Functional Change through RGMA Review Ph2

Slides:



Advertisements
Similar presentations
1 Project Smart Metering Portfolio Foundation & DCC Day 1 Updates April 2013.
Advertisements

Senior Stakeholder Forum Wednesday 19 th June 2013.
1 Smart Metering Portfolio DCC Day 1 Project Smart Metering Portfolio Focus Group Project Update Thursday 06 th June 2013.
UK Link Programme Dashboard Report Change Overview Board: 13/05/2014 Critical HLD activities complete enabling entry into Detailed Design Detailed Design.
Performance Assurance 21 st May Value Chain. Value Chain Xoserve would like to propose an approach to further aid the development of the Performance Assurance.
PN UNC Workgroup iGT Services 7 th February 2012.
1 Smart Metering Foundation Stage February Agenda File Format Changes for Effective Switching Back Population Approach for Effective Switching.
Industry Dialogue on xoserve Services 14 th September 2007.
IGT and Shipper Workgroup meeting 28 th February 2011.
DCA timeline and ROM Overview 12 October Smart Metering Indicative Timeline Evaluation Service (EVS) 2528 received / Rough Order of Magnitude.
1 iGT Agency Services migration considerations As part of UK Link replacement programme (incorporating industry requirements) the new systems will need.
DSC Change Committee UK Link Future Releases Proposed Approach
Ofgem Switching Programme Overview
Supply Point Register 7th December 2011
Supply Point Register 10th January 2012
UK Link Programme Update to PNUNC August 13th, 2013
xrn4361 UK Link Future Release 2
UKL Future Release 2 Cutover/Implementation
XRN Construction of a Meter Reading where a Converter and AMR is recorded OR where a Meter with Conversion capability is fitted v2 DWG 28/06/2018.
DSC Change Committee Summary – 12th December
Smart Metering Consequential Changes
Mod 430 iGT Mod 047 Workgroup Update
Agenda Action Review Update on IX and iGT access Testing strategy
DSC Change Committee Summary – 13th June
Change Management Committee – June 2019 Update
R&N Timeline Release 2 Release 3 Feb-19 June-19
Change Management Committee – June 2019 Update
Overview XRN4665 is looking to add new EUC profiles for bands 01B & 02B New EUC profiles will be split based on Market Sector Code & Pre-Payment Meter.
Project Nexus Workgroup
CSS Update for CoMC 19th September 2018
DSC Change Committee Summary – 11th July
Chris Warner UNC Modification Panel 21 December 2017
Background MDD is currently managed within SPAA
Modification 0468 – Unique Property Reference Number by Gas Transporters David Addison.
DSC Change Committee Summary – 10th October
Change Proposals Capture to Delivery
0630R Review Group meeting 21 February 2018 Settlement Data topic
DSC ChMC CSS update 13th February 2019
R&N Timeline June-19 Sept-19 (EUC) Nov-19 Minor Release D4
Release 2 Scope Business Benefit Review
DSC Governance Sub Group Recommendations
Ofgem Switching Programme: Central Switching Service consequential change update 9th May 2018.
Smart Metering Portfolio DCC Day 1 UK Link Committee DCC Day 1 Shipper File Format Representation Thursday 08th August 2013.
Change of Supplier Data Provision to Ofgem
Market Participant Identity Process – migration to UNC
DSC ChMC CSS Consequential Update 13th March 2019
June 2019 Release Scope DSC Change Management Committee
UKL Committee - DN Interruption Update
Release 3 Scope Selection and Plans
Change Management Committee – Retail & Networks Update
Transporter Initiated SPA Confirmations on behalf of User Potential Impact Discussion with UK Link Committee.
DSC Change Committee Summary – 13th February ‘19
Ofgem Switching Programme: Central Switching Service consequential update 16th May 2018.
Retail & Networks ChMC Update
MOD Proposal 0224 Facilitating the use of AMR in the Daily Metered Elective Regime Distribution Workstream Update Following Completion of Analysis 23rd.
Implementation Approach Distribution Workgroup – June 2014
Data Office – Portfolio of work
High Level System Solution Impact Assessment
High Level System Solution Impact Assessment
Retail Energy Code - Data Access Schedule
High Level System Solution Impact Assessment
UIG Task Force Progress Report
0688 Workgroup Xoserve Actions
UK Link Timeline June-19 Sept-19 (EUC) Nov-19
Enabling Large Scale Utilisation of Class 3
Data Office POAP July/August 2019
DSC ChMC Switching Programme Update 11th September 2019
DSC Change Committee Update
DSC CoMC Switching Programme Update September 2019
REC Data Specification and UK Link File Formats
Presentation transcript:

Functional Change through RGMA Review Ph2 DSC Change Committee June 2017

Overview A review of the non-domestic gas metering market in Great Britain was conducted with a report published by Ofgem in March 2016. Ofgem have drawn attention to data quality issues which could be attributed to important information not being included in data flows provided to Xoserve. Data items highlighted were: Meter Asset Provider Id AMR Asset Provider Id AMR Device Details Discussions related to how the visibility of this data can be improved have commenced within the industry as part of the RGMA Review Ph2 Group In anticipation of this, Xoserve are actively engaging with the Change Committee to consider the benefit of this change and understand the available options with the outcome of a Change Proposal being raised.

Requirement Definition Xoserve recommends that the requirements and business rules are clarified, and that this would be achieved through the RGMA Review Ph2 Group Participant in the first group were: MAMs MAPs Suppliers / Shippers Xoserve recommends that solution options be considered through the RGMA Review Ph2 Group, but that these be ratified by the Change Management Committee using the SDG group. Of the three requirements, the MAP Id change requirement is less contentious [views invited], therefore, propose to engage SDG for preliminary views prior to RGMA Ph2 RG (on 20th June)

Holding MAP Id Centrally – Potential Options Recording MAP Id centrally would require an alteration to the UK Link interface with consequential impacts on UK Link data flows. Xoserve have indicated some of the potential options to consider when looking to implement this functional change: A new allowable value (MAP), added to the S96 record. This file (GEA) can be used to notify MAP Id. and/or An amended rule regarding ASSPR allowable value to the Market Participant dataset within the JOB and UPD UK Link format - a change to the RGMA data flows to notify MAP Id.

Areas to Consider MAPs have raised concerns around losing sight of their assets as the MAP Id is not held centrally or included within industry flows. Xoserve understand some of the key reasons for a change in MAP: Physical Change of Asset Transfer of Asset/Contract Change Change of Shipper/Supplier (CoS) Our assumption is that reason 1 – ‘Physical Change of Asset’ causes the majority of changes to the MAPs. GEA Option Can capture reason 1, 2 & 3 JOB Option Would capture reason 1 only – physical update UPD would need to be used for reason 2 & 3 – update Understood that Market Participant of ASSPR is available within RGMA flows for MAM to Supplier flows

Areas to Consider cont How the MAP data is provided within UK Link flows needs to be assessed. In terms of the options indicated, incoming MAP Id information would follow the below path: Physical Change of Asset: Transfer of Asset / CoS:

Preliminary Assessment Initial Assessment: Use of the GEA only, would have limited change impact. Using the JOB would have a greater impact. Amending the UPD flows would have a greater impact. Views from Shippers required: Use of the GEA only would make it necessary for Suppliers or Shippers to extract AMR ASSPR details from JOB/UPD flows and format this into the GEA. Use of the JOB presumes limited impact to Supplier/Shipper assuming the MAMs provide ASSPR data. Conclusion: GEA – expected lower impact and cost to change CDSP Systems. JOB (UPD) – expected higher impact and cost to change CDSP Systems. Views from impacted constituent group (Shipper), to instruct analysis.

Thank you