THEMIS MISSION PRE-SHIP REVIEW

Slides:



Advertisements
Similar presentations
EMERGENCY MEDICAL MANAGEMENT OF RADIATION CAUSALTIES IN HOSPITAL Module XVII.
Advertisements

APOLLO 13 Safety Message Bob Sieck Odyssey Spacecraft NASA Project Engineer April 1970.
15. Operations S.I. 61 of General Application These regulations apply to :- - aircraft registered in Ireland, wherever such aircraft may be - aircraft.
Magnet Cooldown Scheme 17 th February 2012 Roy Preece (STFC RAL)
USING NASA QUALITY STANDARDS NASA Academy of Aerospace (AAQ) Quality Mini-Workshop Ken Crane Quality Engineering Technical Discipline Team Lead NASA SAFETY.
© Pearson Education Limited, Copying permitted for the purchasing institution only. This material is not copyright free. Painting and Decorating.
GLAST LAT Instrument GLAST Monthly Mission Review October 29, 2007 K. Fouts, SLAC 1 Monthly Mission Review Project Status Overview October 29, 2007 Ken.
Health and Safety Manual Section C3 Cryogens. Cryogens  Fluids which at ambient temperature cannot be liquefied solely by pressure  Include liquid oxygen,
S-271 Helicopter Crewmember Slide 7D-1 Unit 7D Operational Safety - Lesson D: Parking Tender and Miscellaneous Roles and Responsibilities.
LSU 01/18/2005Project Life Cycle1 The Project Life Cycle Project Management Unit, Lecture 2.
Think safe. Act safe. Be safe. Supervisory Safety Leadership Training Best Safety Practice # 5 Identification of Injury Causes “Leading Indicators” Identifying.
THEMIS FRRSC - 1 KSC, Feb 12, 2007 SPACECRAFT OVERVIEW/STATUS Peter R Harvey THEMIS Project Manager.
NASA’s Goddard Space Flight Center LRO Integration and Test Joanne Baker GSFC Code 568 August 16-17, 2005.
FORK LIFTS ELECTRIC JACKS Powered Industrial Truck Mushroom Generic Sample Program 29 CFR March 2012.
8/8/20061 LATE TYPE EVAP At Rest 1. 8/8/20062 LATE TYPE EVAP Components 2.
STUDENT LAUNCH PRELIMINARY DESIGN REVIEW PROJECT ADVANCE.
( ELR) - 1 STEREO - Solar Terrestrial Relations Observatory Mission STEREO SWG STEREO OBSERVATORY Status Edward Reynolds APL STEREO Project Manager.
THEMIS Instrument Suite PERSuite T-V- 1 UCB, May 2, 2005 THEMIS Instrument Suite Thermal Vac Test Rick Sterling University of California, Berkeley.
STEREO - Solar Terrestrial Relations Observatory Mission STEREO STEREO Science Team Meeting May 2, 2005 Presented by Edward Reynolds APL STEREO Project.
THEMIS TIMPURGE- 1 UCB, JUNE 16, 2005 THEMIS INSTRUMENT NITROGEN PURGE.
THEMIS Instrument CDR(1) UCB, April 19 & 20, 2004 Mission Assurance Critical Design Review Ron Jackson University of California - Berkeley.
MPEREMC 1 UCB, June 23, 2006 THEMIS MISSION PRE-ENVIRONMENTAL REVIEW Probe 2 EMC Test Results David Curtis University of California - Berkeley.
Floor Jacks and Stands Harkness Career Center. Floor Jacks Parts Identification.
MPSRReaction Control System 1 UCB, 26 October 2006 THEMIS PROBE MISSION PRE-SHIP REVIEW (Update on repressurization) Michael Sholl University of California.
GLAST LAT ProjectApril 27, 2006: LAT Pre-Ship Review Presentation 12 of 12 Quality Assurance 1 GLAST Large Area Telescope: LAT Pre-Ship Review Performance.
Mechanical Integrity Training. Lesson Objectives  Describe MI Training Required  Describe How to Conduct Training  Describe Requirements for Maintaining.
FM2 PPSRAGENDA 1 UCB, March ??, 2006 THEMIS PROBE FM2 PRE-ENVIRONMENTAL REVIEW INTRODUCTION Paul Turin LME University of California - Berkeley.
GLAST LAT ProjectSeptember 15, 2006: Pre-Shipment Review 1 Integration and Test Presentation 11 of 12 GLAST Large Area Telescope: LAT Pre-Shipment Review.
MPSRQA- 1 UCB, Oct 26, 2006 THEMIS MISSION PRE-SHIP REVIEW Mission Assurance Manager Ron Jackson University of California - Berkeley.
15-16 June THEMIS Propellant Offload Concept M. Sholl (UCB) M. McCoullough (SAI) P. Turin (UCB) June 2005 MIWG/GOWG(TIM) Space Sciences Laboratory.
Mission Operations –Launch February 15, 2000 at 22:02:15 UTC = 14:02:15 PST –41 Days IOC and antenna deployment period –2 year science mission operations.
24b - 1 NASA’s Goddard Space Flight Center LRO Safety Dave Bogart Code 302 August 16-17, 2005.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
Composite Overwrapped Pressure Vessels
F1, F3, F4, F5 PER 1 UCB, June 23, 2006 THEMIS MISSION PRE-ENVIRONMENTAL REVIEW Thermal Christopher Smith Thermal Engineer University of California - Berkeley.
THEMIS Instrument PDR Bill Donakowski/ EFI Radial Boom 1 UCB, October 15-16, 2003 EFI Radial Boom EFI Radial Boom Mechanical (SPB Spin Plane Boom) Bill.
SWT Overview 1 UCB, Nov15/16, 2006 THEMIS SCIENCE WORKING TEAM MEETING Mission Overview Peter R. Harvey Project Manager University of California - Berkeley.
SCH Controls Readiness Review: Site SCH Controls Readiness Review: Site UNIQUE HAZARDS: Significant fields in adjoining magnet cells Magnetic field.
FM1 Instrument Suite Pre-Ship Review (PSR)INT- 1 UCB September 21, 2005 THEMIS FM1 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) INTEGRATION AND TEST PLANS Jeremy.
Art Nelson, Jr.AMS-02 Technical Interchange Meeting - JSC - January Ground Safety Status.
FM2 PPEREMC 1 UCB, March 16, 2006 THEMIS PROBE FM2 PRE-ENVIRONMENTAL REVIEW EMC Test Dave Curtis System Engineer University of California - Berkeley.
SPACECRAFT OVERVIEW/STATUS
THEMIS MRRI&T − 1GSFC, January 5, 2007 Integration and Test.
THEMIS Instrument PDRMission Assurance- 1 UCB, October 15-16, 2003 THEMIS Mission Assurance Preliminary Design Review Ron Jackson University of California.
SAFETY TALK BP AMOCO - TEXAS CITY OPERATIONS DATE: 19 APRIL 1999 LOCATION: OSP, F-301ARV.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct 2, 2001 Darren Marsh1 I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist.
MNM Fatal Powered Haulage Accident Powered Haulage Accident December 8, 2011 (Minnesota) December 8, 2011 (Minnesota) Crushed Stone Operation Crushed.
Process Safety Management Soft Skills Programme Nexus Alliance Ltd.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January Instrument Pre-Environmental Review Safety and Mission.
FIELDS Mission Assurance Manager University of California, Berkeley
Jacking The aviation technician must be familiar with the jacking of aircraft in order to perform maintenance and inspection. Jacking procedure is vary.
PERSONAL SAFETY INTERLOCKS External EHS Expert Panel Workshop
FIELDS Mission Assurance Manager University of California, Berkeley
THEMIS INSTRUMENT SUITE FM4/FM5 PRE-ENVIRONMENTAL REVIEW
Spacecraft Interface and I&T
FHM TRAINING TOOLS This training presentation is part of FHM’s commitment to creating and keeping safe workplaces. Be sure to check out all the training.
THEMIS Mission Assurance
Solar Probe Plus FIELDS V5 Mechanical Pre-Ship Review April 10, 2017
THEMIS INSTRUMENT SUITE
ISUAL Product Assurance
Integrated Front Bullbar Lifting Points
THEMIS Mission Confirmation Readiness
MISSION PRE-ENVIRONMENTAL REVIEW MASS PROPERTIES & SPIN BALANCE
Radiological Response Needs Self-Assessment Tool
JO EHS Statistics Actual Limit JO Employees Contractors
THEMIS MISSION PRE-SHIP REVIEW
GLAST Large Area Telescope:
Installation Binder / IRR – an example
Commercial Drivers’ License (CDL) Training/Information
Use only certified lifting equipment in good condition
Presentation transcript:

THEMIS MISSION PRE-SHIP REVIEW Safety Bill Donakowski (billd@ssl.berkeley.edu) University of California - Berkeley

Hazardous Operations to be Performed at Launch Site Lead Role Support Role Lifting, Transportation of Flight Hardware, Integration to 3rd Stage UCB ASO/Boeing Installation of Bolt Cutters Boeing Use of Asphyxiation Gases (Nitrogen & Helium) ASO Pressurization of RCS System Probe RCS Fueling KSC Fueling Group PCA Spin Balance Installation of SSS Probes Functional Check-out (including Transmitter Turn-on) RF Check

Procedures with Hazardous Operations Status Lifting, Transportation of Flight Hardware THM-MINT-PROC-015, -068, -069 Released THEMIS PCA Mate to Launch Vehicle THM-MINT-PROC-062 Probe LPT THM-MINT-PROC-013 Solar Array Illumination Check THM-MINT-PROC-019 Purging Probe Instruments THM-MINT-PROC-122 PCA Purge Bag Installation and Removal THM-MINT-PROC-071 Under Review Pressurization of RCS System THM-MINT-PROC-056 Probe RCS Fueling THM-MINT-PROC-051 PCA Spin Balance THM-MINT-PROC-067 Installation of SSS Boeing Procedure Bolt Cutter Installation THM-MINT-PROC-141 RF Check THM-MINT-PROC-086

Personnel Certifications for Launch Site Operations Hazardous Operations Certification UCB personnel (4) certified by KSC Medical Awaiting one more (paperwork submitted) Pyrotechnic Handling UCB personnel (2) certified Crane Operations UCB personnel (4) completed Outside Vendor’s Crane Class Fork Lift UCB personnel (4) certified Project Support to KSC Fueling Operations UCB personnel (3) completed certification for SCAPE Training at KSC Review of ASO hydrazine monitoring protocols on training video Pad Operation ELSA and Video Training to be completed when at ASO

Personnel Certifications for Launch Site Operations Training and Certification of THEMIS personnel nearly complete for Launch Site Operations Remaining items to be completed at ASO ELSA Training Pad Safety Videos THEMIS Team will be ready to support pre-launch activities at KSC/ASO/CCAFS

Project Safety Statistics Personnel Personal Injuries Safety Violations or Problem Reports Flight Hardware Accidents, Mishaps, or Near Misses THEMIS Safety hopes to continue making no measurable contributions to the Project.