Permitting Process Overview Alasdair McKellar PPC Compliance Officer Environment Agency.
Advertisements

Best Available Techniques (BAT)
© European Communities, 2007 Purpose The European Integrated Pollution Prevention and Control Bureau (European IPPC Bureau) of the JRC/IPTS was set up.
EU FORMAL REGULATION – TYPES OF STANDARDS ENVIRONMENTAL QUALITY OBJECTIVES ENVIRONMENTAL QUALITY STANDARDS.
EU FORMAL REGULATION – TYPES of STANDARD MINIMUM EMISSION STANDARD (sometimes known as LIMIT VALUES) UNIFORM EMISSION STANDARD.
HR 09 IB EN 02 – German Proposal, Zagreb, 10 June 2011 Page 1 April 12, Strengthening the Ministry of Nature Protection of the Republic of Armenia.
Industrial Pollution Control - Harmonization and Implementation in Bulgaria Slavitza Dobreva Ministry of Environment and Water Bulgaria Final Seminar.
IPPC and Industry By Dr. Ken Macken Dublin Regional Licensing Manager.
Industrial Pollution Control and Risk Management: IPPC Neil Emmott Environment Directorate-General 7 April 2006.
Law approximation and implementation in Hungary Ministry for Environment Department of Integrated Pollution Control Nicosia, May 2001 Andrea Nám, desk.
BULGARIAN COMPETENT AUTHORITIES IN THE FIELD OF IPPC Kalin Iliev Ministry of Environment and Water Bulgaria.
Practical use of newly developed BAT conclusions Valts Vilnītis.
Grupowa Oczyszczalnia Ścieków Łódzkiej Aglomeracji Miejskiej Fot: U. Czapla Practical aspects of compliance with the Integrated Permit requirements based.
ECENA 4 th Exchange Programme Cluj Napoca, October, 2005 National Updates in the Transposition and Implementation of IPPC directive Ministry of Environment.
IPPC IN MINING AND METALLURGY IN THE REPUBLIC OF MACEDONIA Bosko Nikov
The European IPPC Bureau Institute for Prospective Technological Studies (IPTS) Seville, Spain Internet E.mail : Don.
Chapter # 1 Introduction To Pollution Prevention.
The IPPC Directive and EPER Iksan van der Putte. Objectives of IPPC (Integrated Pollution Prevention and Control) To prevent or minimise emissions To.
BAT as a main tool for minimisation of the negative impact of industrial activities Aivi Sissa Tallinn – Estonia 27 – 28 March 2008.
Acquis communautaire in Chapter 27 – Environment
Integrated and Planned Enforcement of Environmental Law Phare Twinning Project CZ03/IB/EN/01 Analysis of minimal criteria for environmental inspection.
The Sevilla process for supporting the implementation of the IPPC Directive Michael Parth Tallinn – Estonia 27 – 28 March 2008.
Regulation of pollution sources in some EU-countries Hans-Roland Lindgren Swedish EPA.
Egyptian and Italian Cooperation Programme on Environment Best Available Techniques (BAT) Mr. Giorgio Grimaldi Mr. Giorgio de Benedetti 1 Workshop: “Best.
Workshop, 12/3/2004 Banska Bystrica – SLOVAC REPUBLIC “INTEGRATED LICENCE PROCEDURE (Greek case)” Katerina Iakovidou-Anastasiadou Hellenic Ministry for.
PRTR-online survey. Questions – Items Question 3 – Item 2.
Croatian Report on new Environmental Protection Law Josipa Blažević-Perušić, B.Sc. Arch. State Secretary Anita Pokrovac-Patekar, B.Sc. Pharm. Senior Environmental.
Review of practice of ELVs and other conditions setting in EU member states for non-Annex I installations Valts Vilnītis.
Implementation of IPPC and its application to sectors in different industrial scales – Experience of Czech Republic Jan Slavík, IPPC Unit - MoE of Czech.
The IPPC Directive and its implementation Alexandre Paquot European Commission Environment Directorate-General Phare Capacity.
Ministry of Waters and Environmental Protection, ROMANIA 1 BERCEN 1 st Exchange program – November 2002 Croatia PROBLEMS AND SOLUTIONS IN COOPERATION.
1 Permitting of industrial facilities in Croatia.
IPPC transposition and experience with its implementation in the Czech Republic ?? …!! AjPíPíSí ??
1 Workshop on the Directive 96/61/EC concerning (IPPC) Integrated pollution prevention and control INFRA Public participation & access to environmental.
