the International Civil Aviation Organization

Slides:



Advertisements
Similar presentations
APEC GNSS Implementation Team and Outcomes of APEC GIT 16
Advertisements

Regional RAIM Prediction System – Progress Report
1 Marinus C. F. Heijl Acting Director Air Navigation Bureau ICAO 30 March 2007 SYMPOSIUM OUTCOMES AND THE WAY FORWARD.
System of Systems (DRAFT) To be approved by the ICAO Council
Briefing on APANPIRG Priorities and Targets
49 th Conference of Directors General of Civil Aviation, Asia and Pacific Regions, New Delhi, India, 8-12 October Presented by the International.
49 h Conference of Directors General of Civil Aviation, Asia and Pacific Regions, New Delhi, 8 – 12 October 2012 APANPIRG ACTIVITIES – OUTCOME OF APANPIRG/23.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-30/PIA-2 Service Improvement through Digital Aeronautical Information.
Information Management The ICAO Perspective
33rd APEC Transportation Working Group Tokyo, Japan October Key Outcomes of the Asia-Pacific Regulators’ Meeting April 2010, Singapore.
ICAO Provisions for Safety Management
International Civil Aviation Organization European and North Atlantic Office ICAO EUR HLSC Preparatory Seminar 9-11 February 2010 Baku, Azerbaijan Theme.
APAC PBN Seminar F.LECAT (ICAO)
International Civil Aviation Organization AIM - implementation Saulo Da Silva Workshop on preparations for ANConf/12 − ASBU methodology (Bangkok, 14-18/Nadi,
International Civil Aviation Organization FAOSD Programme Administrative and Programme Participation Terms & Conditions Roles and Responsibilities.
ATS Route and Waypoint Implementation:
International Coordinating Council of Aerospace Industries Associations International Coordinating Council of Aerospace Industries Associations (ICCAIA)
ICAO COSCAP INITIATIVES ICAO COSCAP INITIATIVES Speaker : Len Cormier CTA COSCAP-NA ICAO Technical Cooperation Bureau.
ATM Implementation Support by ICAO APAC RSO
Presentation to: Name: Date: ICAO Asia-Pacific AMHS Activities & Status ICAO Asia-Pacific AMHS Activities & Status ATS Message Handling System (AMHS )
Introduction to PBN Seminar ICAO PBN Implementation 1.
International Civil Aviation Organization REGIONAL GNSS RELATED ACTIVITIES Secretariat ICAO APAC OFFICE GNSS IMPLEMENTATION SEMINAR 26 MARCH 2012.
International Civil Aviation Organization GNSS SURVEY OUTCOME Secretariat ICAO APAC Office GNSS IMPLEMENTATION SEMINAR 26 MARCH 2012.
Requirements - background
Global and Regional Planning for AIM Transition
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-30/PIA-2 Service Improvement through Digital Aeronautical Information.
Update on Safety Management (DP/8) February 2016 Michiel Vreedenburgh Chief Aviation Safety Implementation Planning & Support Air Navigation Bureau ICAO.
Cooperative Development of Operational Safety and Continuing Airworthiness Programme COSCAP South East Asia COSCAP-SEA Action on Decisions 16 th Steering.
European Regional Aviation Safety Group (RASG EUR)
APAC PBN Seminar F.LECAT (ICAO)
PBCS Workshop May 2013, Bangkok
Performance-Based Communication and Surveillance (PBCS)
SYMPOSIUM OUTCOMES AND THE WAY FORWARD
Workshop on preparations for ANConf/12 − ASBU methodology
ATS Route and Waypoint Implementation:
ATM Implementation Support by ICAO APAC RSO
Electronic Filing of Differences(EFOD) System and Filing of Differences Task Force (FDTF) Air Navigation Bureau.
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
System of Systems (DRAFT) To be approved by the ICAO Council
Summary of discussions of the NGAP Implementation Working Group 6 and 7 December 2016 Mary Nelson – Implementation Working Group Chair 8th December 2016.
Workshop on preparations for ANConf/12 − ASBU methodology
16th Session of RA II (Asia)
Workshop on preparations for ANConf/12 − ASBU methodology
AMHS/SWIM Seminar Chiang Mai, Thailand 5-6 March 2012
Next Generation of Aviation Professionals (NGAP)
A PERFORMANCE BASED GLOBAL AIR NAVIGATION SYSTEM: PART II
APANPIRG ACTIVITIES – OUTCOME OF APANPIRG/23 DP/3/1
Briefing on APANPIRG Priorities and Targets
(UNSD introduction followed by open discussion)
IATA/ATDI Senior Civil Aviation Management Course
FAOSD Programme Administrative and Programme Participation Terms & Conditions Roles and Responsibilities.
SIP/2012/ASBU/Nairobi-WP/7
ALLPIRG/4 MEETING PARTICIPANTS (Montreal , 8 February 2001)
Regional RAIM Prediction System – Progress Report
Regional Preparatory Workshop for the ITU WRC-2015
A PERFORMANCE BASED GLOBAL AIR NAVIGATION SYSTEM: PART I
COSCAP-SEA Work Programme Discussion Paper 3
Workshop on preparations for ANConf/12 − ASBU methodology
PARIS21 - League of Arab States
COSCAP – SOUTH ASIA 19th MEETING OF THE STEERING COMMITTEE
AIM Global Strategy Air Navigation Procedures for AIM Seminar
COSCAP – SOUTH ASIA 19th MEETING OF THE STEERING COMMITTEE
SAM Regional Seminar/Workshop
23 May 2012 AIS-AIM SG #6.
Water Directors meeting Warsaw, 8-9 December 2011
ICAO Programme Elements on Aviation Safety
North Asia Regional Aviation
Collaboration Among the APAC COSCAPs (DP8)
Briefing to ICAO TCB Seminar
Presentation transcript:

the International Civil Aviation Organization RESPONSES FROM ADMINISTRATIONS TO ACTION ITEMS ARISING FROM THE 48th CONFERENCE OF DIRECTORS GENERAL OF CIVIL AVIATION, ASIA AND PACIFIC REGIONS DP/2/1 Presented by the International Civil Aviation Organization

ACTION ITEM 47/1 Given the global and trans-boundary nature of air traffic flows the Conference recognizes the need for ATM Contingency Plans to be developed in consonance with ICAO Annex 11 and requests the ICAO APAC Office to consider the establishment of a Task Force for planning, coordination and implementation of a regional ATM contingency plan..

ICAO ACTIONS - 47/1 The Task Force established for planning, coordination and implementation of a regional ATM contingency plan. The Task force met from 17-20 April 2012 in Bangkok

ACTION ITEM 47/4 Noting the lack of completion of State PBN Implementation Plan in the APAC Region and in keeping with the ICAO Assembly Resolution A37-11, the Conference urges States/Administrations that are yet to develop their plans, to complete a State PBN implementation plan as a matter of urgency to achieve the timelines and intermediate milestones and: a) requests States/Administrations to identify the focal point, consider deploying some resources to the PBN implementation plan and ensure the responses made within the deadline; b) submit their plans to the ICAO APAC Office at the earliest; and c) requests the ICAO APAC Office to initiate a questionnaire to find out the problem/issues faced by States in not being able to submit a State PBN Implementation Plan.

ICAO Action 47/4 Refer DGCA 49 IP/3/17 on PBN TF outcomes The PBN Plan Review Team had undertaken assessments of 12 plans in 2012, and as a result there has been a significant improvement in the number of administrations with a ‘Robust’ status plan, so one-third of administrations now had satisfactory PBN planning.  States that had achieved this robust status in the past 12 months were: Hong Kong, China, Myanmar, Nepal, the Philippines and Sri Lanka.  Table in next slide provides an overall summary of the status of Asia/Pacific States PBN Plan changes.

