Reflecting Losses in DR within ERCOT August 22, 2012

Slides:



Advertisements
Similar presentations
T&D Losses Reflecting Losses in DR within ERCOT August 22, 2012.
Advertisements

Demand Response Commissioner Suedeen Kelly June 3, 2008.
INSULATING PRICE RESPONSIVE LOAD FROM RUC CAPACITY SHORT CHARGE Mark W. Smith J. Kay Trostle August 2008 DSWG.
Distributed Generation (DG)
Unresolved Issues in NPRR 555 Texas Steel Companies July 9, 2013.
Demand Response in New York State Northwest Power and Conservation Council DR workshop February 24, 2006.
Discuss infrastructure to support bilateral contracting between CSPs and REPs in the Retail Market Loads in SCED Sub-group May 22,
Raine Cotton  Registered DG settlement is in accordance with Protocol Section as Real-Time Energy Imbalance at a Load.
Loads in SCED v2 Subgroup The LMP-G Journey 1. TAC Endorsement of LMP-G TAC voted to endorse “LMP-G” rather than “Full LMP” as the mechanism to enable.
TPTF Presentation Registration of PUN Facilities December 19, 2007.
Market Overview in Electric Power Systems Market Structure and Operation Introduction Market Overview Market Overview in Electric Power Systems Mohammad.
© 2013 McNees Wallace & Nurick LLC October 17, 2013 Robert A. Weishaar, Jr. ON SITE ENERGY – INTERPLAY WITH PJM DEMAND RESPONSE PROGRAMS Harrisburg, PA.
ERCOT Tool to manage unexpected incremental load November 16, 2006.
Market Based Solutions for Demand Response Providers Today and the Future Alice Jackson Occidental Energy Ventures Corp.
ERS Update for DSWG June 1, Agenda June – September 2012 Procurement XML Project Update Clearing Price discussion NPRR 451 Q & A.
ERS Procurement Methodology 09/04/2013 ERS Workshop Presented By: ERCOT Staff.
July 30, 2015 TAC Meeting Update to COPS Michelle Trenary August 12, 2015.
1 Welcome to Load Participation Orientation Elev MenWomen Phones Info Presentation and other Load Participation information will be posted at:
Distributed Energy Resources Concept Document Discussion ERCOT Staff DREAM Task Force Aug. 25,
“Demand Response: Completing the Link Between Wholesale and Retail Pricing” Paul Crumrine Director, Regulatory Strategies & Services Institute for Regulatory.
ERCOT MARKET EDUCATION
PRS - RPRS Task Force Status Summary - August 14, PRS RPRS Task Force Status Summary Prepared for WMS and PRS August 2006.
Section 5.9 – added export language Each ERS Generator site must have an interconnection agreement with its TDSP prior to submitting an ERS offer and must.
ERCOT MARKET EDUCATION Retail 101. Introductions, Roles and Responsibilities.
NPRR XXX: PRR 307 Inclusion in Nodal…Part II. Questions Raised 06/26/06 Section 3 –COP (resource parameters) –CLR participation limits –Telemetry Requirements.
Grabbing Balancing Up Load (BUL) by the Horns December 2006.
ERCOT Demand Response Spring 2015 ERCOT Operator Seminar.
PJM©2013www.pjm.com Economic DR participation in energy market ERCOT April 14, 2014 Pete Langbein.
Protocol Revision Subcommittee Sandy Morris November 3, 2011.
1 Energy Storage Settlements Consistent with PUCT Project & NPRR461 ERCOT Commercial Market Operations May 8, 2012 – COPS Meeting May 9, 2012 – WMS.
1 UFE Workshop Sponsored by COPS October 19, 2004.
1 History of UFE (shortened version of presentation provided at UFE Taskforce Workshop on 9/14/2004) UFE Taskforce Meeting February 21, 2006.
This slide deck contains animations. Please open this deck in slide show mode (“View” menu, then click on “Slide Show”). To move through the animations,
ERS Update – DSWG Presentation September 21, 2012.
LMP-G Policy Issues Matrix LRISv2 Subgroup July 23 rd,
Distributed Generation Registration June 30, 2008.
ERCOT MARKET EDUCATION Retail 101. Introductions, Roles and Responsibilities.
Business Case NPRR 351 Floyd Trefny Amtec Consulting Brenda Crockett Champion Energy Services.
1 WMS Report TO TAC April 2007 (which is in March)
DSWG Update to WMS 2/9/2011. EILS Procurement Results from 1/31 Business Hours 1 HE 0900 through 1300, Monday thru Friday except ERCOT Holidays; 425 hours.
February 2, 2016 RMS Meeting 1. * Reasons: * Per the ERCOT Board Report dated 8/5/14 there were 6.6M Advanced Metering System (AMS) Electric Service Identifiers.
COPS DECEMBER 2013 UPDATE TO RMS 12/18/2013 Harika Basaran, Chair Jim Lee, Vice Chair.
Third Party DR Self-Deployment Loads in SCEDv2 Subgroup Sept. 18, 2015.
Proxy $G and other Loads in SCED 2 Litmus Tests Loads in SCEDv2 Subgroup Dec. 2, 2014.
1 Energy Storage Settlements Consistent with PUCT Project & NPRR461 ERCOT Commercial Market Operations June 27, 2012 – ETWG Meeting.
1 TAC Report to the ERCOT Board July 18, TAC Summary 4 PRRs for approval (3 unanimous) 4 PRRs for approval (3 unanimous) 5 Nodal PRRs for approval.
1 Energy Storage Settlements Consistent with PUCT Project & NPRR461 ERCOT Commercial Market Operations November 2, 2012 – RCWG Meeting.
©2003 PJM 1 Presentation to: Maryland Public Service Commission May 16, 2003.
ERCOT Market Education Market Role in Emergency Operations OTS 2016.
Smart Grid Tariff Changes
ERCOT MARKET EDUCATION
Principal Load Profiling and Modeling
Protocol Revision Subcommittee
Wind Management at MISO
Exceptional Fuel Costs in LMP
TAC Report to the ERCOT Board
NPRRs 815NPRR Revise the Limitation of Load Resources Providing Responsive Reserve (RRS) Service.  This Nodal Protocol Revision Request (NPRR) revises.
Pilot Project Concept 30-Minute Emergency Response Service (ERS)
ERS Procurement Methodology
Ancillary Service Trades and Ancillary Service Settlement
Alternative Approach for Loads in SCED v.2
Load Participation in Real-Time Market: Loads in SCED version 2
Paul Wattles, Sai Moorty ERCOT Market Design & Development
NPRR829 Incorporate Real-Time Telemetered Net Generation for Non-Modeled Generation into the Real-Time Liability Estimate ERCOT PRS Meeting May 11, 2017.
The New Texas Wholesale/Retail Market
Energy Storage Settlements Consistent with PUCT Project & NPRR461
The Future of Demand Response in New England
Demand resource emergency energy measurement and verification
Mike Mumper & Brian Kick Good afternoon
Deregulated Power, Pollution, and Game Theory
Presentation transcript:

Reflecting Losses in DR within ERCOT August 22, 2012 T&D Losses Reflecting Losses in DR within ERCOT August 22, 2012

[Metered Load * (1/(1-DLF))] * (1/(1-TLF)) Losses Introduction Loss factors are calculated on a 15 minutes basis to estimate amount of electricity lost in the transmission and distribution system TDSPs create and assign loss codes (often, although not necessarily, based upon voltage level) to ESIIDs and provide the coefficients used in the calculation of loss factors [Metered Load * (1/(1-DLF))] * (1/(1-TLF))  Unaccounted for Energy (UFE) added after losses Reflecting T & D Losses in DR 08-22-12

Losses Introduction (continued) Losses are forecasted for two days in advance with actual losses calculated the day after flow QSEs are charged but load typically pays for these losses, although the load never sees that electricity pass through it’s meter This is not about losses behind the meter, but rather describes the losses between two accepted lines of demarcation – the generation meter and the load meter Reflecting T & D Losses in DR 08-22-12

Concept The grid impact of 1 MW of metered demand response is not the same as 1 MW of additional generation 1 MW of generation satisfies something less than 1 MW of metered load as electricity due to losses Conversely, 1 MW of metered load curtailment replaces something more than 1 MW of generation as losses are avoided Reflecting T & D Losses in DR 08-22-12

Losses Illustrated Transmission Level service 1.3% to 2.6% Distribution Level service – Primary 2.0% to 11% 9.7 MWs 8.9 MWs Distribution Level service – Secondary 4.0% to 19% 8.1 MWs 30 MWs Reflecting T & D Losses in DR 08-22-12

Suggested Solution Demand Response that is offered in any ERCOT related program or market should be grossed up to reflect the applicable transmission and distribution losses that would have applied to measured curtailed volumes Reflecting T & D Losses in DR 08-22-12

