YEARLY MAINTENANCE. CLEANING OF CHARGER.

Slides:



Advertisements
Similar presentations
STARTING & CHARGING SYSTEM DIAGNOSIS
Advertisements

 To develop our understanding of the Type 23 Electrical Power System and develop the P&D model: Covering:  The basic components of Generators.  How.
ELECTRICAL I LESSON 2 BATTERY SERVICE
© Goodheart-Willcox Co., Inc. Permission granted to reproduce for educational use only Publisher The Goodheart-Willcox Co., Inc. Tinley Park, Illinois.
A/C Generator Systems.
CHARGING & JUMPING BATTERIES BATTERIES n A BATTERY IS FILLED WITH SULFURIC ACID WHICH WILL EAT MOST ANYTHING. n A BATTERY HAS LEAD PLATES WHICH MAKE.
Q1 Engine turns over normally Q7 cranking problem? NO Not at all or slowly Q2 The headlights Come on and stay on while turning the key Q8 battery problem?
Uninterruptible Power Supply (UPS)

LP33 Series UPS kVA 400Vac/CE
Equipment and Setup NCCER Unit 7.
MUHAMMADALI MC SDE (KAM) KANNUR
Delta Confidential DES UPS introduction UPS training June 2006 Markus Schwab.
Single-Phase Half-Wave Rectifier
Solar Home UPS 850VA & 1400VA India’s first Sine wave inverter with in built Solar Charge Controller and Controlled DC Load Output. Simultaneous Charging.
Charging system PT 1 LSy_w.
Quality Service Providing Quality Performance.
Jim Baughn K9EOH. Preview Fuel Sources Power Generators Capturing and Using Generated Power Solar Power Expansion Safety Questions.
Freedom Combi Inverter
Inverters November 2007, Alex Righolt. Overview A&A Computers sell and install inverter systems as an alternative to UPS-es. Inverters are easily scaleable;
Why Check the System I Know What’s Wrong! We all have Test Equipment.
Portable Camera Operations1 Audio/Video Production 1 Portable Camera: Precautions and Operation.
Renewable Energy as Priority
A Dirt-Cheap Battery Tester RARS Meeting – April 2011.
Hybrid Wind & Solar Generation Project
Left Side Equipment Stack with HPA Inverter at bottom. Set the inverter to Mode 2. Right Side Equipment Stack with modems with Inverter at bottom. Set.
POWER PLANT USED IN TELECOM
AUTOMATIC VOLTAGE REGULATOR(AVR)
Operating and maintenance of generator. Operating Generator If it is manually operated generator, whenever power goes off, before starting the generator,
Service Training. CONSTRUCTION OF A BATTERY: Components.
Cells in Series and Parallel (page 310) Cells in Series and Parallel Dry cells can be connected together into two basic types of circuits: series.
2.00 Understand Computer Fundamentals
> Micropack System Concept January – Slide 2 Building blocks – Single position power core >Stand alone unit AC Input, L, N, PE, 1,5mm 2 DC Output,
Direct Current D.C. stands for direct current. Batteries supply d.c. With d.c. the current is always in travelling in the same direction. The current flows.
Communication Markets Division © 3M All Rights Reserved. 965AMS Product Overview.
EU 1000i and EU 2000i SECTION: Tools and Equipment ISSUED: REVISED: ##-####
Codan 5700 Series C-Band Transceiver Technical Overview.
1 Verizon Technology California Public Utilities Commission Rulemaking Backup Power at the Customer Premises Technical Workshop June 5th, 2007.
Half wave rectification By:Engr.Irshad Raheem Memon.
Power Plant Construction and QA/QC Section 4.4 – In-Plant Electrical Distribution Engineering Technology Division.
ADT490 Panel Theory. 2 System Power Supply Grounding ‣ Circuit separates positive / negative from Ground ‣ Ground fault - resistance to ground ≤ 10 kΩ.
© Goodheart-Willcox Co., Inc. Permission granted to reproduce for educational use only Battery Testing and Maintenance.
Test Programme for AC coaches
Diode Rectifier Circuits Section 4.5. In this Lecture, we will:  Determine the operation and characteristics of diode rectifier circuits, which is the.
LP Series 400V CE GE Consumer & Industrial September 2004.
1 Chapter No. 17 Radiation Detection and Measurements, Glenn T. Knoll, Third edition (2000), John Willey. Measurement of Timing Properties.
Figure 3-9: Implementing the Load Diverter CAUTION Do NOT connect the wires to the Diversion Load Controller or the terminal block at this point. IF.
Alarm units AL 175 NT and Aeon Gold For small, medium and large power range.
/. acer Aspire 4710 Battery Replacement 6 Cell 11.1V 4400mAh Black
ACER Aspire 5515 Battery Replacement 6 Cell 11.1V 4400mAh black
VMCL ELECTRONIC DIVISION.
UPS Training: The Online UPS
Uninterruptible Power Supply (UPS)
Robot Construction Repairing the Robot.
Understanding Olympian Generator Set Schematics
ECE 445 Spring 2017 Laser Tag Droid
Service Point.
Chapter 31 Battery Systems.
Reduction in Downtime via Interlocking
MINNY 16 TROUBLESHOOTING Doc THE MACHINE DOES NOT START
Emergency Electrical Power Supply for Buildings
Module 1 – Power Supply AMC APS-PBC-60
—Two power conditioning units (PCU)’s needed only if batteries are added for grid failure —AC output is consistent with the requirements of most loads.
48V Power Shelf Operation
FIGURE 15–21 When connecting a starter tester such as a Sun VAT 45 to the vehicle, make certain that the inductive probe is placed over all of the cables.
Chapter 31 Charging System.
NCP1200: PWM Controller, Fixed Frequency, Flyback, Current Mode
Presentation transcript:

YEARLY MAINTENANCE. CLEANING OF CHARGER. TIGHTEN ALL POWER AND CONTROL CABLE CONNECTIONS. AC & DC CONTACTOR TO BE CLEANED USING SAND POLISH PAPER TO REMOVE DUST AND DIRT. CARRY OUT LOAD TEST AND RECORD. CARRY OUT MAINTENANCE OF ALL ELECTRNIC MODULES TO HAVE PROPER CONTROL OR SUPERVISED THE CHARGER. CHECK THE FUNCTIONS IN AUTO & MANUAL MODE. CHECK THE VOLTAGE IN FLOAT MODE AND RECORD. CHECK THE TEST POINTS VOLTAGE OF AVR CARD AND RECORD. MEASURE THE OUTPUT VOLTAGE AT BATTERY TERMINAL AND AS WELL AS LOAD TERMINALS AND RECORD. CHECK THE RIPPLE THROUGH OSCILLOSCOPE AND RECORD. CHECK ALARM FUNCTIONS. CHECK THE INTERLOCKING , IF ANY. TO ENSURE THAT BATTERY BANKS ARE NOT OVER/UNDER CHARGED.