Small Sites Planning & Scheduling

Slides:



Advertisements
Similar presentations
Maintenance Planning and Control : Modeling and Analysis
Advertisements

MAINTENANCE PLANNING AND SCHEDULING
Total Productive Maintenance
Outlook 2 Everything feels good now as prices are high. However...
BRYAN YOUNG Preventative Maintenance Working With Safety.
Total Productive Maintenance
Course Material Overview of Process Safety Compliance with Standards
KPI Familiarisation.
Constellation Heating and Cooling Building Automation Systems.
Workshop: Maintenance Work Requests May 3, Project Goals  Implement SAP Plant Maintenance system Provide integration with Finance, HR, and Materials.
SE429 Maintenance Planning and Control.
Productive Maintenance
All activities involved in keeping a system’s equipments working are the part of maintenances management. Maintenance of machine involves the efforts.
SE 464: Industrial Information systems Most Images and inform. used in these slides are SAP © Not to be used for other than educational purposes Systems.
Maintenance and Reliability Ross L. Fink. Maintenance  All activities involved in keeping a system’s equipment in working order.
Source One Network Solutions with Corporate Headquarters based in Fitchburg, Wisconsin specializes in providing multi- location clients, with nationwide.
Top Tactics for Maximizing GMP Compliance in Blue Mountain RAM Jake Jacanin, Regional Sales Manager September 18, 2013.
Computerised Maintenance Management Systems
BUILD WITH US. ™ Contractors
Periodic Maintenance Periodic Maintenance : The “Life Blood” Of The Service Department.
Blueprint Training Presentation: Maintenance Work Orders October 3, 2006.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 15S Maintenance.
Total Productive Maintenance (TPM)
Hazard Identification
Process Safety Management
14s-1Maintenance William J. Stevenson Operations Management 8 th edition.
MAINTENANCE STANDARDS & PLANNING
ISO OPERATIONAL CONTROL
Assessing Maintenance Effectiveness and Efficiency How is your maintenance dollar used, breakdown, inspection, improvements, demolition, operational support,
CASE STUDY EXAMPLE Work Process Flow Charts. WORK IDENTIFICATION / WORK ORDER PROCESSING Review Notification Asset Coordinator Notification complete and.
Presentation on Preventive Maintenance
Level 2 Unit 7 Applications of Maintenance Techniques in Engineering Engineering Diploma Level 2 Unit 7 Application of Maintenance Techniques in Engineering.
Hazards Identification and Risk Assessment
By: Caleb Harris.  The main purpose of QA is to monitor programs to determine their effectiveness, and if they are ineffective, to implement appropriate.
Produced by: Towards a Rational Cost Model Presenter: Tom Lenahan Tom Lenahan Limited.
Predictive Maintenance Panel International Newspaper Group 19 September 2007 Kansas City, MO Joe Bowman - ING Chairperson.
Course of Study 5. Maintenance Management Assessing Maintenance Needs
PMO2000™ 1 Improved Reliability through PM Optimisation Project Team: Electrician Planner Mechanic Operator Reliability Engineer.
Microsoft Dynamics ® NAV 2009 Service Management.
Blueprint Training Presentation: Time Entry & Equipment October 31, 2006.
 maSaIna va maok^inakla caI maaihtI. naa^ma-la va A^banaa^ma-la cyaa baosaIk kMDISana cao ivaSlaoSana.  jao.eca.maQyao [lao.maonTonansa.
Author name here for Edited books chapter 9 Facility Maintenance 9 chapter.

Ensuring the Safety of Non-Employees in the Brewery
Sources of Energy ELECTRICAL MECHANICAL PNEUMATIC FLUID AND GASES
Maintenance Scheduling
Strategy Formulation Process Workshop B
Instrument Maintenance
CORRECTIVE MAINTENANCE (REPAIRS) MANAGEMENT
SAP CS INTRODUCTION SAP Customer service is a highly integrated process module which involves a strong integration of SAP PM,SD,MM,FICO and PS. The scenarios.
IENG 451 / 452 Stability: Total Productive Maintenance
Chapter 16 Supplement Maintenance.
15S Maintenance.
Fans & Heaters technical seminar
IMPLEMENTATION OF EIGHT PILLARS THE TOTAL PRODUCTIVE MAINTENANCE AT WATER SUPPLY COMPANY Iswandi Idris Ibrahim Ruri Aditya Sari.
MAINTENANCE PLANNING AND SCHEDULING
Total Productive Maintenance and Quick Changeover
PREVENTIVE MAINTENANCE By: Mary Solomon Inyang. DEFINITIONS Preventive maintenance refers to regular, routine maintenance to help keep equipment up and.
Operations Management
Management of Change Report Errors to Management.
Publish Daily Schedule Prior to Work Execution
KPI Familiarisation
Elements of Effective Signal Maintenance
TPM Definitions Goals and Benefits Components GEOP 4316.
Operations Management
Critical Task Analysis
Operations Management
Operational DILO example
Onsite Training at JLab
Management of Change GROUP HSE RULE (CR-GR-HSE-302)
Presentation transcript:

