Barrel EMC assembling (EDMS DOCUMENT NUMBER /1)

Slides:



Advertisements
Similar presentations
1 HICIAO-Assembly-Procedure Prepared for HICIAO CDR Author: Vern Stahlberger Institute for Astronomy Date:
Advertisements

Honda 450 Installation Manual.
Click on this image to open the full PDF document.
ATD Assembly. ATD Assembly #1 Dewar Assembly #1 Status: Dewar has been completely assembled and vacuum tested. No vacuum leaks were detected on the outer.
CMS ZDC Crane Emergency Payload Removal Procedures This document proposes the viability of using a portable hydraulic actuator Hand crane (Davit crane)
MICE Collaboration Meeting at Frascati, Jun 26~29, 2005 Iron Shield Mounting Design Stephanie Yang.
Tagger and Vacuum Chamber Assembly Procedure. Preassembly of second bottom yokes and poleshoes. a) Install special support. b) Place the second bottom.
1 Acquisition Camera: Troubleshooting Help Vern STAHLBERGER Institute for Astronomy August Comments and Purpose: 1)Images not centered in Acquisition.
Mounting arrangement for the Solid Absorber. This contains mounting arrangement for:- 1. Handling and lifting from manufacturer’s place to RAL; 2. For.
DELTA Quadrant Tuning Y. Levashov, E. Reese. 2 Tolerances for prototype quadrant tuning Magnet center deviations from a nominal center line < ± 50  m.
ZQNA Electrostatic Quadrupoles for ELENA Transfer Lines 1.Conceptual design 2.Performance 3.Engineering details 4.Interfaces 5.Production planning D. Barna,
MUON_EDR-06 (Alignment) Enrique Calvo Alamillo February 28-March 1, 2002 Link Mechanics: Status.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MAP Winter Collaboration Meeting at JLab, Virginia February 28, 2011.
1 Belle II IR 2 Shuji Tanaka KEK Joint Belle II & superB Background meeting 2012//Feb/ 8-9th 1.
모니터 리프트 규격서 (HML-500) Audio & Video System, Display, Conference System.
Perry Lapper Progress. Frame With Actuators Outside Frame.
M. Gilchriese Disk Geometry January 18, M. Gilchriese 2 ATLAS Coordinate System.
Barrel Calorimeter Support Mechanism Two designs are proposed for review –Design1. Individual module (Segment) of the Barrel Calorimeter is placed inside.
ZDC Remote Handling Tool Structure and Force Analysis P. Debbins University of Iowa December 10, 2009.
Shashlyk FE-DAQ requirements Pavel Semenov IHEP, Protvino on behalf of the IHEP PANDA group PANDA FE-DAQ workshop, Bodenmais April 2009.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM29 at RAL, UK February 17, 2011.
LumiCal mechanical & sensors design Wojciech Wierba J.Błocki, E.Kielar, J.Kotuła, K.Oliwa, L.Zawiejski FCAL Workshop, IFJ PAN Cracow,
Status report AHCAL Mechanics Karsten Gadow CALICE Collaboration Meeting KEK, Studies of AHCAL absorber structure stability.
We have to fix the design of the flanges on the 1 st horn frame to which the target support beams are attached.
RICH1 Gas Enclosure Installation. Experimental Area Meeting at CERN on 21st June 2006 Bill Cameron (Imperial College London) on behalf of the RICH1 team.
Mass Simulator Concepts Robert Besuner 12 October 2005.
Kapton module ass. Spacers for pins 3.6 m m 1.25 mm.
Status of Anti project. F. Raffaelli,A. Checchetti,C. Capoccia. INFN CERN, July 14 th, Status of the Anti construction test and schedule. -Status.
SLHC Engineering Upgrade FCAL Remove-Install step by step procedure. Mircea Cadabeschi-University of Toronto March 01,
Port Throttle Solution Does your port throttle drop back when you remove your hand. Here is the fix….and it costs nothing! me with any questions:
IPN Lyon ILD integration April 2015 Jean-Christophe Ianigro & Imad Laktineh - IPN Lyon -
Welcome to KALLER International Distributors Meeting June 14-16, 2011 Workshop 7 Flange Strippers Hose-less Baseplate Hose systems.
T2K Remote Handling T. Sekiguchi (KEK) on behalf of Tada (KEK) 2012/11/10.
Meeting at Chooz PMTs Mechanical support on the Buffer. Updates. Enrique Calvo Alamillo
Magnetized Beam LDRD: Design Tasks February 19, 2016.
Sentek Technologies Joining EnviroSCAN Probes. Probe Components 20-way probe cable connector (special order) Cable spacer (Part No 80015) Probe rods Probe.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
LINAC 4 CCDTL Accelerating Structure SO SO Aluminum foil H = 0,3…0,5 mm Module of CCDTL Accelerating Structure.
A.Ryazantsev, IHEP-Protvino, RussiaPANDA Russia Workshop at Moscow, May 2015 Status on Barrel Mechanics Andrey Ryazantsev on behalf of the IHEP-Protvino.
Radiation Shutter Re-Purposing Roy Preece STFC RAL 18 th December 2014.
BM&N STS ladders assembly in VLHEP
Miscellaneous MEC Topics Mainz, CM September 2016, MEC Session J
Annex 4 - Moving Frame and Whiffletree assembly
Instructions for Diaphragm Replacement Cat. Nos. 2052B-01, 2054B-01
Baby-MIND Modules & Services
Miscellaneous Topics MEC Session, CM March 2017 at GSI J. Lühning, GSI
ProtoDUNE – DSS Installation, Alignment and QA
SX1 manipulation VERSION 1 Version
MECHANICS OF THE FORWARD STRAW TUBE TRACKER (preliminary) Federico Evangelisti INFN - Ferrara GSI - 7/11 dicember 2009.
Solenoid Yoke Door-Barrel Connection
Easy-Cliner Manual Cable Version Assembly Instruction
Adjust the BalaceBox springs to balance
Status of works on the Collaboration Contract between IHEP and FAIR
INSTALLATION SEQUENCE
Endcap shielding senarios:
IHEP group Shashlyk activity towards TDR
Easycliner (Motorized Version) Assembly Instruction
Integration issues at IHEP
Sphere Option for Helical spring CF16 Bellows Adjustment bolts (horizontal plane) CF38.
TIDVG-4 TIDVG-4 Dump assembly, welding and installation Process sector BA1 February 2017 J. Humbert, (EN/MME) 06/02/2017 J. Humbert, EN-MME.
LCD Splicing Screens Wall-mounted Guide
Duct casings for particulate filters DCA
SHMS Downstream Beamline Large SHMS/HMS Angles (Config-1)
모니터 리프트 규격서(HML-500) Audio & Video System, Display, Conference System.
Disassembly and Assembly of A900C-W Electronic Governor Actuator for P8 Fuel Injection Pump
Additional Upstream Coil Shielding
Gattini Detector Installation
Progress and plans, Mechanics system of CEPC
US-HiLumi – Shipping Post Assembly Status
Simplified Procedure Draft
Presentation transcript:

Barrel EMC assembling (EDMS DOCUMENT NUMBER 1421085/1) Andrey Ryazantsev, Valery Ferapontov on behalf of the IHEP-Protvino group

How to assemble barrel Beam 9900x300x700 W= 3065 kg Support #1 250x250x3280 W= 240 kg Support #2.1 2030x2000x3260 W= 1250 kg Support #3 4120х600x3260 W= 265 kg Support #4 800x2635х3260 W= 735 kg Support #2.2 2030x2000x3260 W= 1250 kg

How to assemble barrel

How to assemble barrel Procedures: Mounting of two Support Rings with special Flanges

How to assemble barrel Procedures: Moving the Beam inside the Cryostat; Fix Flanges with four rectangular Tubes;

How to assemble barrel Procedures: Mounting of 2 mechanical Jacks (ZIMM- Austria); Mounting of a Lanyard.

How to assemble barrel Procedures: Mounting of 2 lifting Devices; Mounting of 2 Spacers. Pick up both supporting Plates of Lifting Devices on ~ 300 mm.

How to assemble barrel

How to assemble barrel Procedures: Installation of 1-st Slice on the Supporting Plates; Put down the Slice using screw Jack Actuators of the Lifting Devices.

How to assemble barrel Procedures: Adjusting the Slice to Holes on Upstream and Downstream Rings; Install special shims from Downstream side of Slice and fix them by means of 2 special bolts; Join Slice to the Rings with 2 special Pins and 2 Bolts M16

How to assemble barrel Procedures: Rotate Beam with Jack by 22,5 degrees; Fix Flange from Downstream side of the Beam by means of Lanyard

How to assemble barrel

How to assemble barrel

How to assemble barrel

How to assemble barrel

How to assemble barrel

How to assemble barrel

How to assemble barrel