 slaves, 600 meters long) Radiofrequency cavities 9 Personal Safety System ~60 Safety modules & program Beam Diagnostics 36 Cryogenics 2 External programming by subcontractors Ventilation & cooling ~30 Full Honeywell supply (hardware, installation, programming & maintenance)

Hardware, network and software integration 19’’ rack integration: PLC at the top of racks. Industrial cabling elements mounted on rear plate. Valve Device Server Ion Pump Device Server Ethernet control network PLC Benefits of TANGO: Software representation of physical devices Compatible with multiple supervision applications languages Native monitoring & Archiving tools Profibus Digital or analog signals Front Rear Valve Ion pump

Lifecycle engineering Step Performer Remarks Specifications Machine or beamline staff Almost every format accepted, then translated into more formalized documents by automation group. Wiring scheme Automation group Sometimes performed by subcontractors Cabling and hardware integration Software development Now covers also the associated TANGO Device Servers Testing and commissioning Machine or beamline staff & Automation group Site acceptance tests Maintenance Use of computerized maintenance management system for stocks & elements lifecycle

Workshop expectations Overview of other institutes PLC based controls systems S7-3xx PLC series and Step7 obsolescence management (end of delivery dates, progressive replacement methods) TIA Openess API experience ? PLC diagnostics: how and use