Additional line balancing notes

Slides:



Advertisements
Similar presentations
1 Slide Process Analysis Fundamentals MGT Slide Process Definition  A process is a collection of operations connected by a flow of transactions.
Advertisements

PROJECT MANAGEMENT CPM/PERT V P B Chakravarthi. K Abhijeet Kumar.
Having Fun with Gantt PERT &.
PERT / CPM PERTProgram Evaluation & Review Technique CPMCritical Path Method.
Tutorial 2 Project Management Activity Charts (PERT Charts)
1 PERT Chart for Nekretnine Macronet [2012.] T E = 5 T E = 11 T E = 12 T E = 14 T E = 20 T E = 19 T E = 22 T E = 23.
MGMT 483 Week 8 Scheduling.
Project Management OPER 576 Project Networks Greg Magnan, Ph.D. April 29, 2004.
DAVIS AQUILANO CHASE PowerPoint Presentation by Charlie Cook F O U R T H E D I T I O N Facility Decisions: Layouts © The McGraw-Hill Companies, Inc., 2003.
OPERATIONS MANAGEMENT INTEGRATING MANUFACTURING AND SERVICES FIFTH EDITION Mark M. Davis Janelle Heineke Copyright ©2005, The McGraw-Hill Companies, Inc.
Copyright 2012 John Wiley & Sons, Inc. Chapter 8 Scheduling.
1 IRWIN  a Times Mirror Higher Education Group, Inc. company, 1996 Facilities Layout.
Facility Layout Facility Layout Facility Layout decisions translate the broader decisions about a firm’s strategy such as competitive priorities, process,
Chapter 10 – Facility Layout
AB EH C D F G I 10 Min Example Balance for 3 units/hour and compute theoretical min number of stations (primary: longest task time; secondary:
COMSOAL Computer Method for Sequencing Operations for Assembly Lines Lindsay McClintock OPERMGT 345 – 004 May 6, 2003.
Operations Management Layout Strategy
1 A Fundamental Principle of TPS Produce to Demand 1.Make only what is needed when it is needed. 2.Base production and planning on Takt Time. 3.Develop.
Chapter 8 Scheduling © 2012 John Wiley & Sons Inc.
1.Pareto Analysis 2.Fish Diagram 3.Gantt Chart 4.PERT Diagram 5.Job/Worksite Analysis Guide.
Line Balancing Problem
Network Analysis Terminology
Assembly Line Balancing
Assembly Line Balancing
Chapter 8 Scheduling © 2012 John Wiley & Sons Inc.
Project Management Chapter 16. MGMT 326 Foundations of Operations Introduction Strategy Managing Projects Quality Assurance Facilities Products & Processes.
Line Balancing. Example problem - Golf Club mfg/assy firm Customer demand requires production volume of 24 finished clubs in an 8 hour shift Customer.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
Assembly Line Balancing Introduction to Industrial Engineering.
Assembly Line Balancing
1 Lean Office – Layout & Cells
Project Management (1) Chapter 16, Part 1. Overview of Management 326 Operations and Operations Strategy Products, Processes, & Quality Operations Planning.
PROGRAM DEVELOPMENT CYCLE. Problem Statement: Problem Statement help diagnose the situation so that your focus is on the problem, helpful tools at this.
Assembly Line Balancing Boeing Corporation
PERT/CPM Chart David Nandigam 1. 2 PERT/CPM Chart Task. A project has been defined to contain the following list of activities along with their required.
© The McGraw-Hill Companies, Inc., Technical Note 5 Facility Layout.
Slide 0 of 96 Manufacturing Facility Layout. Slide 1 of 96 Basic Layout Forms Process Product Cellular Fixed position Hybrid.
Lecture 61 Project planning tool Lecture 62 Objectives Understand the reasons why projects sometimes fail Describe the different scheduling tools, including.
Developing a Project Plan
Project Management Concepts Gantt Chart – shows tasks as bars whose length indicates timing. PERT* chart (Network Diagram) – shows relationships between.
Chapter 6 - Probability Math 22 Introductory Statistics.
Unit 2 Time Management Prepared by: Prof. Seemaah Keddar.
PERT Gantt WBS.
Revision BUSI 2301 B. Averaging methods b). Moving average - sample problem Compute a three-period moving average forecast for period 6, given the demand.
IE 366 Chapter 9 Organization of Workstations Supplementary Material from: Groover, M.P. (2007). Work Systems and the Methods, Measurement, and Management.
Managing the Information Systems Project Cont’d
Supply Chain Customer Order Decoupling Point
PROJECT MANAGEMENT.
UNIT II Scheduling Procedures & Techniques FLOAT
Perancangan Sistem Manufaktur
deterministic Fixed and known in advance, representing a
Project Scheduling Lecture # 1.
1. Draw the precedence diagram.
Estimating Sums and Differences of Decimals
Sequences and Series.
Facility Layout Chapter 6A.
Assembly line balancing
FACILITY LAYOUT Facility layout means:
1 Operations Management Layout Strategy. 2 What is Facility Layout Location or arrangement of everything within & around buildings Determines long-run.
Manufacturing Process
Project Management (lecture)
Process Layout Chapter 8 L L M M D D D D L L M M L L M M G G L L G G A
PROJECT MANAGEMENT CPM/PERT V P B Chakravarthi. K Abhijeet Kumar.
Process Selection and Facility Layout Lecture 5. Forecasting Product and Service Design Technological Change Capacity Planning Process Selection Facilities.
Using the queuing-theoretic approximations for the performance of “push” and “pull” production lines to address Design Problems.
AOA A style of project network diagram in which arrows
Project Management (lecture)
EXPLICIT RULES: INPUT-OUTPUT FORMULAS
The number in each lane indicates
Finding the nth term, Un Example
Presentation transcript:

Additional line balancing notes SOM 306 Fall 2008 Abe Feinberg

Line Balancing Procedure 1. Determine which tasks must be performed to complete one unit of a particular product 2. Determine the order or sequence in shich the tasks must be performed. 3. Draw a precedence diagram. This is a flow chart where circles represent tasks and connecting arrows represent precedence. 4. Estimate task times. 5. Calculate the cycle time 6. Calculate the minimum number of work stations. 7. Use one of the heuristics to assign tasks to work stations so that the production line is balanced.

Assembly Line Balancing Formulas Cycle time = (Available Work Time/ Required Output Rate) Available Work Time = Scheduled Work time – Breaks Theoretical Minimum No. of Stations= [Total Work Required for One Unit/Cycle Time] where [] indicates to Next Integer

Steps 1-2 in the Longest Task Time Heuristic 1. Let i=1, where I is the number of the work station being formed. 2. Make a list of all tasks which are candidates for assignment to this work station. For a task to be on this list, it must satisfy all these conditions: a. It cannot have previously been assigned to this or a previous work station. b. Its immediate predecessors must have been assigned to this or a previous work station c. The sum of its task time and all other times of tasks already assigned to the work station must be <= cycle time. If no candidates can be found, go to step 4.

Steps 3-4 in the Longest Task Time Heuristic 3. Assign the task from the list with the longest task time to the work station. 4. Close the assignment of tasks to work station 1. This can occur in two ways. If there are no tasks on the candidate list for the work station, but there are still tasks to be assigned, set i=i+1 and go to step 2. If there are no more unassigned tasks, the procedure is complete.