Waste Planning Case Studies Exeter Energy from Waste Facility
Warming Up the Planning Committee Political Dimension Policy Context Member Training
The Planning Process Transparency Site Visit Site Meeting
Addressing the Planning Issues Traffic and Transportation Issues Air Quality Landscape and Visual Impact Ecology and Appropriate Assessment Flood Risk Noise and Vibration
Mitigation – Planning Conditions landscaping; control of noise and dust; external lighting; a Construction Environmental Management Plan; a Piling Method Statement; hours of working for construction and operational periods; acoustic treatment of the plant; Details of the design of the facility to ensure that it will not be damaged by flooding; the archaeological survey and recording of the site; the materials to be used in the construction of the plant building; no operation of the plant until a contingency plan is in place in the event of breakdown or closure to deal with the waste material delivered to the site
Legal Agreement Use of Wastes Arising from Exeter Area only Use of Waste heat Incinerator Bottom Ash Travel Plan
Delivering the Development Discharge of Planning Conditions Non Material Amendments Site visits during construction from Committee Liaison Group set up before construction
Lessons Learnt?