Module roadmap to end of 2017

Slides:



Advertisements
Similar presentations
Two Beam Module Thermo-mechanical tests Elena Daskalaki Alex Vamvakas Athanasios Zelios.
Advertisements

MODULE TRANSPORT CLIC Module Working Group 27 September 2010 Keith Kershaw CERN EN-HE.
Alignment of DB and MB quadrupoles Hélène MAINAUD DURAND 17/11/2011 With a lot of input from Sylvain GRIFFET.
LCWS12, 25/10/ CLIC two-beam module development Status and future plans G. Riddone Outlook Short introduction CLIC Module Validation program Future.
TMM of the CLIC Two-Beam Module T0 in the LAB – Proceedings to structural FEA Riku Raatikainen
Influence of the Gravity, Vacuum and RF on CLIC Module T0 Behavior R. Raatikainen.
1 Presented at ColUSM by D. Ramos on behalf of the Cold Collimator Feasibility Study Working Group Longitudinal.
Mechanical design, analysis and integration of pre-alignment systems for CLIC M.Anastasopoulos / BE-ABP-SU.
Large-capacity Helium refrigeration : from state-of-the-art towards FCC reference solutions Francois Millet – March 2015.
Status of vacuum & interconnections of the CLIC main linac modules C. Garion TE/VSC TBMWG, 9 th November 2009.
H. MAINAUD DURAND, on behalf of the CLIC active pre-alignment team CLIC ACTIVE PRE-ALIGNMENT STUDIES: STATUS FOR CDR AND PROSPECTS FOR TDR PHASE.
«BE-RF-PM» Updates on thermal tests for CLIC prototype module type 0 Ioannis Kossyvakis, Roberto Mondello, Fabrizio Rossi.
CTC, Two-beam module program (WP CTC-004) CLIC Modules (boundary conditions, technical system design and integration) CDR modules Prototypes.
1/12 Sylvain GRIFFET, 17/10/2011 BE/ABP-SU/ Simulations of laser tracker AT401 measurements on TM0 CLIC girders EDMS Document No
Status of: CLIC Two-Beam Module Magnets R&D and Procurement 1 Michele Modena, CERN TE-MSC IWLC10, WG8, 21October 2010.
NLC MAC Meeting 6-8 Nov Linac Girder Studies and Plans C. Boffo Slide 1 Linac Girder Studies and Plans C. Boffo – E. Borissov – H. Carter Fermilab,
06-November-2013 Thermo-Mechanical Tests BE-RF-PM Review of the CLIC Two-Beam Module Program Thermo-Mechanical Tests L. Kortelainen, I. Kossyvakis, R.
1 Updates on thermal tests Updates on thermal tests F. Rossi September 5, 2012.
1 Status of the CLIC two-beam module program A. Samochkine, G. Riddone Acknowledgements to the Module WG members 4 February 2014 CLIC Workshop 2014 (3-7.
TBL as a 12 GHz power source, overview and first results from commissioning IWLC 2010 workshopSteffen Döbert, BE-RF  Current status of TBL  Status of.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
Discussion points TBM meeting 23/09/2015. Updates Global 3D assembly updated, no severe problems/clashes T1 RF network dimensions updated WPS arms machined.
Dmitry Gudkov BE-RF-PM CLIC Module Working Group Engineering design of the adjustable supporting system for DBQ.
CTC, Outcome from Two-beam Module Review on15/ G. Riddone,
CLIC08 workshop CLIC module layout and main requirements G. Riddone, on behalf of the CMWG Home page of the TBM WG:
CLIC Module meeting, 22/08/2011 N. Chritin (EN/MME) Cradles design for CLIC module supporting system (EDMS )  General principle  Main inputs an.
CLIC Module WG 20/07/2009 H. MAINAUD DURAND, BE-ABP/SU Pre-alignment system and impact on module design.
1 Thermal tests planning for mock-up TM0 Thermal tests planning for CLIC prototype module type 0 May 30th,
CLIC Workshop th -17 th October 2008 Thomas Zickler AT/MCS/MNC 1 CLIC Main Linac Quadrupoles Preliminary design of a quadrupole for the stabilization.
«BE-RF-PM» CLIC prototype two-beam modules Thermal test planning G. Riddone, F. Rossi Introduction Thermal tests 1.Environment 2.Heating and.
CLIC two-beam modules TEST modules final schemes Dmitry Gudkov BE/RF CLIC Module Working Group.
cern.ch 1 A. Samoshkin 28-Feb-2011 Progress on CDR module design.
Updated Thermo-Mechanical Model of the CLIC Two-Beam Module Riku Raatikainen
1 Thermal tests planning for mock-up TM0 Thermal tests planning for CLIC prototype module type 0 July 17,
«BE-RF-PM» CLIC prototype two-beam modules Thermal test planning Fabrizio Rossi.
JRA on Development of High Temperature SC Link Motivation Work Packages Partners & resources Amalia Ballarino Esgard open meeting CERN,
CLIC module Experimental program for module array Module review, June 22 nd 2015Elena Daskalaki, BE-RF-MK.
Fiducialisation and initial alignment of components for CLIC Mateusz Sosin on behalf of the CLIC active pre-alignment team CLIC Workshop 2015.
cern.ch CLIC MEETING (17-Dec-2010) CLIC TWO-BEAM MODULE LAYOUT (short introduction) BE / RF 1.
Peak temperature rise specification for accelerating structures: a review and discussion CLIC meeting
CLIC activity of R.Raatikainen Feb 20121R.Raatikainen BE-RF-PM Main tasks  Thermo-mechanical modeling of the CLIC/LAB two-beam modules 
CLEX TBM T0 Cooling system Design strategy 1 V. Soldatov, A. Vamvakas, BE-RF
SPL cryomodule specification meeting, CERN 19th October 2010 SPL cryomodule specification: Goals of the meeting SPL cryomodule specification: Goals of.
Epument Girder simulation and Module Showroom upgrade For CLIC meeting 2015 Petri Tikka, Helsinki Institute of Physics focusing on exploring the possibilities.
H. MAINAUD DURAND on behalf of the CLIC active pre-alignment team Status on CLIC pre-alignment studies.
Development of Cryo-Module Test Stand (CMTS) for Fermi Lab (R.L.Suthar, Head,CDM, BARC) Cryo-Module Test stand (CMTS) is a very sophisticated equipment.
Status of the CLIC module R&D G. Riddone on behalf of the CLIC module WG (special contributions from A. Samoshkin, D. Gudkov, A. Solodko, N. Gazis)
Two-beam module layout
S A Griffiths CM42 June 2015 Electrical & Control.
Ad-hoc Transportation test of «CLIC module»
Bruno POTTIN, Anne-Catherine CHAUVEAU
S1G Experiment Schedule Plan
Cryomodule test stand at ESS site
TEST MODULE WG Cradles for CLIC module supporting system
Alignment methods developed for the validation of the thermal and mechanical behavior of the Two Beam Test Modules for the CLIC project Hélène MAINAUD.
Thermal-Structural Finite Element Analysis of CLIC module T0#2
Thermal-Structural Finite Element Analysis of CLIC module T0#2
CLIC Common RF-girder study
Thermal review of CLIC module
SPS cryogenic proximity equipment and SM18 validation
The path to a new CLIC main-linac module
List of changes and improvements for the next generation CLIC module
XFEL Vacuum System Commissioning
CLIC: from 380 GeV up to 3 TeV Will also study klystron based machine for initial stage.
TBM thermal modelling status
Installation plan for LAB modules
LCWS 2017 – 26th October C. Rossi
Experimental program for module array
Advanced Research Electron Accelerator Laboratory
Thermal test (lab modules)
Presentation transcript:

