Rotation Target R and D of ILC E-driven source

Slides:



Advertisements
Similar presentations
Target Wheel Prototype Progress LC-ABD / LCUK – Apr Leo Jenner & Ian Bailey Cockcroft Daresbury Laboratory.
Advertisements

Field measurements of QEA magnets at KEK Mika Masuzawa May 30, 2006.
Iván Fernández CIEMAT 2 nd EU-US DCLL Workshop, University of California, Los Angeles, Nov th, 2014.
Radiation Dose in a FerroFluid Seel ~an Update~ Tohru Takahasi AWLC2014.
KEK Recent results of beam tests on clearing electrode and grooves 2010/1/191ILC DR WebEx Meeting Y. Suetsugu, KEK.
Overview of 300 Hz Conventional e + Source for ILC Truly Conventional Collaboration ANL, IHEP, Hiroshima U, U of Tokyo, KEK, DESY, U of Hamburg NIM A672.
Tungsten wire & VISAR Goran Skoro 24 October 2008.
Ian Bailey Cockcroft Institute/ Lancaster University October 30 th, 2009 Baseline Positron Source Target Experiment Update.
JCS e + /e - Source Development and E166 J. C. Sheppard, SLAC June 15, 2005.
Simulation of Air-Cooling for the Gear Unit in Pump and Turbine Generator Systems M. Fujino* and T. Sakamoto** *Information Technology Center, Nippon Institute.
Target Wheel Prototype Progress Zeuthen meeting – Apr 7-9 Leo Jenner & Ian Bailey Cockcroft Daresbury Laboratory.
ILC Rotating Target - Active Sliding Contact Cooling Wei Gai, Manoel Conde, Wanming Liu, Scott Doran, Vic Guarino, George Fenske (ES), Robert Erck (ES),
Radiation Cooling of the ILC positron target LCWS 2014, Belgrade, Serbia 7 th October 2014 Sabine Riemann, DESY, Peter Sievers, CERN/ESS, Andriy Ushakov,
Undulator Based ILC Positron Source Studies Wei Gai Argonne National Laboratory CCAST ILC Accelerator Workshop Beijing, Nov 5 – 7, 2007.
Cavity status; recent KEK activities : Hayano (1) STF CM-1 cavities are; MHI-014: 3-rd VT:36MV/m (finished) MHI-015: 3-rd VT: > 18.4MV/m.
NuMI NBI2006 September 6, 2006 NuMI Target Experience Jim Hylen / FNAL Page 1 Experience with the NuMI Target Max. Proton/spill Max. Beam Power Integrated.
Evaporative Heater Design, qualification and planning M.Olcese PRR SCT off-detector cooling PRR SCT off-detector cooling March March 2005.
MICE Target - Risk Lara Howlett University of Sheffield.
Conventional e + Source Rotation Target R/D T. Omori (KEK) ANL, IHEP, Hiroshima U, U of Tokyo, KEK, DESY, U of Hamburg, CERN 3-Sep-2015 POSIPOL 2015, Cockcroft.
1 Flux concentrator for SuperKEKB Kamitani Takuya IWLC October.20.
Key luminosity issues of the positron source Wei Gai.
Felix Dietrich | AWLC14 | | Stress simulation in the ILC positron target with ANSYS Felix Dietrich (TH-Wildau), Sabine Riemann, Friedrich Staufenbiel.
Positron Source General Update M. Kuriki(Hiroshima U./KEK) ALCW2015, April 2015,Tsukuba/Tokyo, Japan.
Status of target and photon collimator work for polarized e+ LCWS 2014, Belgrade, Serbia 7 th October 2014 Sabine Riemann, Friedrich Staufenbiel, DESY.
Current standing of the undulator based ILC positron source Wei Gai AWLC 14 FNAL, May
Development of a Positron Production Target for the ILC Positron Source Capture Optics Positron beam pipe/ NC rf cavity Target wheel Vacuum feedthrough.
Ian Bailey University of Liverpool / Cockcroft Institute UK Target Update EUROTeV: WP4 (polarised positron source) PTCD task I. Bailey, J. Dainton, L.
