Survey Lead – Pier Valitutti Presented by – Nader Afshar

Slides:



Advertisements
Similar presentations
ASYCUDA Overview … a summary of the objectives of ASYCUDA implementation projects and features of the software for the Customs computer system.
Advertisements

Defining Decision Support System
STEPPING STONE PROJECT STEPPING STONE PROJECT designing a new engineering discipline presented by team 1.
Monash University, SIMS, Semester One, DATA GATHERING FOR INFORMATION SYSTEMS DEVELOPMENT CSE Information Systems 1 CSE Information Systems.
Law Handbook Online. Project drivers To provide accurate and up to date information at low cost We had an existing site that was unsatisfactory and inefficient.
EPICS Meeting, APS, June 14 th 2006 MCS-8 The 8 axes motion control system Rok Šabjan
CIS 321—IS Analysis & Design Chapter 4: Analysis— Investigating System Requirements.
Chapter 5: Requirement Engineering Process Omar Meqdadi SE 2730 Lecture 5 Department of Computer Science and Software Engineering University of Wisconsin-Platteville.
Feasibility Study.
Data Gathering Techniques 27 th February Data Gathering Techniques System requirements specify what the system must do or what property or quality.
Business Analysis. Business Analysis Concepts Enterprise Analysis ► Identify business opportunities ► Understand the business strategy ► Identify Business.
The System Life Cycle The systems lifecycle is the set of stages that are followed when developing an information system.
Digital Libraries1 David Rashty. Digital Libraries2 “A library is an arsenal of liberty” Anonymous.
Esri UC2013. Technical Workshop. Technical Workshop 2013 Esri International User Conference July 8–12, 2013 | San Diego, California ArcGIS for Law Enforcement:
Chapter 8 Final Construction Final construction in the SDLC Construct and test programs Construct and test the database Obtain additional hardware Prepare.
Human Resources. Learning. Audits. Coaching Peppermint consultants Pty Ltd Level 4/150 Albert Road, South Melbourne, Victoria, Australia, 3205 Phone- 03.
Electrical Engineering for NSS - Status and Planning- Thomas Gahl Electrical Engineering Group Leader February 26, 2014.
Windows 10 Tech Support Call On Windows 10 the latest product updates from Microsoft providing a lots of easy facilities to the It professionals.
4 Chapter 4: Beginning the Analysis: Investigating System Requirements Systems Analysis and Design in a Changing World, 3 rd Edition.
Advanced Higher Computing Science
Data Management Program Introduction
Chapter 1 Computer Technology: Your Need to Know
Renovate the Data Center
Exchange around motion control in radiation facilities
Fabrizio Fontana and Matteo Martini
Types of information systems (IS) projects
Peter Ingrassia Collider-Accelerator Department 28 October 2014
The New Project Examination
Introduction to Methods Engineering
an effective self assessment system
Chapter 5 Determining System Requirements
Improving the Defect Life Cycle Management Process
Coursework: The Use of Generic Application Software for Task Solution
Marketing Research Aaker, Kumar, Leone and Day Eleventh Edition
Mark Rivers University of Chicago
AF1: Thinking Scientifically
It’s not all about the tool!
CEPT/ECC-ETSI Co-operation Process
Systems Analysis and Design
FEASIBILITY STUDY Feasibility study is a means to check whether the proposed system is correct or not. The results of this study arte used to make decision.
School of EE and Computer Science
Upgrading to Microsoft SQL Server 2014
How to design your corporate website to generate more business.
Information Systems Development
Essentials of Systems Analysis and Design Fourth Edition
Behavior Therapy.
City of Las Cruces Erosion Control Ordinance
How to edit the title slide
An Overview of Software Processes
Identify & Document Client Requirements.
Unit 6: Application Development
Systems Analysis and Design
Software engineering -1
Modern Systems Analysis and Design Third Edition
More on Estimation In general, effort estimation is based on several parameters and the model ( E= a + b*S**c ): Personnel Environment Quality Size or.
Lecture 06:Software Maintenance
ESA's TEC Directorate Asset Management - Present and Future
Modern Systems Analysis and Design Third Edition
United Nations Statistics Division
What is the nature of descriptive measures to gather data?
Chapter 4 Determining System Requirements
Reward and punishment mechanism for research data sharing
Developing a User Involvement Strategy.
Progress in the implementation of RTMCF1 Action Plan.
Modern Systems Analysis and Design Third Edition
QoS Metadata Status 106th OGC Technical Committee Orléans, France
CEng progression through the IOM3
OU BATTLECARD: Oracle Systems Learning Subscription
Standardisation of BRIGHT Beamline Control Systems
Presentation transcript:

Survey Lead – Pier Valitutti Presented by – Nader Afshar Australian Synchrotron Next Generation Motion Controller Selection Information Gathering and Results Survey Lead – Pier Valitutti Presented by – Nader Afshar

Overview Rational for considering a new controller Why we conducted a facility survey What we learned Where we are going from here

Why a next generation controller? The Australian Synchrotron is > 12 years old existing motion control solutions are outdated Currently using a wide range of controller types difficult to support and maintain, requires large spares inventory 8 new beamlines coming over the next 5 years new and advanced motion control capabilities are required Time to plan for the future develop a single, standard, state-of-the-art controller solution solution will remain viable for the 10+ year beamline lifetime can be used for at least 80% of beamline applications simplifies training, maintenance and spares inventory AS is expanding. Standardization process has not been fully enforced and review/upgrading of the existing systems is due. But we are flexible… not that big.

Why a Facility Survey? First step in preparing for the future is to learn from the past! Learn from as much experience as possible Increase our experience base through a synchrotron survey - Develop and distribute a standard questionnaire Follow up with one-on-one interviews to learn - solutions currently in use for simple and complex motion - rationale for the choice of these solutions - pros and cons of these solutions - plans and constraints for future development - any other advice for us based on past experience Collective wisdom. Too much experience or too much opinion

Who was involved? Our beamline scientists and support staff 8 international similar facilities ( ESS, DESY, SOLEIL, NSLS-II, DLS, LNLS, APS, PSI) All 8 facilities agreed to follow-up interviews all discussions were open and honest provided experience-based information we needed greatly influenced our selection process Contributors and details of their contributions must remain anonymous to protect confidentiality General results and trends can be shared

What were the results? Motion control solutions has a broad spectrum From standard commercial solutions (off-the-shelve) To in-house hardware solutions Solutions are often dictated by non-technical considerations History, on-site skills, externally dictated, etc. Simple, open-loop stepper motor applications are most common Controllers must still support closed-loop, DC and BLDC applications Many facilities are looking to the future for new solutions: Some upgrading existing solutions (ie. PMAC -> PowerPMAC) EtherCAT based controllers appear to be a new trend

What advice did we get? Limit the number of different controller types in use Do not change what is already working! Try to enforce standardisation as much as possible 19” rack mount controllers are preferred Provide for two controller options A basic “workhorse” for simple applications An advanced, fully featured unit for more complex applications Gather most advanced requirements, select against these

Where does that leave us? Given the lack of a common solution we decided to use a “green field” approach to select one: Review science cases to determine the motion control capabilities required by new beamlines Derive specifications for a generic “black box” controller that would provide these capabilities and build on past experience Generate a public Request for Information to elicit proposals from as many suppliers as possible for solutions to meet these specifications Evaluate the responses using standard metrics Select (we hope) the solution that best meets our needs

Conclusion… and the road ahead We were seeking a modern motion control solution, which we could adopt and own in collaboration with other facilities. Now we think we need to standardise on a new solution to meet our requirements: User commissionable and lean maintenance for basic applications, powerful and flexible enough for advanced motion systems applications We are calling out for collaborators, any facility that is considering new control solutions We are looking for experienced controls engineers to help implement this solution on the new beamlines

Thank You for Your Attention