Lean Apartment Construction Workshop

Slides:



Advertisements
Similar presentations
Lean Apartment Construction Workshop
Advertisements

Development of Information Systems. “Design is a funny word. Some people think design means how it looks. But of course, if you dig deeper, it's really.
American Greetings: New Beginning Team AI: Will Cheesman- Innovation and Creativity Nakul Rajaram- Project Management Andrew Schuch- Technical Contributions.
© The McGraw-Hill Companies, Inc., 1998 Irwin/McGraw-Hill Module 11 Operations Scheduling Chapter 16 (pp ) Work Center and definitions  Objectives.
Theory of Constraints Part II: TOC Concepts
Quality Programs ProgramSix Sigma Jack Welch, GE Lean Thinking Womack & Jones Theory of Constraints Ely Goldratt TheoryReduce VariationRemove WasteManage.
MBA 8452 Systems and Operations Management
Go with the flow! Boost the power and data flow of your health plan administration software with UEP. Synergy Computer Solutions, Inc. Confidential – Copyright.
Healthcare Operations Management © 2008 Health Administration Press. All rights reserved. 1.
FPGA Design Flow Design Circuit Simulation Implementation Programming.
P10457: D-R Process Improvement Compressor Assembly Area Patrick Muldoon Introductions and Welcoming Comments.
Scheduling. Characteristics of a “job” Constituent operations Constituent operations Due date Due date Time of arrival in shop Time of arrival in shop.
CS 311 – Lecture 23 Outline Kernel – Process subsystem Process scheduling Scheduling algorithms User mode and kernel mode Lecture 231CS Operating.
Information Systems Development Lecture 2: the idea of the Life Cycle.
Dr. David Janzen Software Engineering 1 Monday, July 11, 2011.
Restaurant Dining System Donald Kaulukukui. Introduction ► Team manager = ME ► Secretary = ME ► President = ME ► R & D = ME ► Tester = ME.
Discover how to improve productivity by going DevOps and SAFe.
electronic Value Stream Mapping
Little´s law Skorkovský ,KPH,ESF.MU
Project Status Update P09457 – Process Improvement Project Eric MacCormack (IE) Colin Roy (IE)
Material Handling. Materials Handling Materials handling is a non-value activity that your customer is unwilling to pay for. Constantly question material.
Real Estate Markets Introduction. Real Estate Markets: Economic Determinants of New Construction.
Irwin/McGraw-Hill 1 Process Analysis Terms Process: Is any part of an organization that takes inputs and transforms them into outputs. Cycle Time: Is the.
Location of risk in the supply chain
F-1 Applying Lean to Factory Homebuilding Dr. Mike Mullens, PE.
Why Kanban Systems Fail and What You Can Do About it
JUST IN TIME Operational Systems for Manufacturing… JIT and Lean Production.
Tactical logistics management and supply chain integration
Managerial Accounting: Overview Chapter One  FINANCIALMANAGERIAL  OutsideInside  Follow GAAP/IFRSTimely and Relevant  Standard Report FormatReports.
Test Management Under construction – What happens? Maria Månsson.
Dr. Joan Burtner1 Introduction to the Lean Enterprise as a Quality Improvement Initiative Presented By: Dr. Joan A. Burtner Industrial and Systems Engineering.
A High Throughput Computing Analysis of Rounding in the Beer Distribution Game Nathan Patterson Dr. Jeffrey Rhoads Dr. Sangtae Kim
Freeleansite.com Kaizen (What is it ?) Lean Foundations Continuous Improvement Training Lean Foundations Continuous Improvement Training.
Quality and Productivity Lab ENGR Q&P in the Real World Many industries use assembly lines to speed up production, reduce costs, and improve safety.
Developed by:.  What is it?  Approaches  Processes  Objectives of PM  Conclusion.
Penny Fab WIP=1.
1 Lean Manufacturing Sankar Sengupta & Robert Van Til Industrial & Systems Engineering Dept. Oakland University Rochester, MI (248)
5S and Visual We consider 5S and Visual Controls to be the foundation of Lean Manufacturing systems. 5S and Visual Controls are workplace organizational.
Activity Scheduling and Control
DP Johnson, 2005 Dealing with Production Bottlenecks Mini-case Be Sure To Review Notes Area And Related Word Document Forward to Instructors.
Copyright © 2012 Accenture All Rights Reserved.Copyright © 2012 Accenture All Rights Reserved. Accenture, its logo, and High Performance Delivered are.
Evan Leybourn STARTING WITH VSM & KANBAN A practical workshop on value stream mapping & WIP Starting with Value Stream Mapping and Kanban by Evan Leybourn.
Lean Software Management: BBC Worldwide Case Study EECS811: IT Project Management Case Study Cody Mock February 8, 2016.
1 Luis Ernesto BLANCO RIVERO "SIMULATION AS A TOOL FOR UNDERSTANDING MANUFACTURING" Information flow Manufacturing Operation As A Single System OPERATION.
Paper Planes Paper Aeroplane Simulation. Session Outline Setup a factory to make paper aeroplanes Run the factory and record performance data Analyse.
Georgijs Buklovskis Member of the Board Association for Business Efficiency, Latvia Plant manager Brabantia Latvia Ltd. BMDA conference, Rīga, May, 8th,
SMME Where science is converted into technology Prospective target research areas for Process Improvements in the Textile and affiliated Industry by Dr.
Value Stream Mapping October 2016.
OPS 571 help / ops571helpdotcom
Lean Manufacturing Series
Analytical Tools for Process Analysis and Improvement
Location of risk in the supply chain
Real Metrics for Real Decisions
The two alternative approaches
Games and Simulations in Assessment
An introduction to lean in construction Victoria Shaw Stephen Greenhalgh Both.
TFP401A-Q1 AC-Timing - Block Diagram - RGB Receive-IC AC Specification
A Manufacturing System
ERPsim4HANA Business Experience Manufacturing - Intro Simulation
ERPsim4HANA Business Experience Distribution Simulation
Continuous Improvement”
Lab #1: TimeWise Simulation Round 1
Round 1 Debrief - PM What worked? What didn’t work?
ERPsim4HANA Business Experience Manufacturing - Short Simulation
Value Stream Mapping October 2016.
Contemporary Issues in Industrial and Management Engineering
Goldratt Research Labs
Process Analysis “If you cannot describe what you are doing as a process, you do not know what you are doing.” W.E. Deming.
Bellemont Fire Station Addition
Theory of Constraints Part II: TOC Concepts
Presentation transcript:

Lean Apartment Construction Workshop LEAPCON Lean Apartment Construction Workshop

Apartment Construction 22 פברואר, 2006 בנייה רזה Apartment Construction Drywall Ceilings HVAC Flooring Design Changes (c) 2006 Dr. Rafael Sacks, Technion

Simulation setup 2 3 4 5 6 7 8 Building floors and apartments 22 פברואר, 2006 בנייה רזה Simulation setup Material Store Building floors and apartments Crane Client Rep 1 3 2 4 5 7 6 8 2 9 11 10 12 3 13 15 14 16 4 17 19 18 20 5 21 23 22 24 6 25 27 26 28 7 29 31 30 32 8 HVAC team Drywall team Flooring team Quality Control Ceiling team Project Manager Design Changes Client Changes Rep Client (c) 2006 Dr. Rafael Sacks, Technion

Production Plan (Gantt Chart) 22 פברואר, 2006 בנייה רזה Production Plan (Gantt Chart) (c) 2006 Dr. Rafael Sacks, Technion

Results for 2 groups Round Completed (units) 22 פברואר, 2006 בנייה רזה Results for 2 groups Round Completed (units) Defective apartments (units) Time to first apartment with changes (min.) W.I.P. (units) Throughput (units/min.) Cash flow ($) Cycle time (min.) Conventional (1) (2) (3) Lean (4) (5) (c) 2006 Dr. Rafael Sacks, Technion

Discussion between rounds: Difficulties with the system 22 פברואר, 2006 בנייה רזה Discussion between rounds: Difficulties with the system Management Team: What did you feel during the game? Were you busy? Did you manage to implement your plan? Were you in control? Drywall team: Were you busy? HVAC team Bottleneck, Cycle time, WIP, Push What is the meaning of cycle time for apartment construction in real projects? How would you improve the process? (c) 2006 Dr. Rafael Sacks, Technion

Discussion after the second round 22 פברואר, 2006 Discussion after the second round בנייה רזה Management Team: What did you feel during the game? Were you busy? Did you manage to implement your plan? Were you in control? Drywall team: Were you busy? Was your productivity improved? HVAC team Bottleneck, Cycle time, WIP, Push What is the meaning of cycle time for apartment construction in real projects? How would you improve the process? (c) 2006 Dr. Rafael Sacks, Technion

LEAPCON – typical results 22 פברואר, 2006 LEAPCON – typical results בנייה רזה (c) 2006 Dr. Rafael Sacks, Technion

LEAPCON - Cash Flows LEAPCON Simulation F: Lean 03:38 LEAPCON - Cash Flows $(20,000) $(15,000) $(10,000) $(5,000) $0 $5,000 $10,000 $15,000 $20,000 0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00 20.00 22.00 24.00 Simulation Time (min.sec) Cash Flow F': Lean, no customization F: Lean A': Conventional, no customization A: Conventional LEAPCON Simulation www.technion.ac.il/~cvsacks/tech-leap.htm

LEAPCON Users around the world 03:38

Background Reading “The Goal” Eli Goldratt www.leanconstruction.org 03:38 Background Reading “The Goal” Eli Goldratt www.leanconstruction.org “Lean Thinking” Womack and Jones www.iglc.net “The Critical Chain” Eli Goldratt “Factory Physics” Hopp and Spearman Sacks, R., Esquenazi, A., and Goldin, M., (2007). ‘LEAPCON: Simulation of Lean Construction of High-rise Apartment Buildings’, Journal of Construction Engineering and Management, Vol. 133 No. 7 pp. 529-539.