Results of the argon beam test at Linac3 D. Küchler BE/ABP/HSL Including feedback from R. Scrivens and M. Bodendorfer.
REMOTE-HANDLING OVERVIEW I. Bailey Cockcroft Institute / University of Liverpool.
Felix Dietrich | LCWS 2014 | | Target stress Analysis at DESY Felix Dietrich (TH-Wildau), James Howarth, Sabine Riemann (DESY), Friedrich Staufenbiel.
A Report from PosiPol2015 to AD&I meeting (10 Sep. 2015) Masao KURIKI (Hiroshima University)
Conventional e + Source Rotation Target R/D T. Omori (KEK) ANL, IHEP, Hiroshima U, U of Tokyo, KEK, DESY, U of Hamburg, CERN 3-Nov-2015 LCWS 2015, The.
Status: Cooling of the ILC e+ target by thermal radiation LCWS 2015, Whistler, Canada 3 rd November 2015 Felix Dietrich (DESY), Sabine Riemann (DESY),
ATF Fast Ion Study Plan N.Terunuma (KEK) Results in 2007, 2008 Vertical emittance studies at ATF Plan.
Task 6: Short Period Nb3Sn Superconducting Helical Undulator George Ellwood
F.Staufenbiel / EuCARD 2 / Heat load and stress studies of the ILC collimator G. Moortgat-Pick 1;2 S. Riemann 2, F. Staufenbiel 2, A. Ushakov.
Target studies for the ILC 300 Hz conventional e + source 29-May-2013 ECFA LC Workshop at DESY T. Omori Target study team: K. Yokoya (KEK), J. Urakawa.
November 20, 2008 A. Brachmann Slide 1 Sources Session Summary LCWS 2008 A. Brachmann, J. Clarke.
Rotating Vacuum Seal Learning from Experiences of SLC and NLC T. Omori (KEK), with many thanks to Marc-san 28 March 2010, ILC10&LCWS10 at Beijing.
Simulation of heat load at JHF decay pipe and beam dump KEK Yoshinari Hayato.
ID week 27 th of April 15 C3F8 cooling- Compressors & C3F8 status O. Crespo-Lopez EN/CV.
Technical Design for the Mu3e Detector Dirk Wiedner on behalf of Mu3e February Dirk Wiedner PSI 2/15.
ILC Undulator Based Position Source Target System Wei Gai, HEP, ANL TB meeting 8/5/2014.
11/12/20151 Status of high intensity polarized electron gun project at MIT-Bates Evgeni Tsentalovich MIT.
Design for a 2 MW graphite target for a neutrino beam Jim Hylen Accelerator Physics and Technology Workshop for Project X November 12-13, 2007.
Positron Source for Linear Collider Wanming Liu 04/11/2013.
SPS High Energy LSS5 Thermal contact & cooling aspects
Design Principals for ILC- Positron Targets Peter Sievers-CERN-ESS POSIPOL 2013,Argonne P.Sievers/POSIPOL131.
SF6 contamination by air in the Pelletron Recycler Departmental Meeting November 5, 2008 A. Shemyakin.
Progress with Zeuthen Meeting Actions Jim Clarke ASTeC, STFC Daresbury Laboratory.
Summary of STF-EP facility at KEK.
Masao KURIKI (Hiroshima University)
Holders and Pumps Summary
POSIPOL 2016 at LAL/Paris, Sept Peter Sievers-CERN
Beam Dump Hall Volume Beam Dump Meeting at SLAC May S.Ban
Summary of WG1 (Positron WG) Status
A Positron Target Concept for the ILC
Pair-Production Target
ELENA installation and commissioning status
P. Sievers/CERN. A. Ushakov/Univ. Hamburg. S. Riemann/DESY-Zeuthen.
Performance of an Automated Water Based Cooling System for CBM MuCh
Summary of activities of the pellet target development
Rotation Target R and D of ILC E-driven source
LCWS Strasbourg October 2017
Toward the final design of a TPC for the ILD detector
Beam Dump outline work plan (UK perspective)
Recent Electron Cloud Studies at CESR and Future Plans
Summary for the Sources working group
IHEP ILC Cavity Status Jiyuan Zhai (IHEP)
Lithium lens and window tests
Presentation transcript:

Rotation Target R and D of ILC E-driven source ferromagnetic fluid seal air vacuum T. Omori (KEK), 27-June-2017 2017 Americas Workshop on Linear Colliders AWLC17 June 26-30, 2017, SLAC, Menlo Park, CA

Target Positron Electron W-Re 14mm thick. 5 m/s tangential speed rotation (225 rpm, 0.5m diameter) in vacuum. Water cooling through channel. Vacuum seal with ferro-fluid.

R/D of the Slow Rotation Target of the Conventional e+ Source Today’s Talk R/D of the Slow Rotation Target of the Conventional e+ Source for ILC • Target R/D (1): Heat&Stress Simulations, and Radiation Test • Target R/D (2): Vacuum Test of the Prototype • Summary

Heat&Stress Simulations and Radiation Test

Simulation : target stress and cooling Pulse#02 225rpm Pulse beam analysis: step 2 20 trains (pulses) in 63 ms Temp.Max.; 356.0℃ Max-Stress (Von-Mises): 470 MPa Stress: OK Cooling: OK Max-Stress is as same as that of SLC target. SLC target worked in 3-4 years. Number of hit / Year.mm NILC = NSLC/10  Fatigue: ILC is 10 times better than SLC Nb = 2600 Simulated by Rigaku Cooling water: 60 l /min

TEST: Radiation Tolerance FY2014 Takasaki Advanced Radiation Research Institute, JAEA November 2014 10-Nov-2014

TEST: Radiation Tolerance November 2014 More systematic study for CN oil FY2014 Dose [MGy] Viscosity Viscosity as a function of dose 4.7 MGy The seal dosed 4.7 MGy (3 ILC year) is examined with Ar purged chamber. Rotation : 0-600 rpm. No leak was found.

Conventional (E-driven): Target T. Omori

Vacuum Test of the Prototpe

Prototype of the Rotation Target (E-driven) Central Part hollow shaft motor baring ferrofluid seal vacuum chamber disk • d= 500 mm • wait ~ 70 kg • no water channel finished in FY2015

Prototype: Central Part hollow shaft motor bearings ferrofluid seal water seal water outlet water inlet finished in March 2016

Central Part Prototype Vacuum Test Feb/2017 Central Part Prototype: Funded by KEK Vacuum Test: Funded mostly by Hiroshima Univ.

Central Part Prototype Vacuum Test Feb/2017 Vacuum chamber Ion pump 100 litter/sec Central part prototype Central Part Prototype: Funded by KEK Vacuum Test: Funded mostly by Hiroshima Univ.

Central Part Prototype Vacuum Test Facts and What happened (1) • Ion pump 100 litter/sec. • Rotation at 225 rpm (design value). • We started the experiment on February 9th.

Central Part Prototype Vacuum Test Log (Pressure) [Pa] 9/Feb 16/Feb 23/Feb   2/Mar 9/Mar 16/Mar 23/Mar Date 225 rpm (design value) 1x10-5 3x10-6 4x10-6 2x10-5 5x10-6 The test started on February 9th with continuous rotation at 225 rpm 3x10-6 Pa The vacuum test started on February 9th with continuous rotation at 225 rpm (design value). The vacuum level seems to be reasonable in comparison with the expectation. The vacuum level is as good as the ILC TDR requirement. It seems promising. But the prototype has no disk. We will make further study.

Central Part Prototype Vacuum Test 225 rpm February/13 – March/28 Pressure [Pa] x10-6 Note: Linear scale Date 13/Feb 23/Feb 5/Mar 15/Mar 25/Mar 4/Apr 3x10-6 Pa 7 7 6 6 5 5 4 4 3 3 225 rpm

Central Part Prototype Vacuum Test Facts and What happened (1) • Ion pump 100 litter/sec. • Rotation at 225 rpm (design value). • We started the experiment on February 9th. • Vacuum level went good monotonically. • And reached ~ 3x10-6 Pa at the end of March.

Central Part Prototype Vacuum Test March/28 – Apr/09 225 rpm 9 7 Pressure [Pa] x10-6 Note: Linear scale 5 3x10-6 Pa 3 1 28/Mar 7/Apr 17/Apr 27/Apr 7/May 17/May Date 225 rpm

Central Part Prototype Vacuum Test Facts and What happened (1) • Ion pump 100 litter/sec. • Rotation at 225 rpm (design value). • We started the experiment on February 9th. • Vacuum level went good monotonically. • And reached ~ 3x10-6 Pa at the end of March. • Vacuum level was stable at ~ 3x10-6 until April 10th.

Central Part Prototype Vacuum Test March/28 – Apr/09 225 rpm 9 7 Pressure [Pa] x10-6 Note: Linear scale 5 3x10-6 Pa 3 1 28/Mar 7/Apr 17/Apr 27/Apr 7/May 17/May Date 225 rpm

Central Part Prototype Vacuum Test Small spikes (x1.5 – x 2) were obsreved March/28 – May/09 225 rpm 9 x2 April 10th 7 Pressure [Pa] x10-6 Note: Linear scale x1.5 5 4x10-6 Pa 3x10-6 Pa 3 1 28/Mar 7/Apr 17/Apr 27/Apr 7/May 17/May Date 225 rpm

Central Part Prototype Vacuum Test Facts and What happened (1) • Ion pump 100 litter/sec. • Rotation at 225 rpm (value). • We started the experiment on February 9th. • Vacuum level went good monotonically. • And reached ~ 3x10-6 Pa at the end of March. • Vacuum level was stable at ~ 3x10-6 until April 10th. • Then, we observed small spikes. - High of a spike ~x1.5.

