WF on NPUSCH scrambling for Rel-14 NB-IoT

Slides:



Advertisements
Similar presentations
Way forward for LTE DL 4Rx AP SI on RF
Advertisements

Way Forward Proposals for Inter-band CA Consisting of B41
WF on design of physical downlink control channel for MTC CATT, Alcatel Lucent, Alcatel Lucent Shanghai Bell, Ericsson, ETRI, InterDigital, MediaTek, NTT.
WF on PBCH Coverage Enhancement
Way forward on eIMTA signaling to support up to 32 component carriers
3GPP TSG RAN WG1 # R1-15xxxx Fukuoka, Japan 25th – 29th May 2015
Summarizing baseline results Nokia Networks 3GPP TSG RAN WG1 Meeting #81R Fukuoka, Japan, 25 th – 29 th May 2015 Agenda Item:
Doc.: IEEE /1391r0 Submission Nov Yakun Sun, et. Al.Slide 1 About SINR conversion for PHY Abstraction Date: Authors:
WF on BS MMSE-IRC receiver
WF on CQI Table for eMTC ZTE, Sony, Nokia, Ericsson, Samsung… R GPP TSG RAN WG1 #83 Anaheim, USA, 15th – 22nd November, 2015 Agenda item
WF on Support of EBF/FD-MIMO Features in TM9
WF on MCOT and CWS for LBT priority classes
WF on SIB1bis Transmission
WF on LAA DL Multi-Channel LBT
Proposal for NB-IoT single-tone only UE
WF on UE capability signaling for FD-MIMO Class B LG Electronics, Intel Coorporation, NTT DOCOMO, Qualcomm 3GPP TSG RAN WG1 Meeting #84 R St Julian’s,
Clarification of the scope of the study on latency reduction techniques for LTE 3GPP TSG RAN Meeting #71RP-16xxxx Göteborg, Sweden, March , 2016.
WF on dynamic blockage Qualcomm, Intel, Samsung, Ericsson R GPP TSG RAN1 #85 Nanjing, China, May , 2016 Agenda Item:
WF on MCOT limit Signaling and Modifying LBT type Ericsson, … 3GPP TSG RAN WG1 #85 R1-16xxxx Nanjing, China 23 rd – 27 th May 2016 Agenda item:
WF on Supporting different Numerologies in a NR carrier LG Electronics, [Huawei, HiSilicon, Panasonic], 3GPP TSG RAN WG1 Meeting #85R Nanjing,
WF on Bandwidth Part for DL common channel
Summary of SLS for RRM NTT DOCOMO
3GPP TSG-RAN WG4 Meeting #84bis
R GPP TSG RAN WG1 Meeting #90 Prague, P.R. Czechia, 21st – 25th August 2017 Agenda: WF.
WF on new NR CG sequences for PUCCH
Initial workplan on NR spectrum
Wayforward on Rel-15 NR Study Items
WF on pre-DFT PT-RS pattern for DFTsOFDM
Summary of proposals on CBG-based retransmission
ITU-R Ad-Hoc Contact person
Proposals on remaining issues on PDCCH structure
RACH configuration ZTE, Sanechips R1-171xxxx
Summary of offline discussion for PDCCH structure
Proposals on remaining issues on search space
WF on NB-IoT Radio Link Monitoring Performance Test Procedure
WF on measurement capability and measurement gap for NR
Way forward on UE EIS Spherical Coverage and Beam Correspondence
3GPP TSG RAN WG1 Meeting #90bis
WF on remaining open items for allowing 1Tx transmission in LTE-NR DC
WF on Beam failure recovery
Qualcomm Incorporated
Illustration of RMSI monitoring windows (TDM)
WF on SS Block Index Reporting through RACH Procedure
Way forward on cell identification in NR
Intel Corporation, Apple
Proposal for defining requirement of LTE BHH TRP/TRS
WF on transmit diversity for DFTsOFDM
Way forward on DL ACLR&ACS for WP5D LS
Samsung, KT Corp., NTT DOCOMO, Verizon, [ZTE], [CATT], [Intel]
WF on beam reporting CATT, Intel R1-17xxxxx
WF on Beam-Related Indication
WF on CSI timing offset for PUSCH
LTE-A Relays and Repeaters
Shanghai, China, April 11-15, 2011 Source: Qualcomm Incorporated
WF on Radio Link Monitoring in NR
WF on NAICS Receiver Terminology
Motorola Mobility, Lenovo, …
Evaluation Model for LTE-Advanced
WF for 4Rx CA 256QAM(1/2 layer) and 3/4 layers tests in Rel-14
Way Forward on Coexistence Evaluation Methodologies for LAA
WF on LTE-NR DC with UL coexistence
WF on 4Tx UL Codebook For CP-OFDM
WF on UL Beam Management
WF on UL Beam Management
WF on CB-group based retransmission
Polarized Antenna modelling
WF on Phase discontinuity issue in intra-band EN-DC with 1-PA
WF on LTE-NR Coexistence
Изразеното в настоящата презентация мнение обвързва единствено автора и не представлява официално становище на Комисията за финансов надзор Данил Джоргов.
3GPP and Critical Communications Standardization
Presentation transcript:

WF on NPUSCH scrambling for Rel-14 NB-IoT 3GPP TSG RAN WG1 Meeting #90bis Prague, Czech Republic, 9th – 13th October 2017 Agenda item 6.1.1 R1-1718975 WF on NPUSCH scrambling for Rel-14 NB-IoT ZTE, LGE,Sanechips,Lenovo,[ Qualcomm]

Background Further simulation result is provided based on the comments received last meeting Not fully aligned interfer Interference +Noise scenario Both 3-tone and 6-tone cases

Proposal For Rel-14 NPUSCH , introduce the following symbol-level scrambling (after DFT, before IFFT ) For multi-tone