Job Performance Requirement 17-2

Slides:



Advertisements
Similar presentations
FIRE SERVICE FORCED ENTRY
Advertisements

Henderson Fire Department Objectives Demonstrate the ability to use the irons on residential doorsDemonstrate the ability to use the irons on residential.
FVCC Fire Rescue Forcible Entry.
State of Georgia BASIC FIRE FIGHTER TRAINING COURSE
Forcible Entry Boone County Fire District February 2013.
Installing Doors & Frames Ref: Handout / Text M. S. Martin Sept
Forcible Entry By Randy Hart.
Breaking, Measuring, and Adjusting Chain ~The most used drive system on a FIRST robot uses chains and sprockets. Understanding the proper techniques to.
TO: A.C. CALLAN CHIEF OF TRAINING FROM: MICHAEL BISHOP LIEUTENANT RE: NAVY YARD SEARCH DRILL 6/22/99 AFTER CAREFUL CONSIDERATION AND OBSERVATION I CAME.
Medical Ambulance Bus Patient Loading. Inside Right of MAB looking forward.
11 Forcible Entry Skill Drills. 2 Objectives (1 of 3) Force entry through an inward-opening door. Force entry through an outward-opening door. Use the.
Residential Construction Residential Doors Installation Guide Source: Carpentry & Building Construction Feirer & Feirer / Lowe’s How-To Library.
Firefighters Support Foundation Basic Forcible Entry v1.1.
Job Performance Requirement 18-2 Louver in Lieu. JPR 18-2A A Detailed drawing identifying cutting terms used in louver-in-lieu operation.
Review of Forcible Entry/Exit.
Reading Measuring Tools
APPLICATIONS OF TECHNOLOGY
Coral Springs Fire Rescue In Service Training Forcible Entry.
Installing a Pre-Hung Door
Wedge.
Forcible Entry Lieutenant Qualifications Packet. Outward Swinging Door.
11 Forcible Entry Skill Drills. 2 Objectives Force entry through inward- and outward- opening doors. Use the triangle method to open an overhead garage.
Vocabulary Flash Cards
Job Performance Requirement Modified Gasner Bar Pack.
Halligan Section: Tools and Equipment Issue Date: Revised: XX-XXXX.
Job LevelsCritical Safety Points All supression personnelUse of PPE, Dept P&P Perform these basic firefighter skills. When performing these skills discuss.
Step 1 Spin the dial at least two times to the right (clockwise), all the way around. This "clears" the lock of any previous numbers. Turn the dial to.
By: Dana A, Robin B. & Tatyana P. Are these items magnetic or not? Out of the few items below, can you place the items in the correct box. Magnetic Nonmagnetic.
Original Power Point Created by Scott Sommerlatte Modified by Georgia Agricultural Education Curriculum Office May 2007.
Tent Pitching 1. Materials needed to pitch a tent: Equipment : Quantity : Remarks : 1 Inner Sheet 1-With door flaps at both ends and wall flaps on both.
CON 4003 Construction Estimating Prof R. V. Locurcio.
Identifying Information: Building Exterior - 1 You observe damage to the frame on this exterior entry door. The door cannot be locked. LEVEL 3.
Forcible Entry. Objectives (1 of 3) Identify forcible entry tools by common name and use. Identify forcible entry tools by common name and use. Describe.
APPLICATIONS OF TECHNOLOGY
We Train For Those We Have Lost
Installation Walkthrough Image Guide
H&S ALERT 22 May 2017 No Lifting 3-Section Manhole Covers
Pest Management.
Objectives Describe the fasteners, anchors, and adhesives used in construction and explain their uses. a. Identify various types of nails and cite uses.
Job Performance Requirement 7-11
Don’t be a victim of Car Jamming during this Easter Holidays!
Team 1: 32 responses Team 2: 55 responses Team 3: 29 responses
Simple Way to Install Auto Lock Door in Car
Building Construction I Sofia Sebastian 1
Job Performance Requirement 22-1
Adjusting Tilt and Turn Inswing Door or Window
Reading Measuring Tools
در تجزیه و تحلیل شغل باید به 3 سوال اساسی پاسخ دهیم Job analysis تعریف کارشکافی، مطالعه و ثبت جنبه های مشخص و اساسی هر یک از مشاغل عبارتست از مراحلی.
Job Performance Requirement 10-16
Job Performance Requirement 16-5
Job Performance Requirement 16-12
Force and Motion Push or Pull.
11 Forcible Entry.
11 Forcible Entry.
Work, Force and Motion.
قوانين برگزاري مناقصات و آيين نامه مالي و معاملاتي دانشگاه علوم پزشكي و خدمات بهداشتي ،درماني تهران
Job Performance Requirement 17-1
Job Performance Requirement 15-21
Job Performance Requirement 16-13
About.
Window Schedule A list of the windows to be installed in a building, including complete specifications.
Job Performance Requirement 10-9
Job Performance Requirement 16-13
Job Performance Requirement 16-8
Micrometer Measurement Parts & Readings.
Job Performance Requirement 16-8
FORCIBLE ENTRY Fire fighter I.
All About Magnets.
Job Performance Requirement 15-14
Hydraulic Forcible Entry Tool
Presentation transcript:

Job Performance Requirement 17-2 Conventional Forcible Entry—Door Swinging Toward the Forcible Entry Team

type of door frame and hinges. A Check the door to determine swing; the number, type, and location of locking devices; and the type of door frame and hinges.

B Create a gap between the door and jamb by driving the adz or fork end of the Halligan tool between the door and frame 6 inches above or below the lock. JPR 17-2B

C On tight doors, the gap may be started with the fork end. JPR 17-2C

D If door is tight, work tool up and down to open up gap. JPR 17-2D

E Set the tool by driving the adz or fork end past the door around the doorstop. JPR 17-2E

F This inside view shows how the adz is set. JPR 17-2F

G Force the door by pulling the tool away from the door. JPR 17-2G