Same weight as real wheel. Prototype test (not full size yet) of the unduraor target at LLNL was not fully successful (2010-2012 ) Same weight as real wheel. Smaller diameter. 2000 rpm Note: Logarithmic scale Note: Torr

Central Part Prototype Vacuum Test Facts and What happened (1) • Ion pump 100 litter/sec. • Rotation at 225 rpm (design value). • We started the experiment on February 9th. • Vacuum level went good monotonically. • And reached ~ 3x10-6 Pa at the end of March. • Vacuum level was stable at ~ 3x10-6 until April 10th. • Then, we observed small spikes. - High of a spike ~x1.5. (cf. Undulator target at LLNL, spikes ~x100- x1000)

Central Part Prototype Vacuum Test Small spikes (x1.5 – x 2) were obsreved March/28 – May/09 225 rpm 9 x2 April 10th 7 Pressure [Pa] x10-6 Note: Linear scale x1.5 5 4x10-6 Pa 3x10-6 Pa 3 1 28/Mar 7/Apr 17/Apr 27/Apr 7/May 17/May Date 225 rpm

Central Part Prototype Vacuum Test Close-up of the small spikes 225 rpm 2 hours 3.5x10-6 Pa x1.5 1 3 5 7 9 Pressure [Pa] x10-6 Note: Linear scale Apr/21, 7:46 – Apr/22, 03:46 225 rpm

Central Part Prototype Vacuum Test Facts and What happened (1) • Ion pump 100 litter/sec. • Rotation at 225 rpm (design value). • We started the experiment on February 9th. • Vacuum level went good monotonically. • And reached ~ 3x10-6 Pa at the end of March. • Vacuum level was stable at ~ 3x10-6 until April 10th. • Then, we observed small spikes. - High of a spike ~x1.5. (cf. Undulator target at LLNL, spikes ~x100- x1000) - The time constant was 10-60 minutes.

Central Part Prototype Vacuum Test Small spikes (x1.5 – x 2) were obsreved March/28 – May/09 225 rpm 9 x2 April 10th 7 Pressure [Pa] x10-6 Note: Linear scale x1.5 5 4x10-6 Pa 3x10-6 Pa 3 1 28/Mar 7/Apr 17/Apr 27/Apr 7/May 17/May Date 225 rpm

Central Part Prototype Vacuum Test Facts and What happened (1) • Ion pump 100 litter/sec. • Rotation at 225 rpm (design value). • We started the experiment on February 9th. • Vacuum level went good monotonically. • And reached ~ 3x10-6 Pa at the end of March. • Vacuum level was stable at ~ 3x10-6 until April 10th. • Then, we observed small spikes. - High of a spike ~x1.5. (cf. Undulator target at LLNL, spikes ~x100- x1000) - The time constant was 10-60 minutes. • Vacuum went gradually bad, it was ~4x10-6 on May 10th. • Something seemed to be aging. Ferrofluid?

Central Part Prototype Vacuum Test Conclusion (1) • 3-5x10-6 Pa is kept with 225 rpm rotation with 100 l/s ion pump. • The vacuum level is the same as expected. • It is promising. • However we have concern for lifetime of the system.

Central Part Prototype Vacuum Test Facts and What happened (2) • Something seemed to be aging. Ferrofluid? • When ferrofluid aged, small air void penetrate via ferrofluid? • We stopped rotation on May 11th

Central Part Prototype Vacuum Test On May/11, we stopped rotation May/11 – May/15 x10 9 7 x3 Pressure [Pa] x10-6 Note: Linear scale 5 4x10-6 Pa 3 2x10-6 Pa 1 225 rpm 0 rpm May/11 10:15, Stop Rotation

Central Part Prototype Vacuum Test Facts and What happened (2) • Something seemed to be aging. Ferrofluid? • When ferrofluid aged, small air void penetrate via ferrofluid? • We stopped rotation on May 11th - Vacuum level got better 4x10-6 2x10-6. - We observed larger spikes. The height was x3 – x10. - Sikes were rather periodic. T = 5 hours 50 minutes.

