EDR Planning, Cost Review and Technical Risk Analysis

Slides:



Advertisements
Similar presentations
CFS TIME SCHEDULE EDR - CFS Europe – Kick-Off Meetings Kick-Off Meetings, CERN, 3, 4, 5 September ILC PROJECT ENGINEERING DESIGN REPORT CFS Europe.
Advertisements

Nick Walker – GDE meeting Frascati Discussion and Approval of the BCD Nick Walker ILC-GDE Frascati –
Discussion on EUROTeV and ILC Nick Walker (DESY) EUROTeV Kick-off Meeting DESY 1 November 2004.
6-Nov-06 FALC Resource Board Global Design Effort 1 Report from the GDE Barry Barish Caltech / GDE 6-Nov-06.
BDS GDE context LC-ABD2 : WP4 - Beam Line Design 12 th April 2007, LC-ABD Plenary, RHUL Deepa Angal-Kalinin ASTeC, The Cockcroft Institute.
13-Feb-06 RDR: Goals and Scope Barry Barish Fermilab RDR Meeting 13-Feb-06 ILC Design/Cost WBS.
6-7 April 06 MAC Review Global Design Effort 1 RDR Overview Organization, Schedule, Approach and Goals Barry Barish GDE Caltech.
1 DOE Annual Review -June 15,2005 An Overview of Conventional Facilities (Civil Construction) U. S. ILC Civil studies and cost issues for Snowmass Fred.
1-Dec-06 HEPAP Univ. Subpanel Global Design Effort 1 ILC Report Barry Barish Caltech / GDE 1-Dec-06 RDR Design Freeze.
Review of last year: Global Design Effort Barry Barish ILC Consultations URA, Washington DC 12-May-05.
5Feb07 Beijing GDE meeting 1 S2 Task Force Status (String test definition) Tom Himel.
Global Design Effort BDS KOM Opening remarks/comments from EDR Project Management SLAC Marc Ross / Nick Walker.
Albrecht Wagner, Report from ICFA, ICHEP 2006 Report from ICFA 1.ICFA mission and membership 2.ICFA Panels 3.ICFA Activities 4.ILCSC and its mandate 5.Funding.
Global Design Effort Americas Region Efforts and Resources Mike Harrison GDE.
Nick Walker, Brian Foster LAL, Orsay WP2: Coordination with the GDE.
LCFOA Meeting at SLAC Linear Collider Forum of the Americas 1 LINEAR COLLIDER FORUM OF THE AMERICAS CONVENTIONAL FACILITIES OVERVIEW Victor R. Kuchler.
International Linear Collider The ILC is the worldwide consensus for the next major new facility. One year ago, the choice was made between the two alternate.
HLRF DRAFT Global Design Effort 1 Defining EDR* Work Packages [Engineering Design Report] Ray Larsen SLAC ILC Division for HLRF Team DRAFT April.
Global Design Effort ILC: From RDR to EDR or “How to Spend the Money” Nick Walker GDE.
W. Namkung, 3 nd ILC Workshop, April 1, ILCSC Update 3rd ILC-Korea Workshop April 1, 2005 Kunkook University Seoul, Korea Won Namkung PAL/POSTECH,
8 May 06 ILCSC Report Global Design Effort 1 GDE R&D Program RDR Status and Plans Barry Barish GDE Caltech.
02/06/07 DESY LCWS Global Design Effort – EDR Planning – M. Ross 1 Report back from GDE EDR Planning: ILC 2007 Closing Plenary Marc Ross Fermilab.
Date Event Global Design Effort 1 ILC Engineering Design Phase - Status & Plans Mike Harrison GDE/BNL.
EUROTeV and the ILC Global Context Nick Walker (DESY) EUROTeV Annual Meeting INFN Frascati 24 January 2008.
Report from ILCSC Shin-ichi Kurokawa Former ILCSC Chair KEK November 4, 2007 CCAST ILC Workshop IHEP, Beijing, China.
Global Design Effort Accelerator System Kick-off Meeting e- source SLAC Marc Ross.
Status of the International Linear Collider and Importance of Industrialization B Barish Fermilab 21-Sept-05.
AS TAG Leaders Meeting PM Report. Topics R&D Plan release 4 ADI WebEx meetings (cost and design) Central region integration face-to-face meetings.
1 Global Design Effort: Controls & LLRF Controls & LLRF Working Group: Tuesday Session (29 May 07) John Carwardine Kay Rehlich.