More equitably compensates DR for grid impact Benefits More equitably compensates DR for grid impact Recognizes true impact on grid including reducing stress on distribution assets Volumes of offered demand response not curtailed are adjusted for losses by LSE for retail electricity billing Most beneficial for smaller customers Untapped (and needed) DR potential Utilize smart meters Inline with goals of SB1125 Reflecting T & D Losses in DR 08-22-12

Aligns ERCOT with other regions for DR reporting Benefits (continued) Aligns ERCOT with other regions for DR reporting Most other ISOs with a history of successful demand response programs incorporate this concept into their programs, including PJM, ISO-NE, and NYISO Facilitates LMP – G for Real Time Market dispatch LMP – G settlement would gross up curtailed volumes to bill customer for G; curtailed volumes should also be grossed up Should speed implementation of Loads in Real Time Market dispatch as methodologies will be defined Reflecting T & D Losses in DR 08-22-12

Items to be considered: UFE NOIE losses Impacts for LR Impacts to ALR Issues List Items to be considered: UFE NOIE losses Impacts for LR Impacts to ALR Impacts to CLR ERS Settlement calculations ERS Compliance calculations Reflecting T & D Losses in DR 08-22-12

Including UFE will foster consistency. If participating in Real Time Market, and with the LMP – G concept, an LSE would be charged for the same volume as the DR QSE would be paid Customers receiving statements would see same volumes Including UFE will increase uncertainty, making it more difficult for: Compliance Reserves procurement in SCED Budgeting Recommendation: Do not adjust for UFE Differences should be small so benefits will be limited Reflecting T & D Losses in DR 08-22-12

NOIEs are not required to provide Distribution Loss Factors to ERCOT NOIE Losses NOIEs are not required to provide Distribution Loss Factors to ERCOT Providing DLFs for use only for demand response opens potential for gaming Recommendation: All meters behind NOIE territories are grossed up for only the Transmission Loss Factors Reflecting T & D Losses in DR 08-22-12

[Metered Load * (1/(1-DLFForecasted))] * (1/(1-TLFForecasted)) Impacts for LR QSEs determine volumes to schedule based upon expected load and forecasted losses Actual loss factors not available until T+1 and therefore cannot give real time awareness Telemetry provided to ERCOT would be grossed up by the appropriate forecasted loss factors [Metered Load * (1/(1-DLFForecasted))] * (1/(1-TLFForecasted)) LR settlement is unchanged as it is based upon scheduled volumes LR compliance is unchanged since telemetry would be grossed up Reflecting T & D Losses in DR 08-22-12

Impacts for LR (continued) Should the telemetry be grossed up by ERCOT or by the QSE? Implementation at ERCOT would entail a single change vs. all QSEs making changes Implementation at QSE would ensure QSE personnel see the values used for meeting their obligations and those used for compliance If a QSE doesn’t implement, harms only that QSE and their customers Recommendation: QSEs responsible for grossing up for losses Would introduce some (likely very small) level of loss forecast risk Reflecting T & D Losses in DR 08-22-12

ERS Compliance Calculation - Alternate Contract Capacity (CC) offers could be maximized by QSEs based upon expected actual loss factors Maximum Base Load (MBL) submitted based upon metered value but grossed up for losses by ERCOT for availability and performance calculations Availability calculation to be based upon CC, grossed up metered volumes and MBL (DLF and TLF) Performance compares grossed up metered values vs. grossed up MBL Reflecting T & D Losses in DR 08-22-12

ERS Compliance Calculation - Default CC offers could be maximized by QSEs based upon expected actual loss factors Availability calculation to be based upon CC and grossed up metered volumes (actual DLF and TLF) Performance compares grossed up metered values vs. CC Reflecting T & D Losses in DR 08-22-12

ERS Compliance Calculation - Risks May increase availability risk as actual loss levels will not be known in advance Difference of submitting grossed up CC and metered MBL is a potential source of confusion QSEs that offered based upon metered volumes for consistency and to avoid confusion would reduce availability risk and not be affected for performance risk Reflecting T & D Losses in DR 08-22-12

ERS Settlements Calculation - Settlements Settlements unchanged Would continue to use the availability and performance metrics to get combined performance factor Costs allocated based upon load ratio share Reflecting T & D Losses in DR 08-22-12

Identify / resolve outstanding issues: LR ERS ALR CLR Next Steps Identify / resolve outstanding issues: LR ERS ALR CLR LR – change in Operating Guide? ERS – NPRR with small changes to compliance sections Reflecting T & D Losses in DR 08-22-12

Chair Contact Information Tim Carter 713-646-5476 tim.carter@constellation.com Reflecting T & D Losses in DR 08-22-12