White Paper Theme 3 - WP7 Facilities & component analysis for detector r&d WP7 Meeting #1 Mar CAPEANS CERN PH-DT.

Slides:



Advertisements
Similar presentations
Project Management Process. Project Complexity means that: a team of people are needed to supply expertise the work needs to be broken into manageable.
Advertisements

ILIAS Physics in deep underground laboratories JRA1 : Low background techniques WP4 : Radiopurity of materials Pía Loaiza Laboratoire Souterrain de Modane,
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
02/07/2014R. Guida CERN/PH-DT-DI1 RPC R&D Collaboration PH-DT Topics of Interest Studies of gas systems performance and development of dedicated gas modules.
Helmholtz Centre for Ion Research D. Krämer, 2nd Lab Directors Meeting, Protvino, January 15-16, 2008 Design and Engineering Issues; Standardization and.
S L H C – P P Management Tools Kick-off Meeting April 8 th, 2008 Mar CAPEANS CERN This project has received funding from the European.
WP7 - Architecture and implementation plan Objectives o Integrating the legal, governance and financial plans with technological implementation through.
Irradiation Facilities at CERN for RD-51 Micro-Pattern Gas Detectors (RD-51) Workshop Nikhef, Amsterdam, April Mar CAPEANS CERN.
University of Wisconsin System HRS Project Update to ITC November 19, 2010.
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
Status and possibilities for the irradiation facility in the PS East Hall Michael Moll, Maurice Glaser 10 March 2010 – IRRAD Working Group - some notes.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Lab Coordination Meeting 9/25/13Introduction – G. Sabbi 1 Magnet Development Plan Update Overview GianLuca Sabbi LARP Lab Coordination Meeting September.
SLHC – PP Management Plan April 3 rd, 2008 M. Capeans, M. Ropka CERN April 3, 20081M.C.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
Hall 180 Cryogenic test facility: Project management: Project Change Request, EVM and Interface Sheet L. Serio.
“Linear collider studies: This heading includes the total funding for CTF3, the CLIC study and the CLIC/ILC collaboration as well as the CERN’s participation.
G. Carboni – Muon Meeting – April 2002 Muon Meeting LHC schedule is now official (Council Committee) First protons (Pilot run) delayed to
Project schedule and status R. Guida, F. Ravotti, D. Pfeiffer November 14th, 2012 GIF++ users meeting.
MICE FAC Alain Blondel 21 september   MICE The International Muon Ionization Cooling Experiment BRIEF STATUS OF MICE.
Activities and news Last meeting: 2015 CERN budget allocations as expected, now distributed on accounts Annual report done, and MTP (Medium Term Plan)
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
UCSC August 12, 2008 U.S. Upgrade R&D Meeting: Strip Detector  Seiden.
Workforce Scheduling Release 5.0 for Windows Implementation Overview OWS Development Team.
STATUS REPORT WP7 Facilities and Component Analysis for Detector R&D Activities and Status Resources and Expenditures Work plan Mar CAPEANS 3/11/08 M.C.
1 Future Circular Collider Study Preparatory Collaboration Board Meeting September 2014 R-D Heuer Global Future Circular Collider (FCC) Study Goals and.
Introduction to Irradiation Facilities 1. Challenges at LHC and Why we need Irradiation Facilities (Mar CAPEANS) 2. PH Department Proton and Neutron Facilities.
TDCA DIALOGUE FACILITY Bridging Phase Guidelines & Criteria for Support DIRCO, 11 NOVEMBER 2015 Prepared by: Kurt Morais| Nov 2015 Letter of.
General Muon Meeting, 03-March-2014 Jay Hauser “Update on Phase 2 muon Technical Proposal”  Recent developments:  ME0 inserted into HGCAL as for other.
Common R&D projects for the LHC upgrade and plans for irradiation facilities Outline: PH common R&D projects Working Group on future irradiation facilities.
News and Miscellaneous UPO Jan Didier Contardo, Jeff Spalding 1 UPO Jan Workshop on Upgrade simulations in 2013 (Jan. 17/18) -ESP in.
SAON Operational Activities Draft proposal Jan René Larsen SAON Board Meeting, January 2012, Tromsø,
Overview on the Proposal for a new Gamma Irradiation Facility at CERN GIF++ Mar CAPEANS April 29 th, 2009 April 29, 091M.C.
Mixed field irradiation -- Who answered ?  In total 36 forms filled / 34 persons answered: 38% 62% CERN: mainly LHC related topics CERF: beside LHC topics.
CLIC 23 rd Project Meeting: news and updates Philip Burrows John Adams Institute Oxford University 1.
Overview on the Proposal for a new GIF, August Page 1 Overview on the Proposal for a new GIF Summary of the document distributed to the users and.
PH Theme 3 R&D Meeting with WP leaders 3/7/2008. Overview of WP’s.
27-Jan-2014 Upgrade Steering Group “Update on Phase 2 TP - muons” J. Hauser, UCLA  Update on progress for TP:  2 slides follow to be shown at USG02 (Upgrade.
ESS | title of presentation | 2012-xx-xx | name of presenter Roles and Responsibilities sub title.
30/4/2010Mar CAPEANSDT Steering Board meeting White Paper R&D WP7 Facilities and Component Analysis for Detector R&D.
EURISOL DS Mid Term Review Orsay April 24th 2007 Management Aspects Collaboration and Interaction Administration and financial aspects with comparison.
PROPOSED STRATEGIC PLANNING PROCESS DECEMBER 3, 2014 Port of Port Angeles.
Workshop summary Outline  Workshop’s aims  Highlights from the presentations (my selection!)  Costing Exercise – What we learnt  Summary - Roadmap.
Proton and neutron irradiation facilities in the CERN-PS East Hall Maurice Glaser and Michael Moll CERN- PH-DT2 - Geneva - Switzerland 6 th LHC Radiation.
Upgrade of the irradiation facilities in the PS East Hall Maurice Glaser, Michael Moll 30 April 2010 – PH-DT steering board meeting activities are part.
Summary of IAPP scientific activities into 4 years P. Giannetti INFN of Pisa.
FCC Special Technologies WP The objective of this WP is to identify the challenges, the showstoppers and look towards opportunities for technology breakthroughs.
CNGS Review 15 July 2003 M. Meddahi1 EVM for CNGS Definitions Pre-requisites Application to CNGS.
20/07/ Marzio Nessi Agenda For NIKHEF plans for the ATLAS Upgrade. NIKHEF ATLAS upgrade plans and organization DL/NH Potential.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
The Next Generation of a Gamma Irradiation Facility GIF++
INSPIRE and the role of Spatial Data Interest Communities (SDIC)
LHC Science Goals & Objectives
PH-DT Seasonal Group Meeting 21/1/14
CERN PH-DT Physics Department (PH) Detector Technologies (DT)
The European Strategy for Particle Physics
June 22, 2017 Burkhard Schmidt for the DT coordination team
CERN R&D plans and Infrastructures
Merging DT1 + DT2 FH /
WP8 – Improvement and equipment of irradiation beam lines
CMS November Upgrade Week
Introduction to the Workshop
PROGRAM CONSULTATIVE FORUM Meeting pack
Irradiation Facilities Questionnaire
Status of CO2 Cooling tests at CERN for Pixel phase 1
SHLC INFN Road Map Working Group 11/01/2006
SNS-PPU upgrades the existing accelerator structure
East Hall under construction
Project Certification Planning Phase August 27, 2014
Presentation transcript:

White Paper Theme 3 - WP7 Facilities & component analysis for detector r&d WP7 Meeting #1 Mar CAPEANS CERN PH-DT

WP7 In the framework of the CERN Council White Paper activities, the PH Department has identified 10 strategic R&D activities which concern the development of specific expertise relevant for future projects, covering the years 2008-2011. WP7 is devoted to Facilities and Component Analysis for Detector R&D and comprises two main lines of activity: Construction of SHLC compatible GIF and hadron irradiation facilities Component Analysis for Detector R&D (gas mixture choices and purification techniques, coolants, detector assembly materials, etc.) M.Capeans, together with C.Rembser for GIF++, lead this WP M.C. 19/8/08

WP7 Background Presentations at the PH Faculty Meeting 15Nov2007 L.Linssen: PH Common R&D Activities Overview http://ph-dep.web.cern.ch/ph-dep/InfoCommunication/FM/FM15Nov07/Linssen.pdf C.Rembser: WP7 Part1 Irradiation Facilities http://ph-dep.web.cern.ch/ph-dep/InfoCommunication/FM/FM15Nov07/Rembser.pdf M.Capeans: WP7 Part2 Component Analysis for Detector R&D http://ph-dep.web.cern.ch/ph-dep/InfoCommunication/FM/FM15Nov07/Capeans.pdf M.C. 19/8/08

WP7: Current Lines of Activity GIF++ Contact: C.Rembser, M.Capeans Upgrade of proton and neutron Irradiation Facilities Contact: M.Moll, M.Glaser LHC RPC Gas Studies at the GIF Contact: R.Guida, I.Glushkov Material Studies and Aging Test Reference Lab Contact: S.Konovalov, M.Capeans http://cern.ch/WP7/ M.C. 19/8/08

WP7 Work Plan 2008 Gas studies at ISR (lab facility) and dedicated GIF set-up Materials DB framework and establish benchmarks (SLHC) Define User Requirements for Upgraded Irradiation Facilities 2009 Consolidation of cost-effective RPC operation parameters for LHC Set-up Reference Aging Lab, collect existing data on materials Preparation and approval of a Technical Design Proposal for Irrad. Facilities (AB Dept) Procurement and Construction Phases of Upgraded Irradiation Facilities 2010 Implement optimal filtering elements in LHC RPC gas systems Deliver Material Books Irradiation Facilities > Target date ‘Ready for Users’: May 2011 Update Material Books Irradiation Facilities > First report of results M.C. 19/8/08

WP7 Detailed Schedule http://cern.ch/WP7/Documents/WP7_Project.pdf M.C. 19/8/08

WP7 H-Resources from PH (2008) M.C. 19/8/08

Outlook Contact with the experiments is very important in order to keep the projects in line with the real needs of these experiments We will organize WP7 regular meetings (4 per year) to update you and interact – so we rely on you taking an active role in defining directions and priorities M.C. 19/8/08

Agenda of Today M.C. 19/8/08

Possible Agenda for the next meeting (~3 months) Progress on RPC gas studies Report on contacts with experiments to contribute to Materials Database Irradiation Facilities A possible GIF++ by AB Recycling old GIF components and Procurement Plan of New Infrastructure for GIF++ Cost Estimates M.C. 19/8/08

White Paper Theme 3 R&D M.C. 19/8/08