DCLL TBM Reference Design

Slides:



Advertisements
Similar presentations
First Wall Heat Loads Mike Ulrickson November 15, 2014.
Advertisements

What is Dual Coolant Blanket? Siegfried Malang 2 nd EU-US DCLL Workshop2 nd EU-US DCLL Workshop University of California,University of California, Los.
Presented by: S. Suzuki, Blanket Engineering Lab., Japan Atomic Energy Research Institute, JAERI Contents 1.Outline of blanket development in JAERI 2.Design.
September 15-16, 2005/ARR 1 Status of ARIES-CS Power Core and Divertor Design and Structural Analysis A. René Raffray University of California, San Diego.
First Wall Thermal Hydraulics Analysis El-Sayed Mogahed Fusion Technology Institute The University of Wisconsin With input from S. Malang, M. Sawan, I.
June 14-15, 2005/ARR 1 Status of ARIES-CS Power Core Engineering A. René Raffray University of California, San Diego ARIES Meeting UW June 14-15, 2005.
March 16-17, 2000ARIES-AT Blanket Design and Power Conversion, US/Japan Workshop/ARR ARIES-AT Blanket Design and Power Conversion The ARIES Team Presented.
US ITER TBM DCLL TBM Design, Analysis and Development C. Wong, M. Dagher, S. Smolentsev and S. Malang FNS/TBM Meeting UCLA, September 19-20, 2007.
ARIES Meeting General Atomics, February 25 th, 2005 Brad Merrill, Richard Moore Fusion Safety Program Pressurization Accidents in ARIES-CS.
August 17, 2000 ARIES: Fusion Power Core and Power Cycle Engineering/ARR 1 ARIES: Fusion Power Core and Power Cycle Engineering The ARIES Team Presented.
Summary of Current Test Plan for US DCLL TBM in ITER Neil Morley and the US TBM Participants INL, August
November 4-5, 2004/ARR 1 ARIES-CS Power Core Options for Phase II and Focus of Engineering Effort A. René Raffray University of California, San Diego ARIES.
1 Wilfrid Farabolini 23 feb. 04Direction de l’Energie Nucléaire Tritium Control A Major Issue for a Liquid Metal Blanket.
The main function of the divertor is minimizing the helium and impurity content in the plasma as well as exhausting part of the plasma thermal power. The.
June19-21, 2000Finalizing the ARIES-AT Blanket and Divertor Designs, ARIES Project Meeting/ARR ARIES-AT Blanket and Divertor Design (The Final Stretch)
A design for the DCLL inboard blanket S. Smolentsev, M. Abdou, M. Dagher - UCLA S. Malang – Consultant, Germany 2d EU-US DCLL Workshop University of California,
US ITER TBM Meeting Idaho Fall, Idaho, Aug M Dagher P Fogarty 1.TBM/ITER General Arrangement 2.Equatorial Test port Configuration 3.Test Port.
Status of the ARIES-CS Power Core Configuration and Maintenance Presented by X.R. Wang Contributors: S. Malang, A.R. Raffray ARIES Meeting PPPL, NJ Sept.
March 20-21, 2000ARIES-AT Blanket and Divertor Design, ARIES Project Meeting/ARR Status ARIES-AT Blanket and Divertor Design The ARIES Team Presented.
The effect of the orientations of pebble bed in Indian HCSB Module Paritosh Chaudhuri Institute for Plasma Research Gandhinagar, INDIA CBBI-16, Sept.
2 nd EU-US DCLL Workshop University of California, Los Angeles, Nov th, 2014.
Development of the FW Mobile Tiles Concept Mohamed Sawan, Edward Marriott, Carol Aplin University of Wisconsin-Madison Lance Snead Oak Ridge National Laboratory.
1 ITER Test Blanket Module (TBM) Current U.S. Designs, Plans, Issues, and Material R&D Needs Prepared by: Presented at the MASCO meeting Washington DC,
Overview of LLCB TBM for ITER Paritosh Chaudhuri Institute for Plasma Research Gandhinagar, INDIA CBBI-16, Sept. 2011, Portland, USA.
1 Recent Progress in Helium-Cooled Ceramic Breeder (HCCB) Blanket Module R&D and Design Analysis Ying, Alice With contributions from M. Narula, H. Zhang,
Finite Elements Modelling of Tritium Permeation
Neutronics Parameters for Preferred Chamber Configuration with Magnetic Intervention Mohamed Sawan Ed Marriott, Carol Aplin UW Fusion Technology Inst.
October 27-28, 2004 HAPL meeting, PPPL 1 Thermal-Hydraulic Analysis of Ceramic Breeder Blanket and Plan for Future Effort A. René Raffray UCSD With contributions.
Engineering Overview of ARIES-ACT1 M. S. Tillack, X. R. Wang and the ARIES Team Japan/US Workshop on Power Plant Studies and Advanced Technologies
1 U.S. Presentation in TBWG-16 Beijing, China November 15 – 17, Overview of R&D, Time Schedule, and Cost Estimation M. Abdou (25 min.) 2.Possible.
Three-Dimensional Nuclear Analysis for the US DCLL TBM M. Sawan, B. Smith, E. Marriott, P. Wilson University of Wisconsin-Madison With input from M. Dagher.
MHD/Heat Transfer considerations for SiC FCI in DEMO and ITER Sergey Smolentsev DCLL Special Meeting at UCLA April 23-24, 2007.
ITER test plan for the solid breeder TBM Presented by P. Calderoni March 3, 2004 UCLA.
Tritium Extraction from a DCLL Blanket Prepared by: Scott Willms (LANL) Collaborators: Brad Merrill (INL), Siegfried Malang (Consultant), Clement Wong.
1 Parametric Thermal-Hydraulic Analysis of TBM Primary Helium Loop Greg Sviatoslavsky Fusion Technology Institute, University of Wisconsin, Madison, WI.
1 Neutronics Assessment of Self-Cooled Li Blanket Concept Mohamed Sawan Fusion Technology Institute University of Wisconsin, Madison, WI With contributions.
1 Neutronics Parameters for the Reference HAPL Chamber Mohamed Sawan Fusion Technology Institute University of Wisconsin, Madison, WI With contributions.
Base Breeding Blanket and Testing Strategy In FNF Conclusions Derived from Previous FNST Workshop, August 12-14, 2008.
R EFINEMENT OF THE P OWER C ORE C ONFIGURATION OF THE ARIES-ACT SA X.R. Wang 1, M. S. Tillack 1, S. Malang 2 and F. Najmabadi 1 1 University of California,
Background information of Party(EU)’s R&D on TBM and breeding blankets Compiled and Presented by Alice Ying TBM Costing Kickoff Meeting INL August 10-12,
Update on ARIES ACT2 Power Core Design and Engineering X. R. Wang, M. S. Tillack, C. Koehly ARIES Project Meeting 18 September2013 ARIES UC San Diego UW.
DCLL ½ port Test Blanket Module thermal-hydraulic analysis Presented by P. Calderoni March 3, 2004 UCLA.
Required Dimensions of HAPL Core System with Magnetic Intervention Mohamed Sawan Carol Aplin UW Fusion Technology Inst. Rene Raffray UCSD HAPL Project.
FNST Meeting UCLA, August 12 th -14 th, 2008 Brad Merrill 1, Phil Sharpe 1, Dai-Kai Sze 2 1 INL Fusion Safety Program 2 UCSD Tritium Permeation in HCLL/DCLL.
1 Discussion with Drs. Kwon and Cho UCLA-NFRC Collaboration Mohamed Abdou March 27, 2006.
ITER TBM MEETING March UCLA DCLL Module Design Prepared by M. Dagher UCLA P. Fogarty ORNL.
1 A Self-Cooled Lithium Blanket Concept for HAPL I. N. Sviatoslavsky Fusion Technology Institute, University of Wisconsin, Madison, WI With contributions.
ARIES ACT1 Power Core Engineering M. S. Tillack, X. R. Wang, F. Najmabadi, S. Malang and the ARIES Team ANS 20 th Topical Meeting on the Technology of.
Thermal-hydraulic analysis of unit cell for solid breeder TBM
Summary of Nuclear Input for Safety Analysis for the DCLL TBM -update-
Some General Guidelines for the US TBM Costing
Description of Thin Liquid Wall Protection w/Porous Walls
X.R. Wang, M. S. Tillack, S. Malang, F. Najmabadi and the ARIES Team
ITER Test Blanket Module (TBM)
Integrated Design: APEX-Solid Wall FW-Blanket
DCLL Blanket Analysis and Power Core Layout for ARIES-DB
University of California, San Diego
Trade-Off Studies and Engineering Input to System Code
U.S. Presentation in TBWG-16 Beijing, China November 15 – 17, 2005
University of California, San Diego
Manifolding and MHD issues
DCLL TBM Design Status, Current and future activities
Status of ARIES-CS Power Core Engineering
VLT Meeting, Washington DC, August 25, 2005
ARIES-CS Maintenance Scheme and Blanket Design for Modular Approach
Updated DCLL TBM Neutronics Analysis
US TBM Cost Activity Tom Mann December 12 – 14, 2005.
DCLL TBM Design Status FNST Meeting, August 12-14, 2008, UCLA
TBM Design Meeting UCLA
University of California, San Diego
Presentation transcript:

DCLL TBM Reference Design Setting up parameters for the Costing Exercise and For the Preliminary Design Phase Mission: Design, fabricate and commission the first DCLL blanket to be tested in ITER on day-one, to support the DCLL module testing goals during the HH phase of ITER and to prepare the module design and ancillary equipment for subsequent modules and corresponding tests. New TBM geometry Reference design and parameters Design temperatures Ancillary equipment Presented by C. Wong for the TBM team TBM conference call, August 31, 2005

New frame thickness at 20 cm Port frame Recent change in frame thickness to 20 cm changed the dimensions and power generation of the DCLL TBM. DCLL Design approach and Configuration remain the same. New module dimensions in mm 413 New frame thickness at 20 cm TBM Shield 1660 Dog leg Test port frame Cross-section 484 Flat surface will be used

US DCLL TBM module SS frame FCI is the Thermal and MHD All FS structures are He-cooled @ 8 MPa PbLi self-cooled flows in poloidal direction SS frame Front FCI is the Thermal and MHD Insulator lining all PbLi channels FS structure PbLi in PbLi out He in Back He out PbLi in FW He counter flow PbLi out 2mm Be front face

DCLL Design Parameters DCLL Design Module Materials: Structural material: Ferritic Steel, e.g. F82H Breeding material: Pb-17Li FW/structural coolant: 8 MPa helium Secondary coolant: 8 MPa helium Flow channel insert: SiC/SiC composite or metallic sandwich FW coating: Be, mm 2 Module Geometry: Port Frame front thickness, cm / “Dog leg” width, cm 20 / 3 Frame and TBM gap width, cm 2.0 TBM height, m 1.66 TBM width, m 0.484 Frontal area, m2 0.803 First wall shape flat Radial depth, m 0.413 ITER Neutron and surface loading: Neutron wall loading, MW/m2 0.78 Average surface loading, MW/m2 0.3 Max. surface loading, MW/m2 during transient for 10 s 0.5 Blanket energy multiplication 1.006 Tritium breeding ratio 0.741 Tritium production rate during pulse, #/s 2.054x1017 DCLL Design Parameters

DCLL Parameters Con’t Thermal parameters: Module thermal power, MW 0.872 He thermal power, MW 0.472 He Tin/Tout, C/C 360/440 He system pressure, MPa 8 He mass flow rate, kg/s 1.135 He volume flow rate, m3/s 0.201 He power fraction 0.541 PbLi thermal power, MW 0.4 PbLi pressure, MPa 2 TBM PbLi Tin/Tout, C/C 360/470 PbLi mass flow rate, kg/s 19.26 PbLi volume flow rate, m3/s 2.066x10-3 Ancillary equipment parameters: FW/FS loop He thermal power to TCWS, MW Secondary He to TCWS from the PbLi loop, MW (This system is designed to full module (100%) power) PbLi mass flow rate, kg/s @ Tin/Tout=360/470 C 42 kg/s 4.35x10-3 DCLL Parameters Con’t

DCLL TBM Bypass Loop Schematic Pump 360 C Tritium extraction tank Valve off 19.26 kg/s bypass line 180 C DCLL TBM 360 C 0 kg/s PbLi loop 8 MPa Helium loop PbLi/He Heat Exchanger Concentric pipe with FCI 470 C PbLi mixing tank 470 C 19.26 kg/s 0.4 MW 300 C Higher PbLi exit temperature can be achieved without requiring high-temperature materials for external piping/HX/TX. This can be achieved by turning the bypass valve “on” to allow mixing a lower temperature stream with the high-temperature stream in the PbLi mixing Tank

DCLL Design Temperatures Reference TBM operation limits Higher performance operation limits FS Tmax ≤ 550° C ≤ 550° C FS/PbLi < 500° C < 500° C SiC/PbLi < 500° C < 700° C SiC Tmax < 500° C < 700° C Coolant temperature range: 360° C < He < 440° C 360° C < He < 440° C 360° C < PbLi ≤ 470° C 450° C < PbLi ≤ 650° C For the DCLL TBM higher PbLi exit temperature ~650° C can be achieved via the bypass loop without requiring high-temperature materials for external piping/HX/TX.

DCLL He and PbLi Circuits Corresponding to Ancillary Equipment Pb-Li Primary Coolant Loop Transporter Area Secondary He Coolant Loop TCWS Test Port Primary He Coolant Loop

DCLL Ancillary Circuits Design Parameters Aim for testing flexibility He Pb-17Li Average neutron wall loading, MW/m2 0.78 Average surface heat flux, MW/m2 0.3 Blanket M 1.006 Thermal power, MW 0.472 0.872 Fraction of blanket power, % 54 100(a) Tin/Tout, oC 360/440 340/440 Coolant pressure, MPa 8 2 Mass flow rate, kg/s 1.14 46 Volume flow rate, m3/s 0.222 4.97x10-3 Tritium breeding ratio 0.741 (a)This allows the possibility of testing a complete liquid metal self-cooled blanket option

Helium and PbLi equipment and dimensions have been scoped and ready for preliminary costing exercise PbLi loop from TBM to transporter Primary He and Secondary He Ancillary equipment at TCWS @~70 m away from the TBM