Introduction and Charge Barry Barish GDE Meeting Frascati 7-Dec-05.
Atsuto Suzuki (KEK), Chair ICFA Report from ICFA ICFA mission and membershipICFA PanelICFA Activity.
22 September 2006 Global Design Effort 1 The Global R&D Board Status Bill Willis GDE Columbia University.
SCRF Cavity WebEx Meeting May 17, 2010 Reports from PM (10 min.) – Brief report from ILC-PAC – Industrialization workshop as IPAC satellite meeting, Kyoto,
DRWS07 KEK Global Design Effort ILC Damping Rings Mini-Workshop December, 2007 High Energy Accelerator Research Organization KEK,
Global Design Effort: Controls & LLRF Americas Region Team WBS x.2 Global Systems Program Overview for FY08/09.
Tor Raubenheimer KEK Mtg Goals KEK January 19 th, 2006.
Goals of the ILC-Asia Meeting at Pohang Fumihiko Takasaki PAL, Feb. 17, 2006.
April 2006 F. Richard LAL/Orsay 1 News from ELAN SC of CARE Paris April 2006.
Top-Level Change Control (TLCC) Process by which specific themes from SB2009 will be developed and refined –Extension of established AD&I process Formal.
ILC 2007 Global Design Effort 1 Planning Damping Rings Activities in the Engineering Design Phase Andy Wolski Cockcroft Institute/University of Liverpool.
January 9, 2006 Margaret Votava 1 ILC – NI/FNAL/ANL Brief overview of Global Design Effort (GDE) plans, dates, and organization: –Changes since Industrial.
CFS / Global – 09 June, 2010 PM Report: SB2009: –4 two-day workshops form the core of ‘TOP LEVEL CHANGE CONTROL’ –  as advised by AAP, PAC and etc –Written.
Main Linac Technology (MLT) Meeting To be held through WebEx July 13, 2007.
Global Design Effort RTML KOM Close-out Ross, Walker.
Global Design Effort Close-Out Points EDR time-scale (2010) –No demonstrations to ILC-like RF unit –3(?) CMs constructed at FNAL – not RDR baseline –2(?)
Global Design Effort Controls LLRF EDR Kick Off Meeting View from the Project Management Office Fermilab / ANL August 20, 2007.
1 AS TAG Leaders Meeting Webex - Friday S. Guiducci, M. Palmer.
19Jul06 Vancouver GDE meeting 1 S2 Task Force Status (String test definition) Tom Himel.
Global design effort Americas 1 FY08-09 ILC-Americas planning G. Dugan ILC-Americas Planning meeting SLAC Sept. 13, 2006.
PM Report CFS /Gbl ILC PAC (19-20 May) Agenda: –Akira, Rongli, Hitoshi H, Marc, Nick, Toshiaki, Mark P., Peter G. –Nick will report on Design.
July 11, 2008M Ross for PM - ILC GDE - ILCDR08 closeout 1 GDE Program for the ILC Technical Design Phase Marc Ross for: Akira Yamamoto, Nick Walker GDE.
Project Management: Nick Walker Akira Yamamoto Marc Ross
Oct 22 Group Leaders Planning meeting
LCWS11 AWG9 PARALLEL SESSION SUMMARY
ILC Project Management Status
ILC ‘Engineering Design’ (ED) Phase
Global System Kick-off Meeting
Report on plan to produce an Engineering Design Report
ILC-EDR Kick-off Meeting, Cryomodule and Cryogenics
ICFA Report to ICHEP 2016 August 2015 to August 2016 J. Mnich (DESY)
ILC PROJECT ENGINEERING DESIGN REPORT CFS Europe – KICK OFF MEETING
Conventional Facilities and Siting Global Group (CFS) SLAC Update December 10, 2007 Acknowledgment: Jerry Aarons, Clay Corvin, and Esther Kweon Fred Asiri.
Technical Design Report preparation
Report from ICFA ICFA mission and membership ICFA Panels ICFA and ILC
, A. Yamamoto SCRF WebEx Meeting.
ILC Global Design Effort
Barry Barish GDE Caltech
Yasuhiro Okada, Executive Director, KEK
The S0S1 Taskforce: an Example of the Complexity for the ILC R&D Environment Lutz Lilje DESY Beijing ILC Workshop Global Design Effort.
Session Introduction & Damping Rings Baseline Lattice Decision
Presentation transcript:

EDR Planning, Cost Review and Technical Risk Analysis A status report Nick Walker ILC@DESY Project Meeting 11.05.2005 Global Design Effort

Content Status of EDR Planning Goals and Programme for Orsay RDR International Cost Review (23-25th May) Technical Risk Assessment Global Design Effort

EDR Planning Update Project Manager ‘negotiations’ continue But we are very close GDE structure being revised Work Package structure Definition of high-level milestones during EDR phase (including R&D milestones defined by S0,1,2…) Task force evaluating WP and management structures Global Design Effort

EDR Planning Task Force Will report at LCWS/ILC2007 Membership: Bob Kephart FNAL Lutz Lilje DESY Hitoshi Hayano KEK Ewan Paterson SLAC Marc Ross FNAL chair Nobu Toge KEK (European #2) ?? still missing!! + GDE EC Barish, Foster, Harrison, Nozaki, Raubenheimer, Walker, Yokoya Global Design Effort

EDR Planning: Process For EDR Phase, need to define: High-level goals and milestones Work packages Responsible groups (people!) Management structure Gain input from community Critical: RDR Area, Technical and Global System leaders. R&D groups (RDB, S0,1,2… etc) Laboratories, institutes, Universities etc. Getting the input: Ross has canvas input via email Weekly EDR planning TF meetings (WebEx) Lab/institute visits (SLAC, FNAL, DESY, KEK, Cockcroft…) Important goals for Workshop Global Design Effort

LCWS/ILC2007 Goals review current status of global ILC R&D and future plans, including GDE Global R&D Board recommendations, for both the baseline configuration as well as the supported alternative designs; review and plan activities in and around Test Facilities (both existing and proposed); identify and prioritise critical engineering milestones for EDR phase (cost driven), which are consistent and integrated with the critical R&D milestones; promote and improve collaboration between groups working on ILC related R&D: To encourage a broader participation from active groups around the world; To attract new researchers to the field; define the scope of the EDR and consolidate EDR planning: Review general project structure and possible ‘Work Package’ (WP) structures; Refine proposed schedule, milestones, deliverables etc.; Begin process of WP allocation. Global Design Effort

LCWS/ILC2007 Goals EDR planning relevant review current status of global ILC R&D and future plans, including GDE Global R&D Board recommendations, for both the baseline configuration as well as the supported alternative designs; review and plan activities in and around Test Facilities (both existing and proposed); identify and prioritise critical engineering milestones for EDR phase (cost driven), which are consistent and integrated with the critical R&D milestones; promote and improve collaboration between groups working on ILC related R&D: To encourage a broader participation from active groups around the world; To attract new researchers to the field; define the scope of the EDR and consolidate EDR planning: Review general project structure and possible ‘Work Package’ (WP) structures; Refine proposed schedule, milestones, deliverables etc.; Begin process of WP allocation. Global Design Effort

Orsay Cost Review Last critical milestone for RDR process “The RDR is dead – long live the EDR!” International Committee put together by Funding Agencies for Large Colliders (FALC) ILC Steering Committee (ILCSC) Single ‘international’ review initiated/requested by GDE We wrote the charge We set the programme Global Design Effort

Membership Sergio Bertolucci (Frascati) Sergio.Bertolucci@lnf.infn.it Jia-er Chen (Peking University) chenje@pku.edu.cn Mark de Jong (Canadian Light Source) Mark.deJong@lightsource.ca Lyn Evans (CERN) Lyn.Evans@cern.ch (Chair) Norbert Holtkamp (ITER) norbert.holtkamp@iter.org S. S. Kapoor (BARC) kss@barc.gov.in G. S. Lee (National Fusion Research Center, Korea) gslee@nfrc.re.kr Vera Luth (SLAC) luth@slac.stanford.edu Norihiko Ozaki (Institute for Techno-Economics, Japan) ozaki@techno-economics.com Lucio Rossi (CERN) Lucio.Rossi@cern.ch Ed Temple (Fermilab) etemple@fnal.gov Dieter Trines (DESY) Dieter.Trines@desy.de Toshihide Tsunematsu (JAEA, Japan) tsunematsu.toshihide@jaea.go.jp Ex-officio Shin-ichi Kurokawa (KEK) shin-ichi.kurokawa@kek.jp Ferdinand Willeke (DESY) ferdinand.willeke@desy.de Secretary Roy Rubinstein (Fermilab) royr@fnal.gov Global Design Effort

Charge to IRC Global Design Effort

Charge to ICR review cost trends and relative costs of sub-systems. Comment on their relevance to potential changes to be incorporated into the EDR, and to the R&D program in support of the EDR. Global Design Effort

Programme Day 1 Global Design Effort

Programme Day 2 Two ‘breakout’ parallel sessions AM Main linac and associated systems (Cavities, Cryomodules, RF power, gradient choice etc.) Management and Planning #1 (Detail of manpower estimates; methodology; uncertainty in value estimate) PM CF&S, DR, BDS Management and Planning #2 R&D plans Technical risk assessment Plans & Engineering design Global Design Effort

Technical Risk Assessment Current Value estimate is based on assumptions that key R&D and engineering programmes will be successful: accelerating gradient (shorter linac) electron cloud (single e+ ring) If one or more of this critical R&D/engineering fail, what is the risk (cost impact) Very closely related to RDBs S0,1,2… work R&D priority list is a subset of Technical Risk assessment Global Design Effort

EXCEL tool (E.Paterson) Global Design Effort

DEFINITIONS These are part of the Excel Package Global Design Effort

Definitions and Color Codes Global Design Effort

RESULT of Top Ten SORT Global Design Effort

Initial Conclusion from TRA We have a relatively conservative machine No ‘high-risk’ items that are not expected to be mitigated during EDR phase (warning: new problems may appear!) riskcost factors typically few % TPC Not tens of % or factors of 2!! Useful tool which we will continue to develop Global Design Effort