Jon Risgaard, Wastewater Branch Rick Bolich, Raleigh Regional Office

Slides:



Advertisements
Similar presentations
This presentation is an abbreviated version of the original PowerPoint presentation of June 23, This version was presented at the Commissioners’
Advertisements

The WQCD Permitting Perspective Janet Kieler Permits Section Manager.
LEE COUNTY UTILITIES DIVISION Integrated Water Resources Master Plan
Groundwater Management Jason Moeckel Minnesota DNR Division of Ecological and Water Resources.
David K. Paylor Director, Department of Environmental Quality May 27, 2014 VEDP Lunch & Learn Environmental Permitting 101.
Springs Protection Options Septic System Evaluation Program Board of County Commissioners Meeting November 13 th 2012.
Practice – CP-39 Farmable Wetland Program Constructed Wetland.
Montana’s 2007 Nonpoint Source Management Plan Robert Ray MT Dept Environmental Quality.
Lee County Government Division of Natural Resources TMDL/BMAP Update TMDL/BMAP Update November 30, 2010 Roland Ottolini, Director Lee County Division of.
Pine Valley Country Club Stream Restoration: Phase 2 Proposal Presented March 17, 2003 Greg Jennings, NC State Univ Barbara Doll, NC Sea Grant Dave Bidelspach,
Nutrient Trading Framework in the Coosa Basin April 22, 2015.
Determining the effectiveness of best management practices to reduce nutrient loading from cattle grazed pastures in Utah Nicki Devanny Utah State University,
Point Source POLLUTION: CAUSES AND CONSEQUENCES
An Analysis of the Pollutant Loads and Hydrological Condition for Water Quality Improvement for the Weihe River For implementing water resources management.
Equus Beds ASR Program – Wichita’s Future Water Supply September 6, 2012.
Chris M. Kapheim General Manager May 5, AID Groundwater Map.
COUNTRY PAPER ON REUSE OF LOW QUALITY WATER IN EGYPT.
Table 3 SWMI – Water Matters –Topics – 1Dangerous Substances 2Forestry 3Septic Tanks (Unsewered Properties) Shannon International River Basin District.
Todd Ambs Water Division Administrator, WDNR October 26, 2009 Sustaining the Water Belt of North America.
WATERSHED PERMITTING IN NORTH CAROLINA NPDES PERMIT NCC BECAME EFFECTIVE JAN 1, 2003 NEUSE RIVER COMPLIANCE ASSOCIATION MORRIS V. BROOKHART, P.E.
The Water Cycle Also called the hydrologic cycle Describes the continuous movement of water on, above, and below the surface of the Earth The balance of.
Icicle Creek Salmon Habitat Conditions* Land Development has affected stream channel movement, off channel habitat, and LWD recruitment. Barriers to migration.
2008 Facility Plan Update May Purpose  Comprehensive Plan through 2033 –Builds on Past Work –Adjust for Changing Conditions  Identify Capacity,
Short and Long Range Water Supply Planning and Aquifer Performance Test (APT)
Orange County Board of County Commissioners Update on USEPA Rulemaking for Numeric Nutrient Criteria Utilities Department January 26, 2010 Utilities Department.
Lake Jesup BMAP Adoption Environmental Protection Division February 23, 2010.
Neuse River Basin Provided by Dr. D. Monreau to Dr. G
Wastewater Treatment Plant # 2 Engineering Services Council Workshop July 8, 2014.
Michigan’s Nonpoint Source Program Pass Through Grant Funding Past, Present, and Future Outlook Bob Sweet Past Aquatic Biologist, Present Administrative.
7th Avenue and Bethany Home Road Water Quality Assurance Revolving Fund Site February 19, 2013.
COG staff - Presentation to WRTC September 6, 2013 COG’s Round 8.2 Cooperative Forecast & Regional Wastewater Flow Projections.
Solving Water Pollution Problems in the Wakulla Springshed The City of Tallahassee’s Efforts to Reduce Stormwater Pollution Hydrogeology Workshop May 12-13,
ECan approaches to managing nutrient losses to groundwater.
Water Quality Rulemaking in Response to S.L
Melissa Boggs California Department of Fish and Wildlife, Office of Spill Prevention and Response.
Farmland Industries Lawrence Site Briefing for the City of Lawrence March 11, 2008 March 11, 2008.
PORT OF TACOMA. [Insert Project photo as background] Project Update Parcel 88 Combined Habitat Project.
Miami-Dade Water & Sewer Department Miami-Dade Water and Sewer Department |  1   Reuse, Every Drop Has Value Seminar FPL JPA.
Riparian Buffers for Water Resource Protection Michael R. Burchell II Associate Professor and Extension Specialist Department of Biological and Agricultural.
Evan Kane, DWR Ken Pickle, DEMLR Jon RisGAARD, DWR
Update on PI Modeling and Nitrogen Removal at Blue Plains
It’s The Final Countdown To The Mid-point Assessment:
Indian Wells Valley Groundwater Basin
Dave Clark and Michael Kasch
L-THIA Online and LID Larry Theller
Department of Environmental Quality Division of Mitigation Services
Amendment to the Cooperative Agreement with Elsinore Valley Municipal Water District for Upper Temescal Valley Salt and Nutrient Management Plan Jayne.
CITY OF MARSHALL CHLORIDE ISSUES September 26, 2017
MACo Winter Conference
Welcome.
Updates 2014 Tar-Pamlico River Basin Plan
Anne Arundel County Maryland
Water Quality Rulemaking in Response to S.L
Request for a Major Variance from the Neuse River Riparian Area Protection Rules    Harshavardhan Tummalpally 5201 Trinity Road Raleigh, NC January.
Point Source Perspective Progress of Neuse Nutrient Management Strategy January 12, 2012 EMC Meeting Presented by: Lower Neuse Basin Association® Neuse.
CITY OF MARSHALL CHLORIDE ISSUES NOVEMBER 22, 2016
Big Sky Wastewater Facility Plan Update
Request for a Major Variance from the Neuse River Riparian Area Protection Rules    Jeffrey Gunter 7701 Greentree Court Raleigh, NC March 12, 2014.
Water Quality Trading Advisory Committee MDA Headquarters
Water Quality Trading Advisory Committee MDA Headquarters
Department of Environmental Quality Division of Mitigation Services
October 29, 2018 Terry Lauritsen, P.E.
Background Broward County currently operates a 10 MGD reuse facility located at the North Regional Wastewater Treatment Plant. Customers include commercial,
County Water Resources Programs in the Santa Margarita Basin
High Rock Lake TMDL Development
2013 CCPCUA Assessment Central Coastal Plain Capacity Use Area
Environmental Management Commission January 2014
Agriculture & Environment
Precedential Developments in Regulation of Agricultural Lands
Agricultural Order 4.0 Discussion
Presentation transcript:

