SPP FIELDS V1234 Thermal PSR

Slides:



Advertisements
Similar presentations
Tracker Subsystem1 GLAST LAT Project FM8/14 PSR, Oct. 5, 2005 GLAST LAT Tracker Towers 8/14 Pre-Ship Review INFN-Pisa.
Advertisements

ISIM Integration & Test Mike Drury JWST-PRES
GLAST LAT ProjectLAT Engineering Meeting, April 1, 2003 GLAST Large Area Telescope: Performance & Safety Assurance Darren S. Marsh Stanford Linear Accelerator.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems Mechanical / Thermal Hardware November 2004 Status Marc Campell, Subsystem Manager.
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Section Mechanical Systems Radiator and X-LAT Assy1 GLAST Large Area Telescope:
Tracker Subsystem1 GLAST LAT Project FM4/5 PSR, May 31, 2005 GLAST LAT Tracker Tower-4/5 Pre-Ship Review INFN-Pisa.
MPSRThermal- 1 UCB, Oct 26, 2006 THEMIS MISSION PRE-SHIP REVIEW Thermal Christopher Smith University of California - Berkeley.
GoetzFIELDS iPDR – I&T SPP/FIELDS Integration and Test Preliminary Design Review Keith Goetz University of Minnesota 1.
STEREO IMPACT SEP Critical Design Review 2002-Nov-20 TvR IMPACT/SEP Thermal Design John Hawk, GSFC (301)
M. Diaz-AguadoFIELDS iPDR – Thermal Solar Probe Plus FIELDS Instrument PDR Thermal Subsystem Millan F. Diaz-Aguado SSL Berkeley
THEMIS F2/F3 IPSR and F4/F5 IPER 1 By Telecon, November 10, 2005 THEMIS INSTRUMENT SUITE FM2/FM3 PRE-SHIP REVIEW FM4/FM5 PRE-ENVIRONMENTAL REVIEW Thermal.
THEMIS Instrument Suite PERSuite T-V- 1 UCB, May 2, 2005 THEMIS Instrument Suite Thermal Vac Test Rick Sterling University of California, Berkeley.
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 5.1 Grid Box Design 1 GLAST Large Area Telescope:
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Test Plan Michael Ludlam Space Sciences Laboratory.
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 6.0 Subsystem Verif. Test Plan 1 GLAST Large Area.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct. 2, I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist WBS
STEREO IMPACT Critical Design Review 2002 November 20,21,22 Presenter1 Thermal Control R.Eby Impact Boom Stowed and Deployed SWEA STE Magnetometer Bob.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW Boom PER 30 June RBSP EFW Spin Plane Booms Greg Dalton Space Sciences.
FM1 Instrument Suite Pre-Ship Review (PSR)Thermal-1UCB, September 21, 2005 THEMIS FM1 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) THERMAL Chris Smith University.
LAT TVAC Test Delta-PDR1 GLAST LAT Project25 May 2005 LAT Environmental Test Planning and Design Delta-Preliminary Design Review 25 May 2005 LAT T-Vac.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems Mechanical / Thermal Hardware December 2004 Status Marc Campell, Subsystem Manager.
MAVEN CDR May 23-25, 2011 Particles and Fields Package Critical Design Review May , 2011 Integration and Test Dave Curtis PFP Package Manager Mars.
GLAST LAT Project September 15, 2006: Pre-Shipment Review Presentation 8 of 12 Thermal Vacuum Test 1 GLAST Large Area Telescope LAT Pre-Shipment Review.
GLAST LAT ProjectCAL Peer Design Review, Mar 17-18, 2003 P. Prat CNRS/IN2P3-LLR Ecole Polytechnique GLAST Large Area Telescope Calorimeter Subsystem Gamma-ray.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Overview and Status Keith Goetz University of Minnesota.
