Propose to replace HPDs in R1 and R2 with SIPMs, ASAP

Slides:



Advertisements
Similar presentations
Presentation – 1 Nov 2011 Jim Jackson, NRAO EVLA/VLBA Project / Systems Engineer Synthesizers.
Advertisements

HCAL RBX PRR Overview Jim Freeman RBX PRR March 1-2, 2001.
Steve Hahn, CDF Meeting - October 7, CDF Operations Summary Shutdown progress  Work finishing up in west and east bores COT  Loose cables SVX 
Simulation Workshop on CMS Calorimetry, Ooty, Feb 18 – 20, HCAL Status CMS HCAL Status Jim Freeman.
Status & Goals of LHC 1 1pb-1 of delivered and recorded luminosities reached! As of this morning: Delivered: 1420 nb-1 Recorded: 1245 nb-1 New record Inst.
RBX Integration Review Dec 18, Readout Integration Lab 5 Jim Freeman Overview Dec 18, 2001.
Magnetic Field Studies Dan Karmgard for the HCAL RBX Group.
MTCC –II & HCAL noise chasing Mandakini Patil India-CMS meeting Jan07 Shantiniketan.
1 Ist Virgo+ review Cascina H. Heitmann Alignment: Virgo+ changes.
Pixel Upgrade Plans ROD/BOC PRR July 17, 2013 T. Flick University of Wuppertal.
1 HCAL Upgrade TP simulation studies Jane Nachtman (Iowa) – for the HCAL group Trigger Upgrade meeting April 28, 2010.
2 1/March/2015 日本物理学会大70回年次大会@早稲田大学 東大ICEPP 内山雄祐 他 MEG II collaboration.
1 Dec SPP-Fields Antenna Electronics Board (AEB) Concept Status Report J.W.Bonnell, S. Harris, S. Heavner Space Sciences Laboratory UC Berkeley.
Proposal for participation in Si-PM testing and Upgrade work HEP Group Department of Physics Panjab University Chandigarh M. India-CMS meeting,
November 18, 2008 John Haggerty 1 PHENIX In Run 9 John Haggerty Brookhaven National Laboratory.
HPD Development Project is DONE! The Future is Quality assurance Database management Alignment Production of cookies and mounts Electronics interfacing.
Upgrade of the CMS hadron outer calorimeter with SiPM’s
CCM Resources 1. Project Cost Overview (1) Boards 1&5 (spares) [completed/to be done] – Eng. time to recover layout files. – Designer time for minor layout.
STATUS OF HO Sudhakar Katta TIFR, Mumbai India-CMS meeting, Delhi 27 th Sept 2007.
Scintillating Tiles for the Muon Inner regions LHCb Muon Upgrade meeting, CERN May Wander Baldini for the Ferrara LHCb group.
QCAL upgrade status FE electronic replacement actual status future design test E. Santovetti KLOE General meeting December 2002.
October 3, 2008 John Haggerty 1 PHENIX Plan for Run 9 John Haggerty Brookhaven National Laboratory.
Andris Skuja :: January 2012 Kolkata-Mumbai Workshop Overview1 H C A L Kolkata-Mumbai HCAL Upgrade Workshop Overview of HCAL Upgrade Workshop Andris Skuja.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept and status of the PSD temperature control - Concept of the PSD analog part.
SiPM Readback Noise Tagging & HCAL Calibration Dayton Thorpe July 8, 2010.
IP instrumentation configuration for Autumn 2010 ATF2 runs Toshiyuki OKUGI, KEK 2010 / 7/ 1 10 th ATF2 project meeting.
03/22/2007HCal Electronics Meeting HO LIGHT GUIDE SIMULATIONS Justin Parsons, University of Iowa Jim Freeman, FNAL HO LIGHT GUIDE SIMULATIONS 1.
Status of Muon Activities W.Baldini, N. Bondar, O.Maev, B. Schmidt LS1 Meeting Dec. 20-rd 2013.
Upgrade of the CSC Endcap Muon Port Card with Spartan-6 FPGA Mikhail Matveev Rice University 30 April 2012.
Calorimeter Digitisation Prototype (Material from A Straessner, C Bohm et al) L1Calo Collaboration Meeting Cambridge 23-Mar-2011 Norman Gee.
General Muon Meeting, 03-March-2014 Jay Hauser “Update on Phase 2 muon Technical Proposal”  Recent developments:  ME0 inserted into HGCAL as for other.