Jon Risgaard, Wastewater Branch Rick Bolich, Raleigh Regional Office Summary of City of Raleigh, Neuse River WWTF Five-Year Evaluation of Variance From Groundwater Regulations Groundwater and Wastewater Committee Informational Item July 8, 2015 Jon Risgaard, Wastewater Branch Rick Bolich, Raleigh Regional Office

City of Raleigh’s Neuse River WWTP Background City of Raleigh’s Neuse River WWTP Located at 8500 Battle Bridge Rd., Raleigh, NC Maximum capacity of 60 mgd has an NPDES discharge permit, non-discharge permit (residuals and spray irrigation of reclaimed water.

Neuse River Wastewater Treatment Plant Site Map NPDES Outfall Brownfield Road Mial Plantation Road The Neuse River Wastewater Treatment Plant is located in southeastern Wake County. The property is bounded by the Neuse River to the north and east and by Old Baucom Road, Mial Plantation Road, Shotwell Road, and Battlebridge Road Old Baucom Road 2005

1980 – City began residuals application. Background 1980 – City began residuals application. Currently have 1,439 acres permitted for land application Groundwater monitoring revealed nitrate concentrations above 02L standard beyond the compliance boundary in several wells. Raleigh paid $73,936 fine in 2002 for over-application of residuals leading to groundwater quality violations beyond compliance boundary & suspended residuals application.

Background NCAC 02L .0106 Requires “active treatment” of groundwater contamination beyond compliance boundary The EMC approved Raleigh’s variance request in 2009, allowing monitored natural attenuation for groundwater. Deduct estimated excess groundwater nitrate concentration from NPDES permit allocation. Evaluate the effectiveness of overall remediation strategy every 5 years

5- Year Variance Report Elements of Approved Groundwater Remediation Strategy: Groundwater Containment System; Monitored Natural Attenuation with Nitrate Debit to NPDES Outfall Permit; Constructed Subsurface Flow Treatment Wetlands; and Off-site Riparian Buffer Restoration.

5- Year Report Monitored Natural Attenuation Alternatives Variance requires evaluation of treatment strategy to determine if additional treatment technologies are feasible. The report evaluated three additional remedial alternatives to MNA including: Enhanced in-situ Biodenitrification Enhanced Flushing Phytoremediation methods. The report shows that these treatment technologies are either not feasible for the site or are cost-prohibitive.