ICAO Action 47/4 Continued

ICAO Action 47/4 Continued: Notwithstanding the overall improvement, a large number of States remained as either ‘Marginal’ or ‘Incomplete’ status plans, or had no plan.  States with significant aviation activity in this category were Malaysia (‘Marginal’), Pakistan (‘Marginal’) and Indonesia (‘Incomplete’).    Of significant interest to the Task Force was the proportion of Pacific Island administrations (14 of 18) that had not provided a PBN Plan to the Asia/Pacific Office A PBN SIP Workshop has been approved and is planned for Nadi, Fiji 10-11 December 2012, which will be held before the last PBN/TF/10.  The PBN  Workshop is intended to focus on bringing the small South Pacific Island States up to speed with a State PBN Plan.

ACTION ITEM 47/16 Taking cognizance of the difficulties mentioned in the DGCA-47/DP/9c/3 (Scheduling of DGCA Conferences being held in the same years as ICAO Assemblies) paper, the Conference agrees that during an ICAO Assembly year, the DGCA Conference should be held in a reasonable timeframe before or after the ICAO Assembly, noting that this may require some adjustments to the rescheduling of other related regional meetings.

ICAO Action 47/16 The ICAO Regional Office looked at various options for maximizing efficiency and in consultation with State Administration worked out the following draft program keeping in view the overall objective of efficient management of meetings, cost effectiveness and resources within Regional Office for year 2013. Reducing the number of APANPIRG Meeting days from 5 to3; Holding RASG APAC meeting back to back with APANPIRG Meeting; Holding DGCA Conference consecutively with APANPIRG & RASG Meetings. 50th DGCA Conference is scheduled to be held in Bangkok from 1 to 3 July 2013.

ICAO Action 47/16 The Plan for 2013 is to hold APANPIRG/24 from 24 to 26 June 2013 (Monday to Wednesday), followed by RASG APAC on 27 - 28 June (Thursday and Friday). The dates for the Sub Group Meetings will be advanced accordingly The 50th DGCA Conference in Bangkok is scheduled to be held from 1 to 3 July 2013 (Monday to Wednesday)..

48 DGCA Conference Action Items State responses to the 48th DGCA Conference Action Items are available in 49/DP/2/1

Action Item 48/1 Recognizing the need for collaboration and harmonization towards seamless ATM in the Asia-Pacific region, the Conference urges States and Administrations to: a) share information and experience on their ATM modernization Programmes, and requests ICAO to explore setting up a website for this; and b) actively participate and contribute resources as appropriate to the Asia Pacific Seamless ATM Planning Group.

ICAO Action 48/1 Two key deliverables Refer DGCA 49 DP/3/18 and APAC website (meetings) Two key deliverables Asia/Pacific ASBU Position Statement Seamless ATM Principles supporting the draft Seamless Plan. A draft Seamless ATM Plan including Seamless ATM Principles presented to APANPIRG/23 The first meeting of the APSAPG was held from 31 January to 3 February 2012. Established the working framework of planning group and the outcomes expected APSAPG/2 was held in Tokyo from 6-10 August 2012, and APSAPG/3 is expected to be held 21-25 January 2013 in Chennai, India. Two key deliverables Asia/Pacific ASBU Position Statement Seamless ATM Principles supporting the draft Seamless Plan. A draft Seamless ATM Plan including Seamless ATM Principles presented to APANPIRG/23

Action Item 48/ 2 Recognizing the potentially significant impact of the ICAO Aviation System Block Upgrades on national ATM modernization and regional harmonization, the Conference requests APANPIRG, through the Asia Pacific Seamless ATM Planning Group, to: a. study the proposed ICAO Aviation System Block Upgrades and provide advice on the benefits, business case and implications to States and Administrations; and b. explore formulating a regional position prior to the 12th Air Navigation Conference.

