Jack Fowler Duke University Spain Workshop

Slides:



Advertisements
Similar presentations
Seog Oh/ Duke University/June, 2003 TRT/ ATLAS week at CERN Duke Production Status.
Advertisements

Chiho Wang ATLAS TRT Duke University Hampton, May Xe-CO 2 Stability Chiho Wang Duke University.
Sputter Stand Safety Specifics Electrical Hazards High Voltage : Electrical power is required for the high voltage supply, gauging, system controller and.
Chiho Wang ATLAS TRT Istanbul Workshop Duke University May, Module Gas Leak Chiho Wang Duke University.
TRD Status meeting IKFClemens Adler TRD ROC Status -Dubna -Bukarest -GSI -Frankfurt -Heidelberg.
4/25/2006 Puneeth Kalavase, UC, Santa Barbara On behalf of US Tracker Outer Barrel group Construction and Testing of CMS “Rods”
Summary of Fuse Testing for Barrel Module Fuse Boxes Duke University Jack Fowler.
Chiho Wang ATLAS TRT Duke University Dubna, May Fuse Box Production Chiho Wang/Jack Fowler.
Seog Oh/ Duke University/September, 2003 TRT Workshop/ Peniscola, Spain Duke TRT Progress.
Integration GlueX Detector Integration Mission: To ensure systems meet or exceed physics driven goals To ensure that detectors are designed in a sensible.
May’02, TRT Workshop Jack Fowler – Duke University SEM Analysis of Radiation Test Samples at Duke University Jack Fowler.
Chiho Wang ATLAS TRT Duke University CERN, Feb TRT Barrel assembly status & schedule Feb. 9, 2005.
Chiho Wang TRD Conference Duke University Bari, Sep Design and Construction of the ATLAS Barrel TRT Chiho Wang Duke University.
W. EbensteinDOE Review Duke UniversitySeptember 1999 TRT Barrel Cooling: Electronics  Motivation: u Overheating of electronics causes premature failure.
Construction and quality control of the end-cap Transition Radiation Tracker for the ATLAS experiment Vasiliki A. Mitsou CERN HEP 2003, April, Athens,
Chiho Wang ATLAS TRT Duke University CERN, Feb Fuse Box Status Chiho Wang Duke University.
Seog Oh/ Duke University/June, 2003 TRT/ ATLAS week at CERN Status of Gain Mapping at Duke.
TRT workshop Argon Xenon mix stability Kramarenko Viktor Vorobev Konstantin 10/12/2015.
Seog Oh/ Duke University/Oct, 2002 TRT/ ATLAS week at CERN Wire-Joint Production Stringing Status.
V. Cindro, Jožef Stefan Institute, Ljubljana, Slovenia DAQ, DCS, Power Supply and Cables Review CERN, March Electrical PP1 Basic features Electrical.
W. Ebenstein Duke University Barrel Cooling  Thermally Conductive Epoxies: (samples sent to Anatoli) Vendor : Epoxies, etc. (Cranston, RI)  :
May 2001, Istanbul Workshop High Voltage Plates and Capacitor Status Jack Fowler.
Jack Fowler Spain Workshop 2003 Faraday Shielding for Barrel TRT Jack Fowler Duke University Spain Workshop
The LHCb Outer Tracker Front End, what does it look like and what is the status Talk for the LHCb Electronics Working Group /TS A Collaboration.
LNF activities on WPC Panels Construction of prototypes and layout Status of tooling Proto 0, open items, plan,...
G. PassalevaRoma - July 28, 2004 Status of MWPC production site in Florence G. Passaleva.
Chiho Wang Duke University 1 TRT Barrel integration Status / Schedule Chiho Wang.
Feb ’02, TRT Meetings Jack Fowler – Duke University SEM Analysis of Wire from Aging Test #5 Jack Fowler.
9 March 2005OT Meeting - LHCb week - Production and QA, Niels Tuning 1/19 Outer Tracker Module Production at NIKHEF Produced 60 modules  Production Progress.
4-Jan-16S.Movchan Straw manufacturing and QC1 Straw tracker manufacturing procedure Dubna: assembly halls procedure conclusion Presented by S.Movchan.
Production Readiness Review at PNPI Chamber assembling: Main production and quality control steps 30 January 2004 – G.Alkhazov 1.Input components control.
W. Ebenstein Duke University Barrel Pressure Drop Measurements  Purpose: u Measure pressure in module due to purging gas flow u Module could bulge if.
LAV construction: Status and overview Matthew Moulson (Frascati) for the LAV Working Group NA62 Photon-Veto Working Group Meeting Brussels, 8 September.
May’02, TRT Workshop Jack Fowler – Duke University SEM Analysis of Wire from Aging Test #7 at Duke University Jack Fowler.
ATLAS TRT Duke University CERN, Feb Barrel Capacitors  With socket and bent pin, forms capacitor assembly  Duke supplies capacitors, Hampton assembles.
Seog Oh/ Duke University/Oct, 2002 TRT/ ATLAS week at CERN Test of the cleaning gas mixtures.
Quality Control QC is taken very serious QC Document for Tube Production QC Document for Module Assembly QC Document for Installation.
Chiho Wang ATLAS TRT Krakow Workshop Duke University May, HV Plate Design & Assembly Chiho Wang Duke University.
Pressure Cure Oven (PCO)
26-Feb-16S.Movchan Straw manufacturing and QC1 Dubna NA62 straw tracker assembly area (milestone) halls plans conclusion Presented by S.Movchan.
CMS Upgrade Workshop, FNAL, Oct 28-30, O.Prokofiev Update ME4/2 Chambers and Tooling A construction of new ME4/2 prototype at CERN Factory tooling,
HV Cable and Snout Conflict: Problem and Possible Fix James Mott g-2 Tracker Meeting 02/25/16.
Chiho Wang ATLAS TRT Barrel Duke University U. Penn. Workshop, 2000 Module Thermal Analysis Chiho Wang Duke University.
Chiho Wang ATLAS TRT Duke University CERN, Sep Barrel integration status.
Chiho Wang Technical Training Duke University May, Stringing 101 Chiho Wang Duke University.
L. M. Pant1 RE Workshop, 19/11/12 Validation of RE4 Cu cooling systems for mass production Validation of RE4 Cu cooling systems for mass production L.
Chiho Wang ATLAS TRT Duke University CERN, Feb Gas-Flow Measurements Chiho Wang Duke University.
QXF Reaction / Impregnation Fixtures J. Schmalzle 4/9/13.
ATLAS TRT Duke University CERN, Feb Fuse Box Status Duke University.
Chiho Wang ATLAS TRT Duke University Dubna, May Barrel integration status May 24, 2005.
The drift chamber with a new type of straws for operation in vacuum
QXF Coil Fabrication & Tooling Reaction / Impregnation
Wire Quality Jack Fowler.
Dept. of Physics and Space Sciences, Florida Institute of Technology
Acceptance test at Duke
new straw end plug: D=10.6 mm straws support frame Levan option
BSS Prep work at CERN and Acceptance of Parts
Update on He3 Services design since the ORNL meeting
Summary of Fuse Testing for Barrel Module Fuse Boxes
Structure and etc Shoji Uno (KEK) at B2GM
Barrel TRT Module Cooling
Mini-drawers, FE-ASIC , Integrator
Summary of Fuse Testing for Barrel Module Fuse Boxes
Module Production and Testing at Duke
Safe Debris Burning Screen Metal container Hose & rake
Wire Diameter Variation
SEM Analysis of Wire from Aging Test #7 at Duke University
Test of the cleaning gas mixtures.
Limited Streamer Tube Project Summary
US-HiLumi – Shipping Post Assembly Status
Presentation transcript:

Jack Fowler Duke University Spain Workshop - 2003 Duke Modules Final QA Jack Fowler Duke University Spain Workshop - 2003

Final Mechanical Completion Steps Stringing – HV and Tension Test All wires draw less than 10 uA at 1.7 kV in room air Tension 128 to 170 Hz Complete through M2.36 and 3.30. ~ 800 wires left to string Ground Wire Solder to Tension plate and epoxy to shell Complete through M2.34 and 3.30 Sealing Modules Seal all eyelets and fill all shell holes with epoxy Complete through M2.33 Dimension Test Module fits length and stay clear fixtures. Module Weight Completed as modules are shipped to Hampton University Jack Fowler Spain Workshop 2003

Final QA Testing HV Testing /Current prior to Signal Test Ar-CO2 and Air All wires hold 1600 V Currents typically 200nA Complete thru M2.30 and 3.30 Ionization Leak Test Current spec < 1 mbar /bar/min Old Spec < 0.1 mbar/bar/min Complete thru M2.25 and 3.28 Purging Volume Leak Test < 200 mbar/bar/min Signal Test Ar-CO2 at 1550 V Complete through 2.30 Jack Fowler Spain Workshop 2003

Module Weight Type 2 Modules Type 3 Modules Average weight = 4260 grams Sigma = 48 grams Type 3 Modules Average weight = 6492 grams Sigma = 57 grams Jack Fowler Spain Workshop 2003

Ionization Leak Test Results Jack Fowler Spain Workshop 2003

Purging Volume Leak Results Jack Fowler Spain Workshop 2003

Mechanical and HV Discrepancies Capacitor barrel leaks 4 modules Cooling sleeve tears 3 modules Shell extending beyond boundaries 17 modules HV Trips (to neighbor groups) 10 modules Shorted HV Groups to each other 4 modules (but none to Shell!!!) Jack Fowler Spain Workshop 2003

Wire/Straw Discrepancies Wire shorted to straw Wire impossible to string Wire left inside straw Straw leaks Noisy wires at Signal Test Socket/Eyelet not connected Wire anomaly from Gain Map Jack Fowler Spain Workshop 2003

Wire/Straw Status “DEAD” straw Cannot hold HV Leak Impossible to string “REMOVED” but can be restrung and tested at CERN 154 “AS IS” but will be retested or restrung at CERN 154 Jack Fowler Spain Workshop 2003

Module 2.20 Jack Fowler Spain Workshop 2003

Module 2.23 Jack Fowler Spain Workshop 2003

“AS IS” Wires and Straws Jack Fowler Spain Workshop 2003

“REMOVED” Wires and Straws Jack Fowler Spain Workshop 2003

“DEAD” Wires or Straws Jack Fowler Spain Workshop 2003

Summary of Modules All modules are functional No major defects on any of the modules 0.56 % of the straws have any issues, as is, removed and dead (107 out of 19071) 0.13 % are Dead leaving DUKE (25 out of 19071) All will be complete and shipped to Hampton in 2003! Jack Fowler Spain Workshop 2003