IEEE Presentation Submission Template (Rev. 9) Document Number:

Slides:



Advertisements
Similar presentations
Project Planning Adhoc: WG Opening Plenary Report IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE /0022 Date Submitted:
Advertisements

Project Planning Adhoc Closing Report IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE /0027r2 Date Submitted:
M2M Study Report: Status Report IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE C802.16ppc-10/0008 Date Submitted:
Project Planning Committee (PPC): Session #70 WG Closing Plenary Report IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE.
ITU-R Liaison Group Report - Session #76 Opening Plenary IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE L /0061 Date.
Project Planning Adhoc Closing Report IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE /0007 Date Submitted:
11 ITU-R Liaison Group Report - Session #75 Closing Plenary IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE L /0058.
ITU-R Liaison Group Report - Session #74 Opening Plenary IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE L /0037 Date.
Project Planning Committee (PPC): Session #67 Closing Plenary Report IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE.
Project Planning Committee (PPC): Session #68 Closing Report IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE ppc-10/0010.
Project Planning Committee (PPC): Session #69 WG Closing Plenary Report IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE.
November, 2010Peretz Feder IEEE MEDIA INDEPENDENT HANDOVER DCN: Title: Liaison Report – Work Date Submitted:
Project Planning Committee (PPC): Session #70 WG Opening Plenary Report IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE.
IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE C /0009 Date Submitted: Source(s): Shilpa Talwar, Kerstin.
Project Planning Committee (PPC): Next revision project
Session # Maintenance Task Group Opening and Agenda
MM RG Report Document Number: IEEE C802.16n-11/0083 Date Submitted:
Project Planning Committee (PPC): Session #68 Closing Report
ITU-R Liaison Group Report - Session #75 Opening Plenary
Suggestion to update Work Plan for IEEE m Standard
Session # NRR Committee Closing Report
Session # Maintenance Task Group Opening Slides
ITU-R Liaison Group Report - Session #73 Opening Plenary
Project Planning Committee Closing Report (Session #76)
Project Planning Committee (PPC): Report
IEEE Presentation Submission Template (Rev. 9) Document Number:
Project Planning Committee Closing Report (Session #75)
Project Planning Committee Opening Report
Work Plan for IEEE m Standard & IMT-Advanced Submission
Session # Maintenance Task Group Closing Plenary Report
Project Planning Committee Opening Report (Session #77)
ITU-R Liaison Group Report - Session #62 Opening Plenary
Title: LE TG Closing Report for Session #61
Title: LE TG Agenda for Session #56
Title: LE TG Agenda for Session #54
Title: LE TG Agenda for Session #53
Title: LE TG Agenda for Session #65
Title: LE TG Report for the opening plenary – Session #58
Title: LE TG Closing Report for Session #56
Title: LE TG Agenda for Session #63.5
Title: LE TG Closing Report for Session #56
Title: LE TG report for the opening plenary – Session #66
Session # n GRIDMAN TG Closing Report
Session # n GRIDMAN TG Closing Report
Session # Maintenance Task Group Opening Report
Session # Maintenance Task Group Opening and Agenda
Session # Maintenance Task Group Opening and Agenda
Session # Maintenance Task Group Opening and Agenda
Broadcast Handovers Tutorial Overview
Title: LE TG Agenda for Session #66
Title: LE TG Agenda for Session #62
ITU-R Liaison Group Report - Session #80 Closing Plenary
Session # Maintenance Task Group Closing Plenary Report
ITU-R Liaison Group Report - Session #52 Closing Plenary
IETF 16ng Working Group Update
Session # n GRIDMAN TG Closing Report
Session # GRIDMAN SG Opening Report
ITU-R Liaison Group Report - Session #78 Closing Plenary
Title: LE TG Agenda for Session #60
ITU-R Liaison Group Report - Session #52 Opening Plenary
Title: LE TG Agenda for Session #52
Project Planning Adhoc: WG Opening Plenary Report
Title: LE TG Closing Report for Session #61
Title: LE TG Agenda for Session #64
Network Synchronization Considerations for n
ITU-R Liaison Group Report - Session #61 Opening Plenary
Title: LE TG Agenda for Session #59
Session # NRR Ad Hoc Committee Opening Report
Session # Maintenance Task Group Closing Plenary Report
Session # NRR Ad Hoc Committee Report
Presentation transcript:

802.16 Project Planning Committee (PPC): Session #70 WG Closing Plenary Report IEEE 802.16 Presentation Submission Template (Rev. 9) Document Number: IEEE 802.16ppc-10/0016 Date Submitted: 2010-11-11 Source: Jose Puthenkulam E-mail: jose.puthenkulam@tcs.com Project Planning Committee Chair Venue: Dallas, Texas, USA Base Contribution: None Purpose: 802.16 Project Planning Committee Session #70 WG Closing Plenary Report of activities planned Notice: This document does not represent the agreed views of the IEEE 802.16 Working Group or any of its subgroups. It represents only the views of the participants listed in the “Source(s)” field above. It is offered as a basis for discussion. It is not binding on the contributor(s), who reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor grants a free, irrevocable license to the IEEE to incorporate material contained in this contribution, and any modifications thereof, in the creation of an IEEE Standards publication; to copyright in the IEEE’s name any IEEE Standards publication even though it may include portions of this contribution; and at the IEEE’s sole discretion to permit others to reproduce in whole or in part the resulting IEEE Standards publication. The contributor also acknowledges and accepts that this contribution may be made public by IEEE 802.16. Patent Policy: The contributor is familiar with the IEEE-SA Patent Policy and Procedures: <http://standards.ieee.org/guides/bylaws/sect6-7.html#6> and <http://standards.ieee.org/guides/opman/sect6.html#6.3>. Further information is located at <http://standards.ieee.org/board/pat/pat-material.html> and <http://standards.ieee.org/board/pat >.

PPC Agenda this week Time slots Agenda Wed: PM1 (1:30-6 PM) Opening Project Planning Discussion Input Contributions: 802.16ppc-10_0014.ppt – Sept session closing report C802.16ppc-10/0068 Hierarchical Networks Study Report Update C802.16ppc-10/0066, C802.16ppc-10/0067 Thu: PM1 & PM2 TDD Co-existence Study Report Update New Study Topics discussion Enhancements to WirelessMAN-OFDMA air interface IMT-Update workshop presentation content planning Update Project planning map Closing

PPC Study Items Study Item objective is to identify need for any new PAR(s) for new technical areas. Active Study Items: Hierarchical Networks Study Report (802.16ppc-10/0008r1) TDD Co-existence Study Report (802.16ppc-10/0007) Study Items completed: M2M Study Report (IEEE 802.16ppc-10/0002r7) IEEE 802.16p M2M PAR & 5C approved now! (http://newton.events.ieee.org/802.16/16/pars/P802.16p.pdf ) 802.16p Task Group starts this week. All the best to them! M2M early requirements (IEEE 802.16ppc-10/0011r2) discussions have now moved to the Task Group

Project Planning Discussion Reviewed Sept session closing report (802.16ppc-10_0014.ppt ). Discussed updates for the Project planning map. Reviewed contribution C80216ppc-10_0068.ppt – Suggestion plans for the next revision project Recommendation to Working Group: WG should consider creating a Revision PAR to consolidate IEEE Std 802.16-2009, and amendments 802.16j-2009, 802.16h-2010 and the soon to be completed P802.16m by Jan 2011, with a plan to initiate work by mid 2011.

Hierarchical Networks Study Report Update (1/2) Input Contributions Discussed: S80216ppc-10_0066.ppt - Coordinated AP for tightly coupled BS-AP interworking for Multi-RAT devices C80216ppc-10_0066r1.doc - Coordinated AP for tightly coupled BS-AP interworking for Multi-RAT devices C80216ppc-10_0067.doc - Text proposal on Study Report on Hierarchical Networks (Working document) Outcome: We updated the working document for the Hierarchical Networks Study Report (802.16ppc-10/008r2).

Hierarchical Networks Study Report Update (2/2) Motion: To issue a call for contributions for continuing development of the Hierarchical Networks Study Report Mover: Nageen Himayat Second: Jin Sam Kwak Passes with unanimous consent.

TDD Co-existence Study Report Update No input contributions received for the last 2 meetings Also no interest to pursue the document further. So we decided not to issue a call for new contributions

New Study Topics (1/2) Discussed contribution C802.16ppc-10/69r2 suggesting Enhancements for WirelessMAN-OFDMA. Suggestion was to consider enhancements with limited scope to one year Forward compatible enhancement to 802.16m Possible High Priority Features suggested were: Multi-carrier 20MHz review and supplement Power saving enhancement ICIC enhancement After quite a bit of discussion, no specific actionable conclusion was reached.

New Study Topics (2/2) Discussed the need for developing content for the ITU-R Workshop in March 2011 to motivate the agenda for new spectrum identification in WRC 2011. This expects new services to be identified that would require new spectrum. Motion to start new Study Item on “Vision for Services and Capabilities of Systems Beyond IMT-Advanced” Moved: Shilpa Talwar Second: Upkar Dhaliwal Passes with Unanimous Recommendation: To issue a call for contributions for this study item after session #70.

802.16 Project Planning Map (1/2) Study Items Description Project Target TimeLine M2M First Phase: New requirements for massive number of devices to be connected over 16 Networks. 802.16p Project. Study Item started: Mar 2010 WG PAR Approval: May 2010 EC PAR Approval: Jul 2010 TG Start: Nov 2010 Std Completion: Jul, 2012 Later Phase: More Advanced M2M capabilities. Example: Those features that are not addressed in 802.16p but already included in the Study Report (802.16ppc-10/0002r7) and additional features. TBD Hierarchical Networks Same RAT: Extensions to Advanced Air Interface (802.16m) for multi-tier deployments 802 Multi-RAT: Advanced network topologies offering high capacity at low cost Client Collaboration: Co-operation amongst clients Study item started: May 2010 WG PAR Approval: Jan 2011 EC PAR Approval: Mar 2011 TG Start: TBD Std Completion: TBD Co-existence with non- 802 TDD systems Co-existence with non-802 TDD systems. Example: TDS-CDMA, TD-LTE WG PAR Approval: TBD EC PAR Approval: TBD

802.16 Project Planning Map (2/2) Study Items Description Project Target TimeLine Enhanced QOE Improved quality of experience for mobile internet applications WG PAR Approval: 2011 EC PAR Approval: TBD TG Start: TBD Std Completion: TBD Ultra High Speed Networks (>1-5Gbps) Advanced MIMO, Higher Order Modulation, Higher Bandwidths, Multicarrier Green RAN Energy savings at Client and Network Vision for Services and Capabilities of Systems Beyond IMT-Advanced To develop a framework for new services and capabilities for systems beyond IMT-Advanced. Identify new requirements and technologies in the process. Contribute to ITU –R WP5D with help from ITU LG. Target March 2011 ITU-R workshop

THANK YOU! ALL THE BEST FOR THE FUTURE!