ICAO Action 48/2 Refer DGCA 48 DP/3/18 a) on going – APSAPG is studying the proposed ICAO Aviation System Block Upgrades b) APANPIRG/23 adopted the Conclusion on Asia/Pacific Position Statement on ASBU

Action Item 48/ 3 Noting that not all elements of the ICAO Aviation System Block Upgrades are required by States and Administrations, the Conference requests APANPIRG, through the Asia Pacific Seamless ATM Planning Group, to: identify the critical minimum operational and system needs under the ASBUs to be implemented for implementation.

ICAO Action 48/3 Refer DGCA 49 DP/3/18 APANPIRG/23 agreed to the following Conclusion on Asia/Pacific Position Statement on ASBU Contained in Appendix 2 to the APANPIRG/23 report on Agenda Item 3.5

Action Item 48/ 4 Recognizing that the full benefits of ADS-B would only be achieved through harmonized implementation, the Conference urges States and Administrations to expedite ADS-B implementation and share with ICAO Regional Office their implementation plan.

ICAO Action 48/4 13 Administrations support implementation of ADS-B Three Guidance Materials (Safety case, sample document for sharing and amendment to AIGD) have been posted on APAC website.

Action Item 48/5 Refer: DGCA 48 IP/3/17 Noting the importance of GNSS in supporting PBN, the Conference urges States and Administration to: a. expedite the implementation of PBN as well as GNSS, and to look into creating a regulatory environment and the protection of aviation use of GNSS; and b. implement the minimum requirement of GNSS-enabled area navigation systems for all RNP navigation authorizations, which has been adopted. .

ICAO Action 48/5 17 Administrations support implementation of GNSS GNSS workshop was held on 26th March 2012 and the Outcomes were: 1) Recommendation 1: That, States, which have not yet developed a GNSS plan, be requested to integrate their GNSS implementation plan within their PBN plan; 2) Recommendation 2: That, ICAO be invited to consider including GNSS as an element of ILS for the purpose of distance/altitude verification.

Action Item 48/6 Given the need for global implementation of the new FPL 2012, the Conference urges States and Administrations to: a. expedite its implementation; and b. cooperate and share information with other States and Administrations to ensure a timely transition to the FPL2012..

ICAO Action - 48/6 Refer DGCA 49 DP/3/16 16 Administrations have reported implementation is at various stages of completion and one Administration has reported that FPL 2012 has been implemented. State Letter 12 April 2012, advising States of their assessed risk, and requesting response to revised questionnaire by 11 May Thirteen responses by the due date Total 23 responses now received, including only partial information in some cases.

Action Item 48/7 To promote AIM implementation in the Asia-Pacific, the Conference urges ICAO to look into: a. developing an Asia Pacific AIM Implementation Plan to ensure seamless transition to AIM and inter-operability;   b. providing States with Advisory Circular on eTOD implementation until ICAO specifications on electronic terrain and obstacle data are developed; c. establishing a website as a means of tracking the implementation status of States and Administration; and d. establishing a central database of aeronautical information that is available to ATM users.

ICAO Action 48/7 a) The Seamless ATM Plan being developed by the Asia/Pacific Seamless ATM Planning Group (APSAPG) includes AIM requirements. The AIM transition table being maintained and updated on the ICAO Asia/Pacific Regional Office website tracks current AIM implementation status. Due to slow progress of many States the AIS-AIM Implementation Taskforce (AAITF) has placed a much greater emphasis on individual State planning to achieve AIM transition as soon as practicable, including the development by each State of a basic plan.   

ICAO Action 48/7 b. E TOD Manual is under preparation and expected to be available in 1st Quarter of 2013 c. In progress as part of transition from paper based Regional ANPs to web based Regional e ANPs. Target date- July 2013 d. To be considered in due course

Action Item 48/8 Recognizing the benefits of ATFM, the Conference requests that the ICAO Regional Office to develop and coordinate with ICAO Air Navigation Bureau the Regional ATFM Strategy.

ICAO Action 48/8 ATFM is a key component of the Seamless ATM Plan The Asia/Pacific ATFM Concept of Operations has been incorporated into the new Draft ATFM Global Guidance Material

THANK YOU!