The Process of Development of IPPC Legislation Robert Sarlamanov MA, IPPC Expert Ministry of Environment and Physical Planning, Bercen Exchange Programme,
Slovak Environmental Inspectorate Procedure of issuing the permits in the Slovak Republic.
The European IPPC Bureau Institute for Prospective Technological Studies (IPTS) Seville, Spain Internet E.mail : Don.
Implementing legislation for Integrated Permitting Monika Pribylova 1 October 2013 года Air Quality Governance in the ENPI East Countries.
IPPC vs Emissions Trading Lesley James Friends of the Earth (England, Wales & N.Ireland) and the European Environmental Bureau.
The legal background for implementing the IPPC, EPER, and PRTR Protocol Requirements Orsolya Adamovics Department for Conservation of Environment Ministry.
Strengths and weaknesses of the permitting system and enforcement process in RIEW – Veliko Turnovo Regional Inspectorate of Environment and Water - Veliko.
REVISION OF THE IPPC DIRECTIVE  DIRECTIVE ON INDUSTRIAL EMISSIONS.
Brownfields in Baltic States - Lifelong Educational Project CZ/08/LLP-LdV/TOI/ Legal aspects of brownfield redevelopment in Latvia Edmunds Teirumnieks.
Iuliana CHIDU European integration counsellor Ministry of Environment and Water Management Prague - CZECH REPUBLIC April 2005 DIRECTIVE 96/61/EC.
How to start with the implementation of IPPC Directive Czech Republic Czech Environmetal Inspectorate.
Integrated and Planned Enforcement of Environmental Law Phare Twinning Project CZ03/IB/EN/01 Page 1 TRANSBOUNDARY EFFECTS Gijs van Luyn InfoMil.
Integrated and Planned Enforcement of Environmental Law Phare Twinning Project CZ03/IB/EN/01 MONITORING Mr. Jan Prášek IPPC Agency.
Page 1 Annexes of the Directive 96/61/ES on IPPC Agency on Integrated Prevention Ms. Lucie Svobodová Integrated and Planned Enforcement of Environmental.
Integrated and Planned Enforcement of Environmental Law Phare Twinning Project CZ03/IB/EN/01 Integrated Inspection Plan Marcel Stigter Policy Advisor DCMR.
CROATIA Country Report IPPC Directive: implementation, problems, constraints, open questions,… Anita Pokrovac Patekar, B. Sc. Pharm. Ministry of Environmental.
Group EIA 1: Screening for Annex 2 Both:- case-by-case - thresholds < 10% goes to EIA All Countries have problems with “Salami Slicing” Little Information.
Achievements in IPPC Directive Implementation: problems and constraints Albania Ministry of Environment 3 rd BERCEN Exchange Programme for the Environmental.
3rd BERCEN Exchange Programme for the Environmental Enforcement Agencies and Inspectorates, October 19-22, 2004 Prague, Czech Republic Achievements in.
Ministry for Ecology, Energy, Sustainable Development and Sea in charge of Green Technologies and Climate Negotiations
Integrated and Planned Enforcement of Environmental Law Phare Twinning Project CZ03/IB/EN/01 InfoMIL Rob Bakx InfoMil – Twinning Advisor.
Integrated and Planned Enforcement of Environmental Law Phare Twinning Project CZ03/IB/EN/01 1 The IPPC Directive Introduction to the philosophy Rob Kramers.
IPPC A general overview Nigel Barraclough Policy Adviser Industrial Pollution Control Branch Air and Environment Quality Division. Taiwanese Environmental.
M O N T E N E G R O Negotiating Team for the Accession of Montenegro to the European Union Working Group for Chapter 27 – Environment Bilateral screening:
Introduction to the philosophy
MONITORING Mr. Jan Prášek IPPC Agency.
BAT - BREF Their scope Rob Kramers Senior advisor InfoMil.
ENVIRONMENTAL IMPACT ASSESSMENT
Annexes of the Directive 96/61/ES on IPPC
INTEGRATED PERMITTING PROCEDURE IN THE CZECH REPUBLIC
ENVIRONMENTAL LAW.
Nick Bonvoisin Secretary to the Convention on the
Aleksandra Antonowicz Green Federation GAJA/CCB
Industrial Emissions Directive Targeted stakeholder survey
WFD CIS Working Group Meeting Brussels, 4/4/2019
Presentation transcript:

INTEGRATED PERMITTING IPPC DIRECTIVE: BEST PRACTICE Integrated and Planned Enforcement of Environmental Law Phare Twinning Project CZ03/IB/EN/01 INTEGRATED PERMITTING IPPC DIRECTIVE: BEST PRACTICE Ms. Jitka Zagorová CEI Agency on Integrated Prevention

Integrated and Planned Enforcement of Environmental Law Phare Twinning Project CZ03/IB/EN/01 Origin of IPPC – Directive 96/61/EC on IPPC from 1996, in EU in force since the year 1999 Purpose of the Directive is to achieve integrated prevention and pollution control arising as a result from activities which are listed in the Annex I. The Directive sets measures which should eliminate or reduce emissions from the above mentioned activities into the air, water and soil, including measures relating to waste on behalf of reaching a high level of protection of the environment as a whole.

IPPC - Principles Integration Integrated and Planned Enforcement of Environmental Law Phare Twinning Project CZ03/IB/EN/01 IPPC - Principles Integration Environmental Impact Assessment of the installation operation as a whole. Unified approach when setting conditions in the IP (=integrated permit) within EU. Transfer from independent protection of individual environ. media to protection of the environment as a whole (prevention of pollution transfer from one media into another one). Page 3

IPPC - Best practice One permit, one permitting place Integrated and Planned Enforcement of Environmental Law Phare Twinning Project CZ03/IB/EN/01 IPPC - Best practice One permit, one permitting place Permits are issued by Regional Authorities – they are co-ordinators of individual specialised statements on the protection of the environment and human health. The permit replaces several decisions, opinions and approvals, required for the construction permit. Page 4

IPPC - Best practice Subsidiary principle Integrated and Planned Enforcement of Environmental Law Phare Twinning Project CZ03/IB/EN/01 IPPC - Best practice Subsidiary principle Transfer of decision competencies to the lowest possible level. Decision-making on the regional level. Page 5

IPPC - Best practice Dialogue and negotiation Integrated and Planned Enforcement of Environmental Law Phare Twinning Project CZ03/IB/EN/01 IPPC - Best practice Dialogue and negotiation It is used when setting concrete conditions in permits for operation - between the RA and the operator Page 6

IPPC – Best practice Transparency Integrated and Planned Enforcement of Environmental Law Phare Twinning Project CZ03/IB/EN/01 IPPC – Best practice Transparency Possibility for active participation of the public in the process of setting conditions for the operation permit Possibility for all people interested to get relevant documents during the permitting procedure Page 7

Integrated and Planned Enforcement of Environmental Law Phare Twinning Project CZ03/IB/EN/01 IPPC – Best practice Harmonisation of media-based limits and BAT parameters Media-based emission limits and BAT limits sometimes differ. Prescribed emission limit values in the IP must not be lowered and enable their breaching It is not possible to prescribe any techniques or concrete technologies Page 8

Integrated and Planned Enforcement of Environmental Law Phare Twinning Project CZ03/IB/EN/01 IPPC Goals Create a base for protection of the human health and the environment Reach a high level of the protection of the environment as a whole Page 9

Methods for achieving goals Integrated and Planned Enforcement of Environmental Law Phare Twinning Project CZ03/IB/EN/01 Methods for achieving goals Set emission limit values for pollutants for which it is probable that they will be emitted in a significant amount Prevent arising of pollution The primary measure is the reduction of emissions directly at the source of pollution The secondary measure are end-of-pipe technologies for catching or disposal of emissions Prevent transfer of pollution from one medium into another Page 10

Methods for achieving goals Integrated and Planned Enforcement of Environmental Law Phare Twinning Project CZ03/IB/EN/01 Methods for achieving goals Prevent creation of waste, recycle or safely dispose waste When applying BAT take into account technical character of the relevant installation, its geographical location, environmental conditions of the place in the place of installation location Economically deal with nature resources: Effectively use energy, raw materials, supportive materials, water, etc. Fulfil accident prevention When closing of operation, put the location into the previous state Page 11