Central Part Prototype Vacuum Test May/16 14:22 0 rpm 9 15 seconds 7 Pressure [Pa] x10-6 Note: Linear scale 5 3 1

Central Part Prototype Vacuum Test Facts and What happened (2) • Something seemed to be aging. Ferrofluid? • When ferrofluid aged, small air void penetrate via ferrofluid? • We stopped rotation on May 11th - Vacuum level got better 4x10-6 2x10-6. - We observed larger spikes. The height was x3 – x10. - Sikes were rather periodic. T = 5 hours 50 minutes. - Sikes were very short term.

Central Part Prototype Vacuum Test Facts and What happened (2) • Something seemed to be aging. Ferrofluid? • When ferrofluid aged, small air void penetrate via ferrofluid? • We stopped rotation on May 11th - Vacuum level got better 4x10-6 2x10-6. - We observed larger spikes. The height was x3 – x10. - Sikes were rather periodic. T = 5 hours 50 minutes. - Sikes were very short term. Conclusion (2) • We don't quit understand the phenomena yet. But, since situation changed when we stopped rotation, we judged the aging of ferrofluid caused the deterioration of the vacuum quality.

Central Part Prototype Vacuum Test Next steps (1) Our guesses • We suspected aging of the ferrofluid caused the deterioration of the vacuum quality. • We suspected temperature rise of the ferrofluid by rotation may affect the aging.

Central Part Prototype Vacuum Test Next steps (1) Our guesses • We suspected aging of the ferrofluid caused the deterioration of the vacuum quality. • We suspected temperature rise of the ferrofluid by rotation may affect the aging. Next steps (1) • We are going to enhance the cooling water channel. • We added temperature monitor (thermocouple) at near the ferrofluid seal (unfortunately not really near).

Central Part Prototype Vacuum Test Enhancement of the Water Cooling Channel Before Enhancement OUT IN

Central Part Prototype Vacuum Test Enhancement of the Water Cooling Channel Before Enhancement OUT IN Rotating Water Seal and Inside the Shaft are cooled

Central Part Prototype Vacuum Test Enhancement of the Water Cooling Channel After Enhancement IN OUT IN OUT IN OUT

Central Part Prototype Vacuum Test Enhancement of the Water Cooling Channel After Enhancement IN OUT IN OUT IN OUT Rotating Water Seal, Inside the Shaft, Motor, and Near Ferrofuild Seal are cooled

Central Part Prototype Vacuum Test Enhancement of the Water Cooling Channel After Enhancement

Central Part Prototype Vacuum Test We added thermocouple at near the ferrofluid seal

Central Part Prototype Vacuum Test Next steps (1) Our guesses • We suspected aging of the ferrofluid caused the deterioration of the vacuum quality. • We suspected temperature rise of the ferrofluid by rotation may affect the aging. Next steps (1) • We are going to enhance the cooling water channel. • We added temperature monitor (thermocouple) at near the ferrofluid seal (unfortunately not really near). • We are going to change water temperature. 25 C (now) 20 C 15 C. We will do it begging of July. • We will check lower limit of the temperature which doesn't make condensation of the water in air.

Central Part Prototype Vacuum Test Next steps (2) Next steps (2) • We will break vacuum on July 19th. • The vacuum seal will be send back to Rigaku. Rigaku exchange ferrofluid. • We will reinstall the vacuum seal end of July. • Then we will restart vacuum test with: - fresh ferrofluid, - enhanced cooling water channel, - lower water temperature, - and, improved temperature monitor.

Summary

Summary (1) Heat, Cooling, Stress Radiation trelance • Detailed simulation study of heat, cooling, stress, was done. OK (OK even for 2600 bunches) Radiation trelance • The radiation test of the ferrofluid was already done. The ferrofluid is vital against 3-year ILC operation. • The irraidation test of the whole system (motor, bearing,,,) was done. No problem was found. Central Part Prototype Vacuum Test (1) • Long term test is ongoing (from Feb. 9th). • 3-5x10-6 Pa is kept with 225 rpm rotation with 100 l/s ion pump.

Summary (2) Central Part Prototype Vacuum Test (2) • The vacuum level is the same as expected. • It is promising. • However we have concern for lifetime of the system. Gradual deterioration of vacuum quality was observed after two month of the operation. • We suspected aging of the ferrofluid. • We are going to make improvement and will restart vacuum test with: - fresh ferrofluid, - enhanced cooling water channel, - lower water temperature, - and, improved temperature monitor.