An alternative approach…..

Slides:



Advertisements
Similar presentations
UK Gas Entry Regime – Review of existing Interruptible Arrangements & Potential Reforms for this Winter.
Advertisements

Commercial Arrangements For Gas Quality Service – Process UNC Transmission Workstream 23 rd April 2007.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Long Term Entry Capacity & User Commitment Transmission Workstream 7 th August 2008.
Sunday, 04 October 2015 UNC Mod Action WG0505: Provide for discussion/development the potential categories of connection offer and associated timescales.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Quote + SP Energy Networks are keen to improve the service we provide to our Customers. Quote + has been developed to provide our Customers with a higher.
PARCA: Contractual Overview TX Workgroup 27 th February 2013 Steve Pownall.
Capacity Release Processes and Investment Planning Transmission Planning Code Workshop 2 1 st May 2008.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Mod 214 – Reservation of firm NTS Exit Capacity at new NTS Exit Points in the transitional period Steve Rose.
Discretionary Release of Non Obligated NTS System Entry Capacity Transmission Workstream 1st May 2008.
Delivering Connections and Capacity RIIO-T1 and associated commercial changes - Summary June 7th 2012.
WEC MADRID 18 TH MARCH 2004 ASTRAZENECA’S APPROACH TO SUPPLIER RISK MANAGEMENT.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
© Energy UK April 2012 Transmission Workgroup – 4 th April Financial Commitment for Incremental Capacity Presentation by Energy UK
Mod 166 Review Group Incremental Exit Capacity at New and Existing Exit Points.
Exit Capacity Substitution and Revision Transmission Workstream meeting, 3 rd December 2009.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Entry Capacity Trading Transmission Work Stream, 5 April 2007.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Facilitating Release of Non-obligated Entry Capacity Draft – for discussion purposes only 22 November 2007.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Exit Capacity Release Methodology Statement - ExCR Transmission Workstream – 5 th Feb 2009.
PARCA Demonstration Data Information Flow Diagram Footnote:- No set timescales – timescales will be agreed by the Project Team Phase 0 Phase 1 Phase 2.
Mod 376: Increased Choice when Applying for Enduring NTS Exit Capacity Jeff Chandler - 5 th May 2011 Transmission Workgroup - Elexon 1.
NTS Exit Regime Transmission Workstream – 6 th July 2005.
Transmission Workstream 6 January 2011
Interactions with the implementation of RIIO-T1
Transitional Exit Capacity Proposals -Update
Exit Capacity Release Methodology Statement
Entry Capacity Overrun price calculation
Capacity Conversion – 616s
EU Implementation Programme
Request for Proposal (RFP)
Transmission Workstream, 6 August
Principles of Project Management Case Study - Programme Management: Developing a Blueprint Graham Collins University College London (UCL)
UNC Modification Proposal 0373
GTAC Workshop Block 5 19 September 2018.
Proposer: BP Gas Marketing Ltd Panel Date: 17 April 2014
Capacity Methodology Statements: Impact of Mod 452
NTS Entry Charging Review Update
Developing capacity & connection processes: A long term non firm capacity product? 27th June 2012.
2019 Release Planning Options inc Modification 0621 / GB Charging Project DSC Change Management Committee update July 2018.
Mod 0452 (PARCA) – Further thoughts
PARCA Security and Termination Amounts
CSS Update for CoMC 19th September 2018
Exit Capacity Substitution and Revision
UNC 0621L: Amendments to Gas Transmission Charging Regime
Strategic Environmental Assessment (SEA)
Transmission Workgroup June 7th 2012
Draft Capacity & Connection Plan
0350 – Combining the NTS entry capacity and exit capacity credit checks Chris Shanley.
Connection Offer Expenses – our approach
Transmission Workgroup 6th March 2014
Review Group 166 End User Perspectives 20 September 2007 Julie Cox.
QSEC auction timetable
Long Term Non Firm Capacity Update
Transmission Workstream – Partial Assignment
Review Group /09/2007.
Proposed Transitional Gas Exit Arrangements
UNC 0621L: Amendments to Gas Transmission Charging Regime
CUSC “Alternate” Proposal process
Transmission Workstream – 6th July 2005
CAM: Next Steps UNC Transmission Workgroup Lisa Martin 9 January 2014.
Proposer: Steve Mulinganie, Gazprom Energy Panel Date: 20th June 2019
Presentation transcript:

An alternative approach….. We could widen the ‘ARCA’ (advanced reservation of capacity) principles currently applicable to non-UNC parties in exit The high level principle would be that capacity is reserved following the signature of a bi-lateral contract whilst planning activities are undertaken The ‘demonstration date’ concept would be retained, whereby the contract can be terminated and the capacity no longer reserved if the project does not progress Formal user commitment would be made at a defined point following receipt of a Development Consent Order 1

Planning and Advanced Reservation of Capacity Agreement (PARCA) Our alternative approach utilises a bi-lateral contract which incorporates the principles of the existing PCA and ARCA contracts Signature of the contract would not be mandatory to signal incremental capacity – but provides certainty of overall timeline for both parties and is likely to lead to a more efficient timeline overall because of this Planning and Advanced Reservation of Capacity Agreement Pre-Capacity Agreement 1a – need case and technical options 1b – strategic options 2 – Preferred route corridor 3 – Environmental Impact Assessment Advanced Reservation of Capacity Agreement Capacity reserved from signature Demonstration dates and information Termination where project doesn’t progress 2

How it could work Part 1a of the PCA works takes around 6 months to complete and identifies whether there is existing capability in the system and therefore whether the rest of the PCA activities (1b to 3) are required If there is no existing capability in the system then a PARCA contract could be used to: Underpin the work needed to investigate build and non build options to provide that capacity Reserve capacity whilst these activities are undertaken Provide ‘drop out’ points which allows the customer to terminate and capacity to be returned to market if they decide not to progress their project Could be utilised in conjunction with (or used to facilitate) ‘stop-gap’ long term non-firm product 3

Kick off PARCA anytime here Interaction with Mod 373 The initial part 1a work could be carried out in parallel or sequentially with the Mod 373 timeline It would be the customer’s choice of when to start the 1a phase, but we believe there is an ‘optimal’ point This optimal point ensures that the customer receives a connection offer and need case/technical options report to consider together Day 0 3 months 9 months 12 months 15 months Connection Application Simple Provide Offer Accept Kick off PARCA anytime here Mod 373 Connex Process Optimal PARCA signature date 6 months Conceptual Design Study Feasibility Study Conceptual Design Study Complex Connection 4

Further development required… We have been looking at this option as a result of the feedback that the ‘split auction’ approach is potentially too complex Our thinking is therefore not as far developed as the split auction option There are a number of questions to be discussed for example: Should this allow reservation of unsold only (where no incremental required)? Is an ‘open season’ approach required to let market know when a PARCA is about to be signed? Interaction with Europe? But in general, we believe this option has merit 5

Way forward Monthly workgroup as part of Transmission workgroup propose to begin on 5th of July – initially cover outstanding actions Is monthly sufficient? A lot of material to cover so which areas to focus on first?