5- Year Report Groundwater Containment System Groundwater capture and containment system for fields 50 and 500. Prevent the migration of groundwater to decommissioned private water supply wells. Groundwater containment system captured estimated 100% of the groundwater emanating from field 500 and 50% for field 50. Year Flow to NRWWTP (Million Gallon) Average NO3 in Flow to NRWWTP (mg/l) NO3 to NRWWTP (lb) 2008 6.73 31 1,756 2009 11.71 26 2,558 2010 13.63 29 3,245 2011 12.89 3,168 2012 13.34 3,172 2013 15.53 27 3,467 2014 1.31 28 305 Total 75.15   17,670 Provided by City of Raleigh

Constructed Subsurface Flow Wetlands 3 wetland cells Approved variance predicted removal of 28,500 to 42,800 pounds of nitrogen annually The three wetlands removed approximately 1,000 lbs (total) of nitrogen since constructed. Nitrogen concentrations in the stream have declined faster than had been expected. Provided by City Of Raleigh

5- Year Report Off-site Riparian Buffer Restoration Restoration of Butlers Branch site in Craven County, NC (Completed in 2010) Removal of nonpoint sources of pollution associated with agricultural practices Reduction of sediment and siltation within on-site and downstream receiving wasters Promotion of floodwater attenuation, and Providing terrestrial wildlife habitat Estimated 4,191 pounds of nitrogen offset per year.

5- Year Report Monitored Natural Attenuation Monitored Natural Attenuation (MNA) is the remediation activity for the remainder of the site Includes triennial sampling of 73 monitoring stations. Trend directions and magnitudes for all monitoring stations are shown in the 5-year report (page 28). Monitoring results used to evaluate predictive model of groundwater flows to Neuse River, and Nitrogen debits in NPDES permit.

5- Year Report Monitored Natural Attenuation Monitored Natural Attenuation (MNA) Updated Model to improve accuracy based on: Refining the model grid from 60x60 feet to 20x20 feet. Additional Nitrate sampling results at various depths Water percolation from the soil zone Nitrate fate and transport in the vadose zone The report concludes that MNA shows reducing nitrogen concentrations at and within the compliance boundary

5- Year Report Monitored Natural Attenuation Predicted N Load to Neuse River (in Excess of 10 mg/l ) Debit in NPDES Permit (lb/yr) Variance Model (lb/yr) Updated Model (lb/yr) 2008 115,402 75,576 120,058 2009 111,748 76,958 117,183 2010 107,719 77,791 114,246 2011 103,487 77,671 110,370 2012 99,146 77,602 106,196 2013 94,804 76,878 102,022 2014 90,462 75,172 97,549 2015 86,186 73,807 93,276 2016 82,020 71,956 89,002 2017 77,965 69,744 84,828 2018 73,954 67,490 80,754 2019 70,119 64,856 76,679 2020 66,350 62,734 72,803 2021 62,691 60,459 69,026 2022 59,165 57,804 65,250

5- Year Report Monitored Natural Attenuation Predicted N Load to Neuse River (in Excess of 10 mg/l ) Debit in NPDES Permit (lb/yr) Variance Model (lb/yr) Updated Model (lb/yr) 2008 115,402 75,576 120,058 2009 111,748 76,958 117,183 2010 107,719 77,791 114,246 2011 103,487 77,671 110,370 2012 99,146 77,602 106,196 2013 94,804 76,878 102,022 2014 90,462 75,172 97,549 2015 86,186 73,807 93,276 2016 82,020 71,956 89,002 2017 77,965 69,744 84,828 2018 73,954 67,490 80,754 2019 70,119 64,856 76,679 2020 66,350 62,734 72,803 2021 62,691 60,459 69,026 2022 59,165 57,804 65,250 Note - The updated model predicts higher N load to Neuse River than the variance model starting in year 2024 and beyond.

5- Year Report Monitored Natural Attenuation Provided by City Of Raleigh

5- Year Report Monitored Natural Attenuation -- Variance Model Provided by City Of Raleigh

5- Year Report Monitored Natural Attenuation – Updated Model Provided by City Of Raleigh

5- Year Report Monitored Natural Attenuation Provided by City Of Raleigh

Permitted Total N Allocation to Neuse vs. Discharge and Debit in Permit Provided by City Of Raleigh

Staff Assessment Remediation activities appear to be working as intended based on 5 yrs worth of data. Support continued monitoring and evaluating the current corrective action plan and variance using current monitoring wells and surface water sampling locations. Support continued monitoring and evaluating the groundwater containment system. Support continued use of the original debit schedule from the September 2010 approved Corrective Action Plan for the next NPDES permit cycle (to be issued from 2015 to 2020) Use the 2019 Five-Year Evaluation to further verify the groundwater model and establish debits schedule for NPDES permits beyond 2022.