International Cooperation

Slides:



Advertisements
Similar presentations
ICAO Performance Based Communication and Surveillance Workshop -- Closing Remarks Feb 2013 Paris, France.
Advertisements

Rio Conference 11 to 15 May World-wide CNS/ATM Systems Implementation CNS/ATM: A Human Centred System Captain Peter M. Foreman.
ESA Iris Programme: status
1 centre dÉtudes de la navigation aérienne COMMON METRICS FRAMEWORK FOR ATM PERFORMANCE ASSESSMENT AND MONITORING Almira Williams, CSSI Inc.
Introduction ATMCP and Performance Dominique Colin de Verdière (CENA) Bernard Miaillier (Eurocontrol) TIM9 - ATMCP-RTSP May 2002.
The EMERALD RTD Plan and the ASAS Validation Framework R P (Bill) Booth 10 October 2002.
TIM 8 and Action Plan 6 Colin Meckiff, Experimental Center Tom Proeschel, FAA Hdqtrs 30 October 2001.
PETAL A major step Towards Cooperative Air Traffic Services Patrice BEHIER Manager of the Air/ground Co operative ATS Programme Directorate Infrastructure,
Global Navigation Satellite Systems (GNSS) for Aviation United Nations International Committee on GNSS December, 2005 Ken Alexander United States.
Page 1STNApresentation of data-link activities DATA-LINK IMPLEMENTATION IN FRANCE Initial data-link services with ACARS - Departure Clearance, ATIS - CPDLC.
Federal Aviation Administration Presented By: Dennis Addison, FAA Date: February 8, 2012 SOCM-2 Seminar Data Link Operations.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-80/PIA-1 Improved Airport Operations through Airport-CDM SIP/ASBU/2012.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-40/PIA-4 Improved Safety and Efficiency through the initial application.
18-19 September 2001ATN2001 (London)1 A Commitment to ATN Implementing Aeronautical Data Link Today Presented by Kevin Wohlers ACI Program Manager.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-101/PIA-3 ACAS Improvements Workshop on preparations for ANConf/12.
Integrated information and telecommunications solutions AIRCOM Implementation VHF Digital Link Presented by Philip Clinch to ATN 2001 Conference 19 September.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-80/PIA-1 Improved Airport Operations through Airport-CDM SIP/2012/ASBU/Nairobi.
Mr. Hooper Harris FAA/JAA Annual Meeting Phoenix, AZ June 3 - 7, 2002
International Civil Aviation Organization Unmanned Aircraft Systems International Standards Progress Leslie Cary Secretary UAS Study Group Technical Officer,
International Civil Aviation Organization Remotely-Piloted Aircraft Systems Saulo Da Silva Workshop on preparations for ANConf/12 − ASBU methodology (Bangkok,
4th China & Portuguese Speaking Countries Airport Conference, Sept Luis Coimbra, President NAV Portugal The NAV Portugal global experience.
Page Lufthansa ASAS It's Time for a paradigm change... Workshop May 2003, Rome
1 EUROCAE EUROCAE Dedicated to Aviation Standardisation ASAS Standards: “From concept to equipment” David Bowen (Technical Secretary) April 24 th 2007.
3rd ASAS TN Workshop 19 April – 21 April rd ASAS TN Workshop Session 4: Strategy and Implementation Package I Requirements Focus Group (“Rapid.
- Session 4: Interoperation José M. Roca Air/Ground Cooperative ATS Programme Eurocontrol.
SVDM ConOps 18 May 2010 Federal Aviation Administration 0 0 Space Vehicle Debris Threat Management ConOps Presentation to COMSTAC Space Transportation.
Direction générale de l’Aviation civile centre d’Études de la navigation aérienne First ASAS thematic network workshop The user’s expectations and concerns.
EUROCONTROL European Organisation for the Safety of Air Navigation.
ESARR 5 and language proficiency for ATCOs European Organisation for the Safety of Air Navigation ICAO – EUROCONTROL EUROPEAN SEMINAR ON LANGUAGE PROFICIENCY.
Rio de Janeiro, Brazil 15 May 98Worldwide CNS/ATM Conference Successful CNS/ATM Project Implementation: Human Resource and Training Needs Dr. Frank T.
Flight Operations Research Centre of Excellence Dr. Hazel Courteney Head of Research & Strategic Analysis.
European Commission 1 Interoperability of Air Traffic Management systems for the Single European Sky.
PBCS Workshop May 2013, Bangkok
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
ESA Iris Programme: status
Workshop on preparations for ANConf/12 − ASBU methodology
Remotely-Piloted Aircraft Systems
Bert Ruitenberg IFATCA Human Factors Specialist
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
ICAO Performance Based Communication and Surveillance Workshop -- Closing Remarks Feb 2013 Paris, France.
A PERFORMANCE BASED GLOBAL AIR NAVIGATION SYSTEM: PART II
Global Air Navigation System ~ Planning Mechanisms ~
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
Blocks 2 & 3 Overview Samuli Vuokila Air Navigation Commissioner
World-Wide CNS/ATM Systems Implementation Conference
FANS 1/A over Iridium (FOI)
ANConf/12 – Agenda H. Sudarshan
ATSEP training - general SJCS Latvijas Gaisa Satiksme (LGS) Latvia
Future Communications Infrastructure – An update
Workshop on preparations for ANConf/12 − ASBU methodology
Session – 4: Existing ICAO Standards relating to Air Traffic Control
AFILAND FEDERAL CIVIL AVIATION REGULATIONS
The Single European Sky Implementation Programme: SESAME
Workshop on preparations for ANConf/12 − ASBU methodology
LSSIP Objective AOP05 Note: objective postponed 12 months in ESSIP Plan Edition 2015.
ANConf/12 – Agenda H. Sudarshan
Oceanic and International Operations
Standards.
Remotely-Piloted Aircraft Systems
ICAO Air Navigation Bureau
Oceanic and International Operations
ATN/GNSS Seminar Varadero, Cuba 6 to 9 May 2002 Overview of GNSS
Oceanic and International Operations
International Civil Aviation Organization
Captain Peter M. Foreman
Presentation transcript:

International Cooperation George Donohue Special Advisor to the FAA Administrator for Technology World-wide CNS/ATM Systems Implementation Conference Rio de Janeiro, 11 - 15 May 1998

FAA/ Eurocontrol R&D Cooperation Current Cooperations: Airborne Separation Air Traffic Concepts/Standards ATS Architecture Validation & Verification ATM Tools ATC Procedures Digital Telecommunications Successes: International ACAS Conference International Technical Exchanges -- Germany -- Italy -- France -- UK -- Eurocontrol FAA 456-03

Government-Industry Cooperation ICAO CNS/ATM Operational & Interoperability SARPs & GM Homogeneous ATM Areas Planning and Implementation of Operational Definition CAG RTCA SC-189 EUROCAE WG-53 Qualification Guidelines

North Atlantic RVSM

Bilateral Satellite Navigation Agreements FAA 319-02b

FAA 456-02

FAA 456-01

FAA National Satellite Testbed Tijuana/Italy Flight Test 1 1

Controller to Pilot Data Link Communications (CPDLC)

ADS/ADS-B

Flight 2000 Provide immediate safety and efficiency benefits Reduce risks for accelerated modernization Evaluate CNS transition issues Deliver certified low cost avionics

International Cooperation George Donohue Special Advisor to the FAA Administrator for Technology World-wide CNS/ATM Systems Implementation Conference Rio de Janeiro, 11 - 15 May 1998