BGV PIN Diodes & Trigger Updates

Slides:



Advertisements
Similar presentations
PGA309 EVM Multi-Cal-Tools-V1.6a User’s Guide
Advertisements

Linux TV Tuner - Implementation overview. Feasibility Study Business Problem The client requires a simple and cost effective solution to watch TV through.
KC705 Power Bus Monitoring
Workshop 7 of 7 Welcome!. Today's Topics Data Acquisition MAX DAQ Assistant Express VI DAQmx API Create Task Configure Task Configure Trigger Start Task.
Course contents 1.Labview basics – virtual instruments, data flow, palettes 2.Structures – for, while, case,... – editing techniques 3.Controls&Indicators.
FOLLOWER SENSORS AND ACTUATORS EE 552 INTSTRUCTOR :Dr MOHAN KRISNAN BY MOHAMMED KASHIF IQBAL ANESH BODDAPATTI UNIVERSITY OF DETROIT MERCY.
Gwynneth Davidoff, Kendall Pletcher, Mary Schmidt, Amy Whitcombe.
6/22/04 Slide 1 Hybrid Testing Status Lance Simms 6/22/04.
P07301 Summary Data Acquisition Module. Team Members.
VC707 Power Bus Reprogramming
Write a program that will automatically control the brightness of a light based on the surrounding light level. Automatic Night Light.
1 Applied Control Systems Technology. 2 Pin configuration Applied Control Systems.
Lab::VISA. VISA, GPIB, etc. Instruments can be connected in various ways: Serial port, GPIB, VXI, TCP/IP, etc. GPIB (hardware and software) –GPIB (IEEE488):
F.F. - 18/07/ User Guide of the Input Trigger Multiplexer unit with input signal rate counters.
Introduction to the Arduino
LabVIEW and MatLab E80 Teaching Team February 5, 2008.
SN DAQ for IceCube Marc Hellwig Universität Mainz IceCube DAQ Meeting, Berkeley, Expected Signal Time resolution in Simulation Artificial Deadtime.
Stave DAQ Updates. Testing two collobarative software websites Wiki 22ATLAS_Upgrade_- _Stave_DAQ%22#Code_Versions.
Electron Spectrometer Work Package Simon Jolly 19 th May 2014.
Munich, 18 Oct 2006J. Cvach, annual JRA31 JRA3 Institute of Physics ASCR Prague 1.ECAL, VFCAL (V. Vrba) 2.HCAL (J. Cvach) 3.Exchange in NA2 (travels 8.5.
Xiangming Sun1PXL Sensor and RDO review – 06/23/2010 STAR XIANGMING SUN LAWRENCE BERKELEY NATIONAL LAB Firmware and Software Architecture for PIXEL L.
Timing Requirements for Spallation Neutron Sources Timing system clock synchronized to the storage ring’s revolution frequency. –LANSCE: MHz.
Current Monitor System (1606) AJ Pikul Barath Parthasarathy Jason Stock Maya Dubrow.
BEPC II TIMING SYSTEM EPICS Seminar Presented by Ma zhenhan IHEP 20.August 2002.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
FOCOMM_CAMAC Setup and Usage Guide Andrew Wong, Larry Ruckman.
Python Dr. Maury Eggen Fall Introduction #!/usr/bin/python python is interpreted python is not strongly typed python allows multiple assignments.
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
ECE 101 Exploring Electrical Engineering Chapter 7 Data Acquisition Herbert G. Mayer, PSU Status 11/30/2015 Derived with permission from PSU Prof. Phillip.
HDB and TDB archiving at MAXlab Y.A.Gaponov, K.Larsson, P.Goryl, A.G.Persson.
A function generator is usually a piece of electronic test equipment or software used to generate different types of electrical waveforms over a wide.
Portable Power Station University of Wyoming Electrical and Computer Department EE Done By Mohammad S. Almoallem Mahmood S. Almoallem Advised.
Application Overview Main Diagnostic Logger Temperature PID Data Acquisition Current Status Exception Queue Key Measurements Exceptions.
全面推开营业税改征 增值税试点政策培训. 什么是营改增? “营改增”中的“营”指的是营业税,“ 增”指的是增值税。对大多数企业来说,增 值税所带来的税负远低于营业税。 减税本身就是积极的财政政策。营改增所 实现的减税,不仅规模大、范围广,它本质 上是一种“结构性减税”,从而构成“结构 性改革”攻坚战中的实招。
The Hacking Suite For Governmental Interception. Today’s topic: RCS installation vectors.
LabVIEW Core I with RADE introduction EN/ICE/MTA.
L1Calo DBs: Status and Plans ● Overview of L1Calo databases ● Present status ● Plans Murrough Landon 20 November 2006.
Arduino Week 3 Lab ECE 1020 Prof. Ahmadi. Objective Data acquisition (DAQ) is the process of measuring an electrical or physical phenomenon such as voltage,
Introducing the Arduino Uno Presented by Dave Mawdsley, DACS Member, Linux SIG Member (wiring, programming and running a cute traffic light simulation)
Analog Input Module - lucid-control.com
The data-logger for computers and CASIO Graphical calculators
JRA3 Institute of Physics ASCR Prague
Block 1: Introduction to R
Setup for automated measurements (parametrization) of ASD2 chip
IoT 101 with Raspberry Pi and Azure
Prototyping with Microcontrollers and Sensors
Baby-Mind SiPM Front End Electronics
Baby MIND Collaboration Meeting #2
Intro to the Arduino Created by
New LED driver Preliminary tests
Control and data acquisition system of the KTX device
Monitoring system commissioning
USB Pixel 3D System Update I-Beam Simulation
Baby-Mind SiPM Front End Electronics
Progress Updates: ICP DAS ET-7026 Communication & CryoBLM analysis
Building Raspberry Pi Controllers with Python
Programming with Arduinos and Rapsberry Pi
CYRIC beam Line (actual setup)
Baby MIND beam test status
The Linux Command Line Chapter 14
Andreas Alexopoulos BGV Meeting #98 25 / 01 / 2017
Introduction to EV3Dev: Setup with Python
Addressing Multiple Channels with DAQmx
Spectrum Sensing with Software Radios
Introducing the Arduino Uno
Security and Sound Cables from Olympic Wire & Cable Corp.
asyn Driver Tutorial Measurement Computing 1608GX-2A0
News from Micromegas modules
Arduino and Grove LET’S START.
News from Micromegas modules
Presentation transcript:

BGV PIN Diodes & Trigger Updates Andreas Alexopoulos BGV Meeting #94 16 / 11 / 2016

Andreas Alexopoulos - BGV Meeting #94 Trigger (1) 5 V/div 1300 V Before TS3 16/11/2016 Andreas Alexopoulos - BGV Meeting #94

Andreas Alexopoulos - BGV Meeting #94 Trigger (2) 1300 V After TS3 – Timing & Amplitude changes (although different beams – to be seen) 16/11/2016 Andreas Alexopoulos - BGV Meeting #94

Andreas Alexopoulos - BGV Meeting #94 Trigger (3) Amplitudes – Before TS3 1300V 16/11/2016 Andreas Alexopoulos - BGV Meeting #94

Andreas Alexopoulos - BGV Meeting #94 Trigger (4) Amplitudes – After TS3 1300V 16/11/2016 Andreas Alexopoulos - BGV Meeting #94

Andreas Alexopoulos - BGV Meeting #94 Trigger (5) Amplitudes 0.5 V/div 1300 V 1 V/div 1500 V 5 V/div 1800 V 16/11/2016 Andreas Alexopoulos - BGV Meeting #94

Andreas Alexopoulos - BGV Meeting #94 Trigger (6) Amplitudes – After TS3 1500V 16/11/2016 Andreas Alexopoulos - BGV Meeting #94

Andreas Alexopoulos - BGV Meeting #94 Trigger (7) Amplitudes – After TS3 1800V 16/11/2016 Andreas Alexopoulos - BGV Meeting #94

Andreas Alexopoulos - BGV Meeting #94 PIN Diodes Equipment used: Keithley 2410 Keithley 7001, 7076 mux GPIB-USB-HS cable Software on bgvgw linux-gpib 4.0.3 libraries installed Python installation Under ~/tools, v2.7, with Gpib module Must be used for the read-out script Script for read out bgv_diodes.py Also under ~/tools 16/11/2016 Andreas Alexopoulos - BGV Meeting #94

Andreas Alexopoulos - BGV Meeting #94 PIN Diodes Sample console output Usage and help: ~/tools/python/python27/bin/python2.7 ~/tools/bgv_diodes.py –help Automatic run: ~/bgv_diodes.sh CSV output – measurement blocks Datetime, Diode ID, Temp, X, X Voltage, Current, Resistance, Timestamp, Status (x4) 16/11/2016 Andreas Alexopoulos - BGV Meeting #94

Andreas Alexopoulos - BGV Meeting #94 PIN Diodes 16/11/2016 Andreas Alexopoulos - BGV Meeting #94

Andreas Alexopoulos - BGV Meeting #94 DAQ Attempt today Gas bgvctrl 16/11/2016 Andreas Alexopoulos - BGV Meeting #94

Andreas Alexopoulos - BGV Meeting #94 Trigger (+) Amplitudes – Before TS3 (range (-5,0)) 16/11/2016 Andreas Alexopoulos - BGV Meeting #94