Cutting Beam Horns in BC1

Slides:



Advertisements
Similar presentations
FEL Beam Dynami cs FEL Beam Dynamics T. Limberg Short Bunches at FLASH.
Advertisements

Nominal and no CSR (R 56-1 = 55 mm, R 56-2 = 59 mm, R 56-3 = 0) L1 phase = 21 deg, V 3.9 = 55 MV CSR OFF BC3 OFF Elegant Tracking  z1 = mm (post.
1 Bates XFEL Linac and Bunch Compressor Dynamics 1. Linac Layout and General Beam Parameter 2. Bunch Compressor –System Details (RF, Magnet Chicane) –Linear.
P. Emma FAC Meeting 7 Apr Low-Charge LCLS Operating Point Including FEL Simulations P. Emma 1, W. Fawley 2, Z. Huang 1, C.
P. Emma, SLACLCLS Commissioning – Sep. 22, 2004 Linac Commissioning P. Emma LCLS Commissioning Workshop, SLAC Sep , 2004 LCLS.
P. Emma, SLACLCLS FAC Meeting - April 29, 2004 Linac Physics, Diagnostics, and Commissioning Strategy P. Emma LCLS FAC Meeting April 29, 2004 LCLS.
Paul Emma LCLS Commissioning Status Nov. 11, 2008 SLAC National Accelerator Laboratory 1 LCLS Commissioning Status P. Emma for The.
FEL Beam Dynami cs FEL Beam Dynamics T. Limberg FEL driver linac operation with very short electron bunches.
Influence of the Third Harmonic Module on the Beam Size Maria Kuhn University of Hamburg Bachelor Thesis Presentation.
M. Venturini, Sept. 26, 2013, SLAC 1 ─ M. Venturini, Sept. 26, 2013, SLAC Marco Venturini LBNL Sept. 26, 2013 THE LATE NGLS: OVERVIEW OF LINAC DESIGN,
Providing Beams for Power Production What has been done Problems and Boundary Conditions Future improvements and possibilities.
TTF2 Start-to-End Simulations Jean-Paul Carneiro DESY Hamburg TESLA COLLABORATION MEETING DESY Zeuthen, 22 Jan 2004.
LCLS Accelerator SLAC linac tunnel research yard Linac-0 L =6 m Linac-1 L  9 m  rf   25° Linac-2 L  330 m  rf   41° Linac-3 L  550 m  rf  0°
Max Cornacchia, Paul Emma Stanford Linear Accelerator Center Max Cornacchia, Paul Emma Stanford Linear Accelerator Center  Proposed by M. Cornacchia (Nov.
Beam Dynamics and FEL Simulations for FLASH Igor Zagorodnov and Martin Dohlus Beam Dynamics Meeting, DESY.
A bunch compressor design and several X-band FELs Yipeng Sun, ARD/SLAC , LCLS-II meeting.
Intra-beam Scattering in the LCLS Linac Zhirong Huang, SLAC Berlin S2E Workshop 8/21/2003.
T. Limberg Position of the 3rd Harmonic System. Injector (with first Bunch Compression Stage) 2 European XFEL MAC May 2010 T. Limberg.
J. Wu J. Wu working with T.O. Raubenheimer, J. Qiang (LBL), LCLS-II Accelerator Physics meeting April 11, 2012 Study on the BC1 Energy Set Point LCLS-II.
‘S2E’ Study of Linac for TESLA XFEL P. Emma SLAC  Tracking  Comparison to LCLS  Re-optimization  Tolerances  Jitter  CSR Effects.
J. Wu J. Wu working with T.O. Raubenheimer LCLS-II Accelerator Physics meeting May 09, 2012 Study on the BC1 Energy Set Point LCLS-II Accel. Phys., J.
Preliminary Tracking Results through LCLS-II P. Emma et al., Oct. 23, 2013 Thanks to Mark Woodley and Yuri Nosochkov for MAD design work Use Christos Papadopoulos.
T. Atkinson*, A. Matveenko, A. Bondarenko, Y. Petenev Helmholtz-Zentrum Berlin für Materialien und Energie The Femto-Science Factory: A Multi-turn ERL.
Franz-Josef Decker 14-Dec-2011 CSR is a big deal limiting performance Tolerance studies beforehand helped a lot Tor’s List Software adaptability helped.
X-band Based FEL proposal
XFEL Beam Dynamics Meeting Bolko Beutner, DESY First results of micro-bunching and COTR experiments at FLASH Bolko Beutner, Winfried Decking,
PAL-XFEL Commissioning Plan ver. 1.1, August 2015 PAL-XFEL Beam Dynamics Group.
A single-shot method for measuring fs bunches in linac-based FELs Z. Huang, K. Bane, Y. Ding, P. Emma.
Operation and Upgrades of the LCLS J. Frisch 1,R. Akre 1, J. Arthur 1, R. Bionta 2, C. Bostedt 1, J. Bozek 1, A. Brachmann 1, P. Bucksbaum 1, R. Coffee.
SABER Longitudinal Tracking Studies P. Emma, K. Bane Mar. 1, 2006
Frank Stulle, ILC LET Beam Dynamics Meeting CLIC Main Beam RTML - Overview - Comparison to ILC RTML - Status / Outlook.
LSC/CSR Instability Introduction (origin of the instability) CSR/LSC
Multi-bunch Operation for LCLS, LCLS_II, LCLS_2025
Beam dynamics for an X-band LINAC driving a 1 keV FEL
Status of the MAX IV Short Pulse Facility
Sara Thorin, MAX IV Laboratory
Short pulse, low charge LCLS operation
Tunable Electron Bunch Train Generation at Tsinghua University
Beam-Based Feedback in LCLS-II
XFEL Beam Physics 10/30/2015 Tor Raubenheimer.
Review of Application to SASE-FELs
F. Villa Laboratori Nazionali di Frascati - LNF On behalf of Sparc_lab
CSR Benchmark Test-Case Results
Time-Resolved Images of Coherent Synchrotron Radiation Effects
Diagnostics overview and FB for the XFEL bunch compressors
LCLS Longitudinal Feedback and Stability Requirements
Laser assisted emittance exchange to reduce the X-ray FEL size
G. Marcus, Y. Ding, J. Qiang 02/06/2017
Simulation Calculations
Z. Huang LCLS Lehman Review May 14, 2009
Two-bunch self-seeding for narrow-bandwidth hard x-ray FELs
Linac/BC1 Commissioning P
Design of Compression and Acceleration Systems Technical Challenges
LCLS Commissioning P. Emma, et al
LCLS Tracking Studies CSR micro-bunching in compressors
Modified Beam Parameter Range
Longitudinal-to-transverse mapping and emittance transfer
Longitudinal-to-transverse mapping and emittance transfer
Laser Heater Integration into XFEL. Update.
Gain Computation Sven Reiche, UCLA April 24, 2002
Linac Physics, Diagnostics, and Commissioning Strategy P
First results of micro-bunching and COTR experiments at FLASH
Diagnostics RF and Feedback
Operational Experience with LCLS RF systems
LCLS Injector Commissioning P
Achieving Required Peak Spectral Brightness Relative Performance for Four Undulator Technologies Neil Thompson WP5 – 20/03/19.
Linac Design Update P. Emma LCLS DOE Review May 11, 2005 LCLS.
LCLS Longitudinal Feedback System and Bunch Length Monitor Juhao Wu Stanford Linear Accelerator Center LCLS DOE Review, February 08, 2006 LCLS longitudinal.
Bunch Compression Experiment in VUV-FEL BC3
New VUV-FEL Simulation results
Presentation transcript:

Cutting Beam Horns in BC1 Paul Emma, Josef Frisch

Why and what In LCLS compression system tails on the beam are folded over by longitudinal wakefields and produce high peak current spikes on the ends of the bunch The high current spikes cause CSR emittance growth Investigate cutting the ends off the bunch in BC1 LiTrack calculations. Need to do MD experiment Note – might have issues with stability, transverse wakes etc. Start at 250 pC, cut tails to get 150 pC. Compare with standard 150 pC operation Compare for ~3KA peak current

Operating Conditions 150 pC Case (no cuts) 560 um bunch length from gun L1S = -22.6 deg., L1X = 20MeV, L2 = -33.3 deg. Set to get good energy spread in LiTrack 250 pc Case (BC1 cuts to 150 pC) L1S = -21.3 deg. L1X = 20MeV, L2 = -37 deg Set for good energy spread in LiTrack

Beam before BC1 150 pC (no cuts) 250 pC will cut to 150 pC

Beam after BC1 150 pC (no cuts) 250 pC cut to 150 pC -1.6%, +0.8% energy cut

Beam before BC2 150 pC (no cuts) 250 pC cut to 150 pC

Beam at Undulator 150pC (no cuts) 250pC cut to 150pC

Set L2 phase for ~6KA 150pC (no cuts) 250pC cut to 150pC

Set L2 Phase for max compression

Max Compression Wakefields, longitudinal space charge and CSR will probably make FEL operation at high current impossible. Might be interesting for THz – Near IR generation. For clipped beam, peak current limited by beam longitudinal phase space. What if we turn off the heater……..

Just for fun >300 kA! This is NOT a possible operating mode, but it does indicate that the nonlinear wakefields are well compensated.

Practical Issues Collimators – exist in BC1 Radiation: cutting 100 pC, 120 Hz, 250 MeV = 3W (out of 7.5W total beam). OK with Stan Mao for 2 shift test (up to 5 W) Probably need to bypass MPS toroids May need extra shielding for long term running Similar load to TD11, so not impractical Measurements TCAV3, ALINE, and FEL performance

Rough Experiment Plan Start with good FEL operation at 150 pC Set injector to 250 pC, Tune for emittance to WS12 Clip tails with BC1 collimator to get 150 pC Remeasure WS12 emittances (effect?) Compare % cut from each collimator with LiTrak Use OTR11 to look at collimators cutting beam (COTR not too bad here) Measure profiles with TCAV3 (with cuts and without) Maybe work at partial compression to set cuts. Tune resulting 150 pC beam for good emittance Measure emittance and FEL performance as compression is changed. Compare with normal 150 pC running Optional – measure beam profile using ALINE Optional – look at THz and COTR from maximum compression beam.