Lunar Calibration Workshop Activities

Slides:



Advertisements
Similar presentations
1 Weekly Report on GOES-14 PLT Science Test NOAA / NESDIS / STAR X. Wu, G. Rancic, F. Yu, M. Grotenhuis December 14, 2009.
Advertisements

Report from USGS 17th GSICS Executive Panel, Biot, 2-3 June 2016 Thomas Stone U.S. Geological Survey, Flagstaff, Arizona USA GSICS-EP-17, Biot, 2-3 June.
GSICS Coordination Center Report Fangfang Yu, Fuzhong Weng, Fred Wu and George Ohring NOAA/Center for Satellite Applications and Research 8 April, 2013.
Lunar Calibration Workshop General discussion Sébastien Wagner (EUMETSAT) In collaboration with Tom Stone (USGS) Sophie Lachérade, Bertrand Fougnie (CNES)
Lunar Calibration Workshop Preparation Sébastien Wagner (EUMETSAT) In collaboration with Tom Stone (USGS) Sophie Lachérade, Bertrand Fougnie (CNES) Jack.
Beyond the workshop: Developing inter-calibration products based on Lunar Observations Tim Hewison (EUMETSAT) [GSICS Research Working Group Chair] Special.
Thomas C. Stone U.S. Geological Survey, Flagstaff, AZ USA GSICS Research Working Group Meeting EUMETSAT 24−28 March 2014 Using the Moon as a Radiometric.
PLEIADES Lunar Observations Sophie Lachérade, Bertrand Fougnie
Future eumetsat missions: MTG/FCI, MTG/UVNS and EPS-SG/METimage
Description of the giro ON THE DETAILS OF THE IMPLEMENTATION
PREPARATION OF THE GiRO executable
Tim Hewison (1) Sébastien Wagner (1), Tom Stone (2), Gary Fowler (1)
Calibrating the METEOSAT SEVIRI solar channels using lunar observations Sébastien Wagner (1) Bartolomeo Viticchie (1), Tom Stone (2), Tim Hewison(1), Gary.
GRWG VIS/NIR Sub-Group Briefing Report
Update on Lunar Calibration Development
2017 Annual Meeting Preparation and Proposal of CLARREO-like Workshop by GSICS/IVOS Scott NSMC/CMA March 20-24, 2017.
Second Joint GSICS-IVOS Lunar Calibration Workshop
Sébastien Wagner, Tim Hewison In collaboration with D. Doelling (NASA)
Technical Expectations from Organizers & Participants B. Fougnie, S
Doelling, Wagner 2015 GSICS annual meeting, New Delhi March 20, 2015
The ROLO Lunar Calibration System Description and Current Status
Sébastien Wagner (1) Tom Stone (2), Gary Fowler (1), Tim Hewison (1)
Data Preparation for Using the ROLO / GIRO Model
Lunar Calibration activities
Actions and Recommendations of the Joint Session
Update on Advancing Development of the ROLO Lunar Calibration System
Future Developments of the Lunar Calibration System
Status of the Data Preparation Bertrand Fougnie – Sophie Lachérade
PREPARATION OF THE GiRO executable
Sébastien Wagner (EUMETSAT) Tom Stone (USGS)
Update on the GIRO Benchmark
Outcome of the Second Joint GSICS/IVOS Lunar Calibration Workshop
Lunar reflectance model based on SELENE/SP data
GRWG VIS/NIR sub-group briefing report
Combining Multiple References
Sensitivity ANALYSIS Sébastien Wagner (EUMETSAT) In collaboration with
Alternative Uses of Lunar Measurements for Satellite Instrument Calibration Xiangqian Wu.
Proposal of SI-traceable IR and VIS Hyperspetral reference Workshop by GSICS/IVOS Scott NSMC/CMA.
Update on GSICS Product Development
Moving toward inter-calibration using the Moon as a transfer
Sensitivity ANALYSIS Sébastien Wagner (EUMETSAT) In collaboration with
Strategy for calibration references
Definition of a benchmark for the GIRO
Inter-calibration of the SEVIRI solar bands against MODIS Aqua, using Deep Convective Clouds as transfer targets Sébastien Wagner, Tim Hewison In collaboration.
Data policy, data usage and dataset update
Strategy for calibration references
Special Issue of the IEEE TGRS on “Inter-Calibration of Satellite Instruments”: 17 January 2019 GSICS Research Working Group Web Meeting Planning.
Summary of the Achievements to date
Lunar Calibration Workshop
Lunar Calibration Workshop Wrap up, next steps and list of actions
Current Status of ROLO and Future Development
GSICS Research Working Group Web Meeting :00-13:00 UTC Reference Instruments and their Traceability.
Traceability of the GIRO to the ROLO: Definition of a benchmark
Special Issue of the IEEE TGRS on “Inter-Calibration of Satellite Instruments”: 07 April 2019 Outcomes of 2016 GRWG Meeting JAXA, Tsukuba, Japan Tim Hewison.
Use of GSICS to Improve Operational Radiometric Calibration
Progress toward DCC Demo product
Hot summary of the Fourth GSICS Users Workshop
Inter-band calibration using the Moon
Discussion on Solar Spectra for Vis/NIR Calibrations
S3B OLCI Lunar Observations
The GSICS Lunar Observation Dataset
Update on Lunar Measurements in China
GRWG VIS/NIR sub-group briefing report
Revising the ROLO Lunar Model — A Status Update
VIS/NIR sub-group discussion
Infrared Sub-Group Report Tim Hewison
Special Issue of the IEEE TGRS on “Inter-Calibration of Satellite Instruments”: 21 May 2019 Special session on re-calibration/re-processing – Discussion.
Lunar Calibration Workshop Activities
Toward a synergy between on-orbit lunar observations
Lunar Calibration Workshop Status of the preparation
Presentation transcript:

Lunar Calibration Workshop Activities X. Hu (CMA), T. Stone (USGS), X. Wu (NOAA), S. Wagner (EUMETSAT) With the support of B. Fougnie (CNES) T. Hewison (EUMETSAT)

Main topics Four main sessions: Measurements and Moon observations (Scott Hu - CMA) Using the ROLO/GIRO (Tom Stone - USGS) Inter-calibration using the Moon (Sebastien Wagner - EUMETSAT) Alternative methods and applications (Fred Wu - NOAA)

Measurements and Moon observations Focus = measurement/observation campaigns + outcome of those campaigns, with the purpose of improving the lunar calibration reference CMA to present the current status of its data analysis from the 2015-2016 activities. Plans that CMA may have for future activities. Use of CIMEL instruments for Moon irradiance measurement (uncertainties in the lunar calibration reference + possibility to use those data for refinement of the reference) Establish a comprehensive catalogue / description / evaluation of existing data  may also lead to recommendations of which critical information is missing and how to acquire it. General discussion.

Measurements and Moon observations Plans for inviting scientists from NIST, Chinese institutes, ESA Hyperspectral observation from space: SCIAMACHY GOME-2 HYPERION ? Contact JAXA for ground-based measurements Template/questionnaire will be provided to data owners to provide information about the datasets ⇒ provided by end of April for review ⇒ distribution by end of May (?)

Practical application of the GIRO/ROLO model Accuracy of irradiance measurements from lunar images Each user to discuss : oversampling: evaluation method and uncertainty dark level: evaluation method and uncertainty selection of Moon pixels sensor sensitivity to polarization inter-band comparisons  Template will be provided to participant (same timescale than the dataset template) New developments of the GIRO/ROLO model increasing the spectral resolution to accommodate spectrometer instruments tied to the solar spectrum, and its line structure requires a reference solar spectrum (presentation 8r)

Practical application of the GIRO/ROLO model New developments of the GIRO/ROLO model (cont.) new specification of the lunar reflectance spectrum to account for different reflectance characteristics of light and dark areas on the Moon — tied to the librations potential to use SCIAMACHY data to develop an empirical add-on recent efforts on correction to ROLO e.g. CNES, using PLEIADES data for phase correction Update on benchmarking tool/dataset (presentation 8i) users of the benchmark to present on results dependent on having the benchmark available

Alternative approaches? Participants to report… Inter-calibration Algorithm presented by EUMETSAT could be implemented and tested against VIIRS Alternative approaches? Participants to report… Inter-band calibration? TBC which session…

Alternative methods and applications Radiometric calibration using lunar radiance Quantification of Modulation Transfer Function (MTF) using lunar image Detection of ghosting and crosstalk. Radiometric calibration in IR and MW spectrum. Inter-channel calibration. Proba-V (Stephan Adriaensen / Marc Bouvet) Correction of VIIRS DNB SRF (Jack Xiong) Use of IR hyperspectral measurements (IASI – CNES?)  Call for contribution will be made

Basic roll out… Result of the Doodle  LCWS last week of October / first week of November Till then: Survey to know where participants want/can contribute At least 2 web meetings (dates TBC) Templates for presentations  end of May Homework…