THEMIS Instrument FM2/FM3 PEREnvironments- 1 Teleconference 8/30/2005 THEMIS Instrument FM2/3 Pre-Environmental Review Environments Jeremy McCauley University.
THEMIS IDPU PDR I&T REQUIREMENTS- 1 UCB, October 16, 2003 I&T REQUIREMENTS Ellen Taylor University of California - Berkeley.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
THEMIS Instrument PDR 1 UCB, April 19-20, 2004 Spin Plane and Axial Boom Preamps & Sensor Cable Fabrication Critical Design Review Daniel Schickele University.
F1, F3, F4, F5 PER 1 UCB, June 23, 2006 THEMIS MISSION PRE-ENVIRONMENTAL REVIEW Thermal Christopher Smith Thermal Engineer University of California - Berkeley.
July 18, SPP-FIELDS Thermal Path to TRL 6 M. Diaz-Aguado.
June 16, 2015SPP/FIELDS SOC CDR: Integration & Test SPP/FIELDS Integration and Test SOC Critical Design Review Keith Goetz University of Minnesota
C osmic R Ay T elescope for the E ffects of R adiation CRaTER Thermal Analysis Huade Tan 6/27/05.
LAT Design Integration and Analysis1 GLAST LAT Project24 May 2005 LAT Monthly Status Review 24 May 2005 Design Integration and Analysis LAT Monthly Status.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 Thermal Design Christopher Smith RBSP Thermal Engineer Space.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Systems Engineering Michael Ludlam Space Sciences.
FM4/FM5 IPSRSYS - 1 UCB, May 5, 2006 THEMIS INSTRUMENT SUITE FM4/FM5 PRE-SHIP REVIEW SYSTEM OVERVIEW Ellen Taylor University of California - Berkeley.
Spacecraft Level Testing and Verification Part 3 1.
Rationale for Selected MIL-STD-1540E Thermal Test Requirement
C osmic R Ay T elescope for the E ffects of R adiation CRaTER Pre-Ship Review (I-PSR) Thermal Analysis Christine Cottingham LM/GSFC 545 Hume Peabody GSFC.
1 PFP IPDR 2010/6/ Particles and Fields Package (PFP) Instrument Preliminary Design Review Integration & Test David Curtis, PF Package Manager.
GLAST LAT Project May 25, 2006: Pre-Environmental Test Review Presentation 11 of 12 Thermal Vacuum Test 1 GLAST Large Area Telescope LAT Pre-Shipment Review.
Solar Probe Plus FIELDS V1234 Mechanical Pre-Ship Review May 26, 2017
Rose Navarro HMI Lead Thermal Engineer
FIELDS MEP Thermal Vacuum Cycling iPER
FIELDS MEP & V5 Pre-Ship Review Thermal Summary
Solar Probe Plus FIELDS V1234 Mechanical Pre-Ship Review May 26, 2017
Gayle K. Martin November 14, 2016
FIELDS V1234 Thermal Vacuum & Balance Tests iPER Draft
General overview Place : Institue of Space Astrophysic (IAS, Orsay)
FIELDS Mission Assurance Manager University of California, Berkeley
Double Star: Table of Contents
EIDP Status. Solar Probe Plus FIELDS Main Electronics Package iPSR Management Apr 10, 2017.
THEMIS INSTRUMENT SUITE FM4/FM5 PRE-ENVIRONMENTAL REVIEW
FIELDS MEP & V5 Pre-Ship Review Thermal Summary
Mars Atmosphere and Volatile EvolutioN (MAVEN) Mission
Solar Probe Plus – FIELDS Verification Instrument mini-PER (V5)
GLAST Large Area Telescope:
Environmental Test Planning
FIELDS SCM Thermal iPER
LAT Requirements Verification in TVAC
© The Aerospace Corporation 2008 Rationale for Selected MIL-STD-1540E Thermal Test Requirement John W. Welch The Aerospace Corporation TFAWS
0.0 Instrument Suite Name Presenter’s name
University of California, Berkeley
2K CB FDR Overview:  Agenda, Charge, Review Process
CONTOUR NGIMS PRE-SHIP REVIEW
Precision Oven Thermal Design
Thermal Vacuum Test: Plans and Procedures
Integration and Test Organization Chart
CRaTER Thermal Analysis
Presentation transcript:

SPP FIELDS V1234 Thermal PSR Gayle K. Martin May 26, 2017

Contents The Post PER Road… Thermal Compliance Thermal Environmental Testing Thermal Vacuum Test Summary Thermal Balance Test Thermal Model Path Forward

We passed PER

But there was still a long and arduous road… We all experienced THIS moment Yet we persevered!

Thermal Compliance Action Items, Deviations Waivers Documents No thermal action items from IPER No open thermal actions or deviations Waivers Analyitical margin (not submitted) Omission of survival cycle for thermal cycle testing Documents iPER slides Thermal vaccum test procedure Thermal balance test procedure Thermal design summary Thermal model Bakeout plan Requirements SPP EDTRD SPP CCP FIELDS Bake-out

Thermal Environmental Testing Thermal cycling 5/13/2017 to 5/20/2017 6 Operational cycles +90°C to -77°C Hot bake out & hot survival No cold survival Thermal Balance 5/21/2017 to 5/25/2017 4 Balance plateaus 2 Heater verification balances Future Testing APL-ORNL optical tests of Nb C103 lot 2 APL-ORNL other testing TBD Previous testing: Reference document presented to APL 5/3/2017 Optical properties (2012) Choke thermal design (2012) Outgassing NbC103 (2012) Material compatibility (2013-2014) Thermal distortion (2013) Electrical verification (2014) Shield & stub thermal design (2014) Hinge deployment (2014-2015) Thermal design (2015) ETU thermal balance (2015) Preamp qualification (2016) ITVT (2017)

Thermal Vac Cycling V1234

Thermal Vacuum Test Set-up The TV test was complete at UCB/SSL in the Bayside chamber Test dates 5/13/2017 to 5/20/2017 Test set-up There were three temperature zones for the TV test (main shroud, end shrouds 7 baseplate) Fully assembled flight units V1234 The flight units were bolted to a mounting plate (shelf) then bolted to the chamber baseplate The harness rested on top shelf The heaters were connected for thermostat and heater performance verification Back shroud Main shroud Baseplate TV set-up in the Bayside chamber

Thermal Vacuum Test Set-up All 4 units mounted on shelf Harness on shelf top

Thermal Vacuum Test Set-up Selfie time!

Thermal Vacuum Test Set-up Terminator box V2 flight unit QA approved!!

Thermal Vacuum Test Set-up Thermocouples were mounted along the flight unit and instruments internal to the chamber to verify temperatures during thermal cycling The thermocouples were electrically isolated with Kapton tape and thermally coupled with aluminum tape The internal thermistor recorded that the temperatures stabilized during instrument operation (not available during survival) TC # Location  1 Door Shroud  2 Main Shroud  3 Baseplate 4 Back Shroud 5 V2 arm 6 V3 arm 7 V4 arm 8 V1 PinPuller 9 V2 PinPuller 10 V3 PinPuller 11 V4 PinPuller 12 V1 arm 13 V1 Preamp radiator 14 V2 Preamp radiator 15 V3 Preamp radiator 16 V4 Preamp radiator Arm Radiator PinPuller

Thermal Vacuum Test Results 6 Operational cycles +90°C to -77°C Hot bake out & hot survival Same temperature as operational cases Left to 90°C overnight to meet 48hr bakeout requirement Total hours >>48 hours No cold survival: cold survival at cold operational temperatures Hot and cold turn-on at first and last hot & cold cycles CPT at every cycle Successful cold & hot deployment Instrument functionals were complete Pre-test functional Hot and cold operation CPTs (all op cycles) Post-test functional Test parameters as indicated in PER were met The transition rate of the instrument did not to exceed 3°C per minute Soak was achieved at a minimum of four hour at case temperatures with a change in temperature of ±1°C Thermostat and heater performance was verified after cold soaks 3 and 6

Thermal Vacuum Test Results Acceptance temperature margins Flight allowable limits were tested at all soaks No non-conformances or differences from PER during test Measured test margins vs. design estimates: MEP tested to 10°C beyond predicts No rework/replacement, or changes to test plan since IPER Electrical performance (CPT) summarized in Sasha’s slides Hot deploy Final Bake & TQCM Warm-up Chamber break Cold deploy

Thermal Balance SN005

Thermal Balance Test Set-up

Thermal Balance Test Set-up

Thermal Balance Test Data The thermal balance test (4 balance cases & 2 heater verification soaks) completed Preliminary results: Most of the critical components are within 3°C of the predicts (as required) There are some components that are out of predicts Reasons for the discrepancy The part of the test set-up (aluminum stand-offs), MLI, & associated radiative view factor were not properly modeled Minor errors from conversion from the flight model to the test model were not debugged Optimization of optical properties Current work Detailed review of test set-up, specifically the radiative view in question Model correlation effort

Thermal Model The recommendations provided by Shawn from the last model view (3/2017) were incorporated Design updated that differed from design and flight unit were included

Path Forward Conclusion Model correlation Recommendation V1234 successfully complete all thermal testing The thermal model is under review Captive blankets are under construction for flight unit integration Model correlation Finalize the model correlation Final flight predicts Final heater power duty cycle predicts (transient) Recommendation Despite the differences between the test model and resultant temperatures, the source of the discrepancies have been identified Confident that the thermal model to date is accurate It is recommended to proceed as planned

It takes a Village… Abiad Jose Brent Keith Chris S1 Paul Chris S2 Peter David Sasha Greg Steve Helen Yvette John & al Jorg