CRG-TM: LS1 projects review

Slides:



Advertisements
Similar presentations
Purpose Scope Debriefing is a concept of providing a “Feedback point” to the program manager of the project scope and those who were involved in preparing.
Advertisements

Going towards LHC Run2 CRYOGENICS 5 th Evian Workshop 2-4 June 2014 SESSION 4 - Systems 2 - Status and commissioning plans (HW perspective) Krzysztof Brodzinski.
LSC - 28 February M. Pezzetti – Cryogenics 1 28 February 2014 M. Pezzetti EDMS Id: v.1.
ANSI/EIA A EIA STANDARD Earned Value Management Systems Overview May 2, 2006 NDIA Program Management Systems Committee Walt Berkey, Lockheed.
LHC HARDWARE COMMISSIONING REVIEW May 2005 CRYOGENIC VACUUM SYSTEM Paul Cruikshank for AT/VAC.
VirtuOx 205- Executive Orientation and training series VirtuOx Technical Services Module 2.
VRVS, Jan. 2006CERN AB-ATB1 Safety Review Solenoid & Cryogenics CERN AB-ATB VRVS session, Jan
QRL Leak Tests the story so far………. Paul Cruikshank on behalf of TE-VSC colleagues & AL4030 Consortium (S133) 1 Paul Cruikshank TE/VSC - QRL Leak Tests.
Safety Management of the LIU Project A. Funken Anne Funken, LIU PT 21/05/15.
Helmholtz Centre for Ion Research D. Krämer, 2nd Lab Directors Meeting, Protvino, January 15-16, 2008 Design and Engineering Issues; Standardization and.
LHC Machine Status Report Roberto Saban LHCC June 4 th 2014.
From Research Prototype to Production
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
HL-LHC Project Kick-off Meeting Friday 15 th April 2011 Sylvain Weisz DG-DI-DAT on the behalf of the A&T Sector Projects Support Office.
Office of Pipeline Safety Integrity Management Inspection Process Louisiana Pipeline Safety Seminar August 2003.
TS, Length of YETS EYETS LIU & CONS Project
1 Second LHC Splice Review Copper Stabilizer Continuity Measurement possible QC tool for consolidated splices H. Thiesen 28 November 2011 K. Brodzinski,
June 1 rst, Consolidation for E-cloud and High Voltage cards N.Vauthier TE-CRG LS1 projects review:
AS-IS Process = 335TO-BE Processes = 194 Document work Validate work Integrated work testing Execute work Release work Integrate and schedule work Plan.
1 1. Some recent views ( ) 2 Linac tunnel
The organization and on-site follow up of the electrical installation work for the LHC The organization and on-site follow up of the electrical installation.
Technology Department 1 Visit to Hall 180: Presentation of the consolidation process Third LHC Splice Review, November 12, 2012.
A. Perin, TE-CRG, YETS meeting September 15 th 2015 Year End Technical Stop (YETS) Meeting A. Perin, TE-CRGm with contributions from M. Pezzetti,
Plan. 12/05/ Who are we? PM (Project Management and Resource Planning) – APT – IMPACT – PPTEU2 – Plan LS1 – 2012 –…–… Plan V2 – From LS1 to LS2.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
Spare Parts strategy, methodology and work plan Introduction
Nikolaos TRIKOUPIS, TE-CRG-CI LS1 projects review: feedback on projects and lessons learnt 01/JUN/2015, Indico
Last but not least : LS2 General Safety 1 Thomas Otto, LS2 Safety Coordinator for LHC Ana-Paula Bernardes, LS2 Safety Coordinator for Injectors.
TE-CRG-CE OMP Meeting 06 / 11 / 2014TE-CRG-CE OMP Meeting.
Cryogenics for crab cavities – SPS/LHC 2 nd HiLumi LHC meeting – Frascati (Italy) 15 November 2012 K. Brodzinski and L. Tavian on behalf of cryogenic team.
25/04/2014R. Guida, A. Wasem PH-DT-DI Gas1 Outline ALICE gas systems meeting Outline Introduction Review usage of ALICE gas M&O 2013 Review achievements.
Project X Collaboration Plan Steve Holmes Accelerator Advisory Committee Meeting May 6-8, 2008.
D. Delikaris, TE-CRG, LSC 25th Meeting Page 2 October 18 th, 2013 LS1 Committee (LSC)- 25 th Meeting D. Delikaris, TE-CRG Cryogenics activities.
SwCDR (Peer) Review 1 UCB MAVEN Particles and Fields Flight Software Critical Design Review Peter R. Harvey.
Agenda 1 BOSS Meeting - 27/5/ : :10 Introduction and aims of the workshop 10‘ 09: :25 Priorities from OP for PSB and transfer lines 15'
TE-CRG Activities D. Delikaris, TE-CRG.
February 4 th, Quality assurance plan: production, installation and commissioning N.Vauthier TE-CRG Technical Review on Beam Screen Heater Electronics.
28 th January LHC Performance Workshop Session 8: (E)YETS and Long Shutdown 2 Strategy and Preparation. HL-LHC.
L. Tavian, TE/CRG, LSC Page 2 February 21 th, 2014 LS1 Committee (LSC) L. Tavian TE-CRG.
Project Management PTM721S
LS2 Safety Preparation Thomas Otto, LS2 Safety Support Officer for LHC
TE-CRG Activities A. Perin, on behalf on the Cryogenics Group.
LHC Performance Workshop LS1 Session Cryogenic system: strategy to achieve nominal performance and reliable operation J. Bremer, K. Brodzinski, J. Casas,
CERN Construction Planning and Scheduling (LHC installation)
Maintenance Action Plan following OMP of May 15th 2017
Status, Schedule and EVM for the test facility project
SPS Crab Cavity Test Stand: Safety review summary
Equipment simplified model SMR UR safety
WORK BREAKDOWN STRUCTURE
Feasibility and implication of installation of the string test in SM18 with a slope M. Bajko WP16.
Safety in Construction and Upgrade Phases
HEL – Safety aspects Christelle Gaignant
CMS gas systems meeting
Update of cryogenic activities
Nikolaos TRIKOUPIS on behalf of TE-CRG-CI CRG-TM for LS2 preparation Preliminary activities of the CI section 25/09/2017
Preparation of the activities for the LHC Long Shutdown 2
Accelerator and Experiment Interface Session: LS2, LS3
MPE main activities planned for LS2
Activities of the ME section during LS2 ( )
Cryogenic Risk Assessment in LHC
Overview & baseline of LS2 and roadmap for CRG
STEP 7 - EXECUTION PHASE: MONITORING & CONTROLING
Presented to the Project Certification Committee on June
بسم الله الرحمن الرحیم.
CERN with UNICOS M. Pezzetti AT_ECR_CE 27 June 2005.
Project Execution Activities
Real World PM Interactive Exercise
Radiation Working Group RADWG
Table 1. Project Control Factors and their hierarchy
Presentation transcript:

CRG-TM: LS1 projects review 1 June 2015

Goals of the review Report about the LS1 consolidation projects with the objective to Estimate the performance with respect to the planned baseline for technical performance, schedule, and budget. Qualitative and quantitative description of “what went well” and “what did not go so well” Extract “lessons learned” to improve future projects Produce an executive summary of the review to prepare future improvements

Subjects to be covered Preparation phase Work execution phase Technical preparation, Project management aspects, Safety aspects Work execution phase Technical aspects, Internal organization and coordination, Logistic aspects, Personnel management, QA, Project reporting. Commissioning and project closing phase Commissioning: Preparation, Coordination, NCs correction Project closing: Documentation, ECRs, QA records, storage of spares, Identification of future consolidation

Agenda Views from Project Engineers Views from support sections 14:00 – 14:10 Introduction and goals of the review, L. Tavian 14:10 – 14:30 Consolidation of ATLAS cryogenics, N. Delruelle 14:30 – 14:50 Consolidation of the DFBAs, A. Perin 14:50 – 15:20 Repairs of the QRL, K. Brodzinski 15:20 – 15:40 LHC sectors pressure tests, O. Pirotte 15:40 – 16:00 Pause 16:00 – 16:20 R2E&SEU consolidations, M. Pezzetti 16:20 – 16:35 Consolidations for E-cloud and High Voltage cards, N. Vauthier 16:35 – 16:50 Consolidations for the beam screen heaters electronics, N. Trikoupis 16: 50 – 17:10 LS1 projects feedback for ME section, O. Pirotte 17: 10 – 17:30 LS1 projects feedback for CE section, M. Pezzetti Views from support sections