Module roadmap to end of 2017 The coffee drinkers

Work to be done until end of year New DB Module layout work New K Module layout work Heat to air study Thermal tests Sara’s breakdown compensation method Documentation of current T0#2 and T1 design changes with respect to CDR design T0#1 as CLIC note

Layout summary Rejected ‘rigid’ solution All are feasible in principle PETS DBQ 2x SAS Layout summary Adjustable in assembly hall Rigid PETS DBQ 2x SAS Rejected ‘rigid’ solution All are feasible in principle Main considerations for comparison coming from lifecycle considerations: Transportation Effort (cost/time) of installation in the tunnel RF phasing Cost of actuators/controls T1-T2 compatibility Adjustable in the tunnel “2m module” PETS DBQ 2x SAS “common RF girder” “1m module” PETS DBQ 2x SAS

New DB Module layout work Finish design of “2 DoF support box” Manufacture and test “2 DoF support box” Continue exploring and conclude on designs for common RF girder Implementation into real machine: wire, magnet support, SAS interface, virtual articulation point? Manufacture common RF girder? 2m option, start discussing how the “support structure” (girder + actuators) should look like: wire implementation, in tunnel alignment options Generic open questions: cooling and vacuum design, vacuum valves (sectorization every 2 m? for e.g. module interconnection), structure interconnection, Validate or discard: Klystron lattice (-> important for common RF girder and “1m module”) “1m module” itself useful? Explore further importance and technical implementation of RF phasing Write CLIC note documenting thinking/decision taking process (can be the first part of final deliverable in 2018)

New K Module layout work Options from DB version narrow down Validate and conclude Longitudinal positioning implementation Implementation of auxiliary systems Implementation of survey system

Heat to air study CFD simulations Upgrade hard- and software of lab for better controlled test: Flow meter and temp sensor for climatisation system Flow controller (software) Installation of load heaters and measure the “entire system” (SAS+RF loads) Simple insulation extended to RF loads and decide if useful -> if useful then properly design insulation Study of local micro climatisation station together with C&V Study potential insulation for entire module (lid or cover)

Thermal tests Cooling system compensation of thermal effects in AS (based on flow OR temp) continuation of Sara’s work Thermal-structural FEM Survey campaign static Temp and vacuum ? Transients Chocke mode flange study

Sara’s breakdown compensation method Assess the relevance of this w.r.t. the current breakdown recovery method Assess feasibility of having proportional valves for each AS Question overall cooling layout for module (e.g. loads in series of AS)