TVB TVB X 14 TRIG40 (tell40 structure) Selection board in barrack

Slides:



Advertisements
Similar presentations
1 Calorimeter Trigger to L1-Board data transmission Umberto Marconi INFN Bologna.
Advertisements

TileCal Optical Multiplexer Board 9U VME Prototype Cristobal Cuenca Almenar IFIC (Universitat de Valencia-CSIC)
20 July 2006 H. Chanal, R. Cornat, E. Delage, O. Deschamps, J. Laubser, M. Magne, P. Perret LPC Clermont Level 0 Decision Unit PRR.
Y. Gao & P. Gay FCPPL FEE for ILC Calorimeter Development 1 Front-End-Electronics for ILC Calorimeter Development G. Blanchard, P. Gay,
The LAr ROD Project and Online Activities Arno Straessner and Alain, Daniel, Annie, Manuel, Imma, Eric, Jean-Pierre,... Journée de réflexion du DPNC Centre.
L1 Board CERN 3-June-2003 A. Bay UNI-Lausanne. RB1: 10 MHz, VME I/F 2 FADC channels RB2: 40 MHz, VME I/F 4 FADC channels RB3 (mother-board): 40 MHz, LHCb.
P. Chumney, U. Wisconsin, CHEP, March 2003 CMS Regional Calorimeter Trigger - 1 Level-1 Regional Calorimeter System for CMS P. Chumney, S. Dasu, M. Jaworski,
Integrated test environment for a part of the LHCb calorimeter TWEPP 2009 Carlos Abellan Beteta La Salle, URL 22/9/2009TWEPP09 Parallel session B2a - Production,
PCIe based readout U. Marconi, INFN Bologna CERN, May 2013.
Global Trigger H. Bergauer, K. Kastner, S. Kostner, A. Nentchev, B. Neuherz, N. Neumeister, M. Padrta, P. Porth, H. Rohringer, H. Sakulin, J. Strauss,
1 L0 Calorimeter Trigger LHCb Bologna CSN1 Assisi, 22/9/04 U. Marconi INFN Sezione di Bologna.
1 5 December 2012 Laurent Roy Infrastructure / Electronics Upgrade -Cabling (long distance) -Rack and Crate (space, electrical distribution, cooling) -Detector.
XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser Dariusz Makowski, Technical University of Łódź LLRF review, DESY, 3-4 December 2007 Advanced.
Laboratoire d’Annecy-le-vieux de Physique des Particules, France Cyril Drancourt Tuesday 16 September 2003 Optical link in Calorimeter DAQ: Link FEE(CROC)
W. Smith, et al., U. Wisconsin, Oct 13, 2011 Calorimeter Trigger Upgrade- 1 Calorimeter Trigger Schedule M. Bachtis, A. Belknap, M. Cepeda, S. Dasu, E.
Dec. 19, 2006TELL1 commissioning for Calorimeters 1 TELL1 commissioning for calorimeters ■ Reminder ■ TELL1 status ■ ECS for TELL1- PVSS panels ■ Firmware.
SPD Control Board 16th February SPD Control Board (VFE control and SPD multiplicity) VFE’s control (I2C communication: SDA,SCL; clock; reset/trigger.
Wilco Vink 1 Outline Optical station Vertex processor board Output board Latency.
The L0 Calorimeter Trigger U. Marconi On behalf of the Bologna Group CSN1, Catania 16/9/02.
Laboratoire d’Annecy-le-vieux de Physique des Particules, France Cyril Drancourt Tuesday 3 June 2003 Common L1 Workshop Use in Calorimeter Old design with.
Latest ideas in DAQ development for LHC B. Gorini - CERN 1.
24/03/2010 TDAQ WG - CERN 1 LKr L0 trigger status report V. Bonaiuto, G. Carboni, L. Cesaroni, A. Fucci, G. Paoluzzi, A. Salamon, G. Salina, E. Santovetti,
Guido Haefeli CHIPP Workshop on Detector R&D Geneva, June 2008 R&D at LPHE/EPFL: SiPM and DAQ electronics.
01/04/09A. Salamon – TDAQ WG - CERN1 LKr calorimeter L0 trigger V. Bonaiuto, L. Cesaroni, A. Fucci, A. Salamon, G. Salina, F. Sargeni.
US CMS DOE/NSF Review, May Cal. Trig. 4 Gbaud Copper Link Cards & Serial Link Test Card - U. Wisconsin Compact Mezzanine Cards for each Receiver.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
US CMS DOE/NSF Review, 20 November Trigger - W. Smith1 WBS Trigger Wesley H. Smith, U. Wisconsin CMS Trigger Project Manager DOE/NSF Status.
CHEF 2013 – 22-25th April 2013 – Paris LHCb Calorimeter Upgrade Electronics E. Picatoste (Universitat de Barcelona) On behalf of the LHCb group.
XLV INTERNATIONAL WINTER MEETING ON NUCLEAR PHYSICS Tiago Pérez II Physikalisches Institut For the PANDA collaboration FPGA Compute node for the PANDA.
W. Smith, U. Wisconsin, LHC Electronics Conference, October 1, 2003 CMS Calorimeter Regional Trigger - 1 Full Crate Test of the CMS Regional Calorimeter.
Common test for L0 calorimeter electronics (2 nd campaign) 4 April 2007 Speaker : Eric Conte (LPC)
HPS TDAQ Review Sergey Boyarinov, Ben Raydo JLAB June 18, 2014.
Upgrade: Calo Trigger Calorimeter detector 20 Link = 4 copper wire Serial LVDS 280Mhz 32
1 Status of Validation Board, Selection Board and L0DU Patrick Robbe, LAL Orsay, 19 Dec 2006.
Calorimeter global commissioning: progress and plans Patrick Robbe, LAL Orsay & CERN, 25 jun 2008.
09/09/2010 TDAQ WG - Louvain 1 LKr L0 trigger status report V. Bonaiuto, A. Fucci, G. Paoluzzi, A. Salamon, G. Salina, E. Santovetti, F. Sargeni, F. Scarfi’
1 Timing of the calorimeter monitoring signals 1.Introduction 2.LED trigger signal timing * propagation delay of the broadcast calibration command * calibration.
Outline Upgrade status of the ECAL/HCAL HV control mezzanine board;  Firmware design,  Setup for making functional tests and validation FPGA firmware.
M.N Minard Trigger Validation Board Tests and Implantation Cyril Drancourt, Pierre-Yves David,Victor Coco, Thomas Chouvion,M.N Minard - Production status.
29/05/09A. Salamon – TDAQ WG - CERN1 LKr calorimeter L0 trigger V. Bonaiuto, L. Cesaroni, A. Fucci, A. Salamon, G. Salina, F. Sargeni.
The LHCb Calorimeter Triggers LAL Orsay and INFN Bologna.
E. Hazen1 MicroTCA for HCAL and CMS Review / Status E. Hazen - Boston University for the CMS Collaboration.
E. Hazen -- ACES ACES 2011 MicroTCA in CMS E. Hazen, Boston University for the CMS collaboration.
Krzysztof Czuba, ISE, Warsaw ATCA - LLRF project review, DESY, Dec , XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser Master Oscillator.
Track Sorter Slave chip TSS ASICs TSM: 3 pASICs TRACO ASICs.
E. Hazen1 Fermilab CMS Upgrade Workshop November 19-20, 2008 A summary of off-detector calorimeter TriDAS electronics issues Eric Hazen, Boston.
- LHCb calorimeter upgrade April 15th, News and ideas on DAQ architecture Frédéric Machefert LAL, Orsay.
E. Hazen -- Upgrade Week1 MicroTCA Common Platform For CMS Working Group E. Hazen - Boston University for the CMS Collaboration.
LHCb Outer Tracker Electronics 40MHz Upgrade
DAQ and TTC Integration For MicroTCA in CMS
Modeling event building architecture for the triggerless data acquisition system for PANDA experiment at the HESR facility at FAIR/GSI Krzysztof Korcyl.
Mapping area of the 36 PMT 9 PMT 9 PMT 9 PMT 9 PMT.
Future Hardware Development for discussion with JLU Giessen
DHH progress report Igor Konorov TUM, Physics Department, E18
T1 Electronic status Conclusions Electronics Cards:
LATOME LAPP Nicolas Dumont Dayot on behalf of the LAPP team
DC trigger test Present layout Trigger electronics
Read-out of High Speed S-LINK Data Via a Buffered PCI Card
LHC Collisions.
VELO readout On detector electronics Off detector electronics to DAQ
LHCb calorimeter main features
during Fall GMp run (high current)
Example of DAQ Trigger issues for the SoLID experiment
CSC Trigger Muon Port Card & Sector Processor in production
New Calorimeter Trigger Receiver Card (U. Wisconsin)
John Harvey CERN EP/LBC July 24, 2001
The LHCb L0 Calorimeter Trigger
Possible parasitic measurement during Fall GMp run
Digitally subtracted pulse between
LIP and the CMS Trigger Upgrade On behalf of the LIP CMS Group
Presentation transcript:

TVB TVB X 14 TRIG40 (tell40 structure) Selection board in barrack (1MHz) L0DU TRIG40 (tell40 structure) X 14 ECAL crate (front view) Upgrade: Calo Trigger Study cyril.drancourt@lapp.in2p3.fr

Actual calorimeter trigger design Backplane link 2M cable 15M cable Calorimeter detector 20 bits @40Mhz Link = 4 copper wire Serial LVDS 280Mhz Front-end boards Trigger Validation Board (TVB) Optic Mezzanine rubbon of 12 fiber 32 bits @40Mhz Link = Optic fibre 1.6 Ghz Selection Board (SB) Upgrade: Calo Trigger Study cyril.drancourt@lapp.in2p3.fr

Tell 40 system with 1.6 GHZ inputs Upgrade – setup Calorimeter detector 20 bits @40Mhz Link = 4 copper wire Serial LVDS 280Mhz Front-end boards Optic Mezzanine rubbon of 12 fiber Trigger Validation Board (TVB) 32 bits @40Mhz Link = Optic fibre 1.6 Ghz Tell 40 system with 1.6 GHZ inputs Selection Board (SB) 108x32 bits @40Mhz Link = Optic fibre ~infiniband rate To Be Define 1,6Ghz or 4,8Ghz or… To farm DAQ To SuperODIN(LLT) Upgrade: Calo Trigger Study cyril.drancourt@lapp.in2p3.fr

Previsionnal Tell40 design (2010 study) Upgrade: Calo Trigger Study cyril.drancourt@lapp.in2p3.fr

Upgrade: Calo Trigger Study cyril.drancourt@lapp.in2p3.fr

Upgrade: Calo Trigger Study cyril.drancourt@lapp.in2p3.fr

Upgrade: Calo Trigger Study cyril.drancourt@lapp.in2p3.fr

Upgrade: Calo Trigger Study cyril.drancourt@lapp.in2p3.fr

Upgrade: Calo Trigger Study cyril.drancourt@lapp.in2p3.fr

2 TRIG40 = full Calo trigger upgrade 7000€ 7000€ 7000€ 7000€ 5000€ Total installation cost = 8 x 7000 + 2 x 2000 = 60 000 € + common ATCA Crate with SuperODIN Upgrade: Calo Trigger Study cyril.drancourt@lapp.in2p3.fr

devellopment schedule ATCA Crate (15 slots) ATCA manager board: Commercial + CCPM part First final board Start of 2012 > CCPM (Marseille) CCPM debugging First board available for LAPP: End of 2012 Upgrade: Calo Trigger Study cyril.drancourt@lapp.in2p3.fr

First possible LAPP devellopment setup Small ATCA Crate (2 slots) Commercial ATCA Carrier board Commercial ATCA manager board 7000€ 3500€ 3500€ 2000€ Computer With tools 4000€ First cost = = 20 000 € Upgrade: Calo Trigger Study cyril.drancourt@lapp.in2p3.fr

« upgrade Calorimeter LHCb »: Next meeting « upgrade Calorimeter LHCb »: 21 and 22 july 2011 Upgrade: Calo Trigger Study cyril.drancourt@lapp.in2p3.fr