TVB TVB X 14 TRIG40 (tell40 structure) Selection board in barrack (1MHz) L0DU TRIG40 (tell40 structure) X 14 ECAL crate (front view) Upgrade: Calo Trigger Study cyril.drancourt@lapp.in2p3.fr
Actual calorimeter trigger design Backplane link 2M cable 15M cable Calorimeter detector 20 bits @40Mhz Link = 4 copper wire Serial LVDS 280Mhz Front-end boards Trigger Validation Board (TVB) Optic Mezzanine rubbon of 12 fiber 32 bits @40Mhz Link = Optic fibre 1.6 Ghz Selection Board (SB) Upgrade: Calo Trigger Study cyril.drancourt@lapp.in2p3.fr
Tell 40 system with 1.6 GHZ inputs Upgrade – setup Calorimeter detector 20 bits @40Mhz Link = 4 copper wire Serial LVDS 280Mhz Front-end boards Optic Mezzanine rubbon of 12 fiber Trigger Validation Board (TVB) 32 bits @40Mhz Link = Optic fibre 1.6 Ghz Tell 40 system with 1.6 GHZ inputs Selection Board (SB) 108x32 bits @40Mhz Link = Optic fibre ~infiniband rate To Be Define 1,6Ghz or 4,8Ghz or… To farm DAQ To SuperODIN(LLT) Upgrade: Calo Trigger Study cyril.drancourt@lapp.in2p3.fr
Previsionnal Tell40 design (2010 study) Upgrade: Calo Trigger Study cyril.drancourt@lapp.in2p3.fr
Upgrade: Calo Trigger Study cyril.drancourt@lapp.in2p3.fr
Upgrade: Calo Trigger Study cyril.drancourt@lapp.in2p3.fr
Upgrade: Calo Trigger Study cyril.drancourt@lapp.in2p3.fr
Upgrade: Calo Trigger Study cyril.drancourt@lapp.in2p3.fr
Upgrade: Calo Trigger Study cyril.drancourt@lapp.in2p3.fr
2 TRIG40 = full Calo trigger upgrade 7000€ 7000€ 7000€ 7000€ 5000€ Total installation cost = 8 x 7000 + 2 x 2000 = 60 000 € + common ATCA Crate with SuperODIN Upgrade: Calo Trigger Study cyril.drancourt@lapp.in2p3.fr
devellopment schedule ATCA Crate (15 slots) ATCA manager board: Commercial + CCPM part First final board Start of 2012 > CCPM (Marseille) CCPM debugging First board available for LAPP: End of 2012 Upgrade: Calo Trigger Study cyril.drancourt@lapp.in2p3.fr
First possible LAPP devellopment setup Small ATCA Crate (2 slots) Commercial ATCA Carrier board Commercial ATCA manager board 7000€ 3500€ 3500€ 2000€ Computer With tools 4000€ First cost = = 20 000 € Upgrade: Calo Trigger Study cyril.drancourt@lapp.in2p3.fr
« upgrade Calorimeter LHCb »: Next meeting « upgrade Calorimeter LHCb »: 21 and 22 july 2011 Upgrade: Calo Trigger Study cyril.drancourt@lapp.in2p3.fr