M. Bonesini – CM 291 PID detectors summary M. Bonesini Sezione INFN Milano Bicocca.
H C A L 11 th International Conference on Advanced Technology and Particle Physics Villa Olmo (Como - Italy), October 5 - 9, 2009 THE PERFORMANCE OF THE.
Performance of PHENIX High Momentum Muon Trigger.
Plans and Progress on the FPGA+ADC Card Pack Chris Tully Princeton University Upgrade Workshop, Fermilab October 28, 2009.
HBD Status Report from Run 9 Craig Woody BNL DC Meeting July 8, 2009.
FT Prototype Test Purpose: test the prototype of the FT Calorimeter and Scintillator Hodoscope Technique: prototype is installed under the Hall B photon.
PHENIX WEEKLY PLANNING 3/02/06 Don Lynch. BLM Test.
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept of the PSD temperature stabilization and control - Upgrade of HV control system.
Progress and plans for HO Installation S. Dugad, K. Sudhakar Tata Institute of Fundamental Research India-CMS Meeting at BARC, July 2005.
Status of HO Installation Shashi Dugad Tata Institute of Fundamental Research India-CMS Collaboration Meeting, Chandigar April 2007.
August 24, 2011IDAP Kick-off meeting - TileCal ATLAS TileCal Upgrade LHC and ATLAS current status LHC designed for cm -2 s 7+7 TeV Limited to.
Sensitivity of HO to Muons Shashi Dugad for HO group India-CMS Meeting 6-7 Oct
1 Projectile Spectator Detector: Status and Plans A.Ivashkin (INR, Moscow) PSD performance in Be run. Problems and drawbacks. Future steps.
Status of Prototype Preparation (I) Wander Baldini On behalf of the Ferrara SuperB group SuperB Workshop, LNF Dic. 2-nd 2009.
TDAQ and L1Calo and Chamonix (Personal Impressions) 3 Mar2010 Norman Gee.
Overview B A B AR L1 DCT Upgrade FDR Masahiro Morii Harvard University Scope of the Project Current Status Schedule  Commissioning.
Proposal for the after-pulse effect suppression  Observation of pulses and after-pulses  Shape measurement  Algorithm  Results  Efficiencies for after-pulse.
Performance of B-sensor types EUDET NIKHEF VS F. Bergsma 12/9/2007.
IFR Detector R&D status
Wander baldini on behalf of the SHIP Muon Group
4m. Blanco TCS Upgrade: Electronic Status at March/2010
D. Breton, S. Simion February 2012
Technical Coordination Parallel Session November 2011, FNAL
LVPS HEC Overview and Development
Scintillation Detectors in High Energy Physics
The High Voltage problem
Update on CSC Endcap Muon Port Card
288 channel HE RBX? A conceptual exercise, NOT a proposal
Calorimeter Upgrade Meeting - News
Electronics: Demod + 4Q FE
HCAL – SiPM upgrade requirements
Timing Counter Sept CSN I, Assisi 2004 Giorgio Cecchet.
Development of hybrid photomultiplier for Hyper-Kamiokande
Correlation of HO signal with DT
Signal Conditioning.
ME1/1 Electronics Upgrade
LIP and the CMS Trigger Upgrade On behalf of the LIP CMS Group
Presentation transcript:

Propose to replace HPDs in R1 and R2 with SIPMs, ASAP HO Strawman Proposal Propose to replace HPDs in R1 and R2 with SIPMs, ASAP R0 OK, leave alone. SIPM benefits Work in B field Better QE Better signal-to-noise (higher gain) QIE/HTR/DCC will remain unchanged Upgrade will remain in place for life of CMS (OK for MTT) Jim Freeman 11/19/2008

Muon response for YB1 HPD SiPM SiPM HPD Jim Freeman Time slew 11/19/2008

Fast Path Timeline 2009 2010 2011 SD Run SD Run SD Run 2009 2010 2011 SD Run SD Run SD Run Remove ALL R2 RMs Install 2 SIPM RBXs Order R2 SIPMs, Fab R2 boards Order 1K SIPMs: R1 Fab SIPM / Int cards Install R1 Install R2 Jim Freeman 11/19/2008

Fast Path Decisions Decide not to operate R2 (now) Not needed for early physics Need HPDs for R1 replacements, spares Get jump start