Small Sites Planning & Scheduling

The Plan Develop Regional Strategy Review Strategy at Face-to-Face Meeting Maintenance Managers Begin Implementing Strategy Visit to Set Up Tools, Customize & Troubleshoot Establish Measures Fine Tuning

The Strategy Eight Key Elements: 1. Classification of Work 2. Maintenance/Production Organization 3. Priority System 4. Value-Adding Planning System 5. Value-Adding Scheduling System 6. Planning & Scheduling Tools 7. Measures 8. Process for Taking Advantage of Efficiencies Gained

Key Element 1: Classification of Work 1st Line 2nd Line 3rd Line Planned/ Shutdown Type of Response Quick/Direct Planned Amount of Overhead Invested None As Required Significant Level of Expertise Applied Low High None None Responsible Group Operations Maintenance Maintenance SD Team Leaks Valve Replacement Simple Tubing Examples: Critical Eqpt. Repair Adjustment Simple Tubing

OPERATIONS WORK First Line - Small/Basic Skill Key Element 1: Work Classification WORK REQUEST OPERATIONS WORK First Line - Small/Basic Skill Small Process Leaks Valve Replacement Minor Adjustment Small blinds & Spades Lubricant Addition Small threaded pipe & Tubing Operations Supervises Operators or Technicians Working Under Supervision Of Operations Do the Work EXECUTION

Key Element 1: Work Classification First Line Work REQUEST EMERGENCY WORK First Line - Large/High Skill OPERATIONS WORK First Line - Small/Basic Skill SAP Notification 1 Small Process Leaks Valve Replacement Minor Adjustment Small blinds & Spades Lubricant Addition Small threaded pipe & Tubing Critical Equipment Failure Serious Safety Hazard Environmental Hazard Production Limiting Problem Maintenance Supervises Operations Supervises SAP Job Operators or Technicians Working Under Supervision Of Operations Do the Work EXECUTION WORK ASSIGNED

Key Element 1: Work Classification Second Line Work REQUEST EMERGENCY WORK First Line - Large/High Skill ROUTINE WORK Second Line OPERATIONS WORK First Line - Small/Basic Skill SAP Notification 1 SAP Notification 2 Small Process Leaks Valve Replacement Minor Adjustment Small blinds & Spades Lubricant Addition Small threaded pipe & Tubing Critical Equipment Failure Serious Safety Hazard Environmental Hazard Production Limiting Problem Repair of Spared Equipment Preventive Maintenance Piping Repairs Modifications & Alterations Maintenance Supervises Maintenance Supervises Operations Supervises SAP Job SAP Job Operators or Technicians Working Under Supervision Of Operations Do the Work Planning Scheduling EXECUTION WORK ASSIGNED

Key Element 1: Work Classification Third Line Work REQUEST EMERGENCY WORK First Line - Large/High Skill ROUTINE WORK Second Line SHUTDOWN WORK Third Line OPERATIONS WORK First Line - Small/Basic Skill SAP Notification 1 SAP Notification 2 SAP Notification S Small Process Leaks Valve Replacement Minor Adjustment Small blinds & Spades Lubricant Addition Small threaded pipe & Tubing Critical Equipment Failure Serious Safety Hazard Environmental Hazard Production Limiting Problem Repair of Spared Equipment Preventive Maintenance Piping Repairs Modifications & Alterations Repair of Spared Equipment Preventive Maintenance Piping Repairs Modifications & Alterations Maintenance Supervises Maintenance Supervises SD Team Supervises Operations Supervises SAP Job SAP Job SAP Jobs Operators or Technicians Working Under Supervision Of Operations Do the Work Planning Scheduling Planning Scheduling EXECUTION WORK ASSIGNED

Key Element 2: Organization Operations Maintenance Shift 3 Work Requests Shift 2 Work Requests Requests from Production Managers Shift 1 Work Requests Maintenance Team Coach Emergencies Repeated Tasks (Filters, cleaning, etc.) or Maint. Shift Leader Maintenance Coordinator First Line - Maintenance Work List First Line - Operations Work List Work Assignment Operators or Operations Mechanic PM Lists Inspections/Audits Second/Third Line Work List Maintenance Planner/Scheduler Work Plans Daily Work Schedule & Permit Requirements Mechanic/Technician Permits/LOTO Procedures Operators

Key Element 3: Priority System First Line Work OPERATIONS WORK First Line - Small/Basic Skill EMERGENCY WORK First Line - Large/High Skill No Notification Notification Priority 1 Priority Set By Operations SAP Order Priority 1 Response Set By Operations Now Stop Process Leaks Investigate Compressor Knock Repair Critical Equipment not spared Repair critical level transmitter Replace small valves Hook up temporary drain lines Check Oil Levels Install brackets Install small spades/blinds

Key Element 3: Priority System Second Line Work OPERATIONS WORK First Line - Small/Basic Skill EMERGENCY WORK First Line - Large/High Skill ROUTINE WORK Second Line Notification Priority 2 No Notification Notification Priority 1 Priority Set By Operations SAP Order Priority 1 Priority A Priority B Priority C Priority D Response Set By Operations Now Tomorrow 1 Week 3 Weeks 6 Weeks Stop Process Leaks Investigate Compressor Knock Repair Critical Equipment not spared Repair critical level transmitter Non-critical Rotating Equipment Other non-critical Breakdowns Preventive Maintenance Vessel Inspection & Repair Planned Equipment Overhaul Alterations & Modifications Replace small valves Hook up temporary drain lines Check Oil Levels Install brackets Install small spades/blinds Repair critical spared equipment Unexpected Process Plugging Significant Safety Hazard Jobs with Long Delivery Materials Jobs requiring specialized Contractor skills

Key Element 3: Priority System Third Line Work OPERATIONS WORK First Line - Small/Basic Skill EMERGENCY WORK First Line - Large/High Skill ROUTINE WORK Second Line SHUTDOWN WORK Third Line Notification Priority 2 No Notification Notification Priority 1 Notification Priority S Priority Set By Operations SAP Order Priority 1 Priority A Priority B Priority C Priority D SAP Order Priority S Response Set By Operations Now Tomorrow 1 Week 3 Weeks 6 Weeks Per Shutdown Schedule Stop Process Leaks Investigate Compressor Knock Repair Critical Equipment not spared Repair critical level transmitter Non-critical Rotating Equipment Other non-critical Breakdowns Jobs Requiring Unit Shutdown Jobs Requiring Coordination with Other Units Preventive Maintenance Vessel Inspection & Repair Planned Equipment Overhaul Alterations & Modifications Replace small valves Hook up temporary drain lines Check Oil Levels Install brackets Install small spades/blinds Repair critical spared equipment Unexpected Process Plugging Significant Safety Hazard Jobs with Long Delivery Materials Jobs requiring specialized Contractor skills

Key Element 4: Value-Added Planning New Work Requests Is this work necessary? Canceled Notifications Minimize What can be done to prevent this job from occurring in the future? MOCs, Improvements What is the Work Classification? What is the Priority? How Much Planning Is Needed? Are There Long Delivery Purchases Involved? Is this a repeating job that already has a job plan? First Line Work for Maintenance Categorize Jobs with Existing Plans Simple Jobs No Parts First Line Work for Operations How many parts should be ordered in advance? What special skills and equipment are required? What extra resources are required? What safety hazards exist? What permits are required? What is the most efficient work method? Optimize

Key Element 5: Value-Added Scheduling

Key Element 6: Tools Planning Use SAP For: Notifications > Orders > History > Cost Priority, Initial Target Date, etc. Job Ticket Ordering Parts (If BOM set up with Funct. Loc. Long Text Attach to the Planning Package if Needed: Drawings Vendor Literature Repair Procedure LOTO Locations Safety Information Checksheets

Key Element 6: Tools Scheduling Use MS Project For: Weekly Schedule Daily Schedule Shutdown Schedules

Key Element 6: Tools Scheduling Weekly Schedule

Key Element 6: Tools Scheduling Daily Schedule

Key Element 7: Measures Emergency Work Done By Maintenance (As % of Total Work) Total Hours of First Line Work Done by Operations Percentage Second Line Jobs in A,B,C, and D Priorities Percentage of Plannable Jobs Planned Average Planning Audit Score Percentage of Total Hours Worked That Were Scheduled Percentage of Scheduled Hours Completed

Key Element 8: Taking Advantage What to do with the resources made free by efficiency gains? Look for ways to eliminate or minimize contractors Give experienced mechanics the opportunity to move into operations when openings occur Consider Non-Traditional technical roles such as engineering or IT

What Must YOU do? 1. Study the strategy document 2. Develop an implementation plan for your site 3. Appoint a person to serve on the team Planning & Scheduling Implementation Team 3. Help coordinate a visit to set up your tools and troubleshoot potential problems 4. Get Started! 5. Analyze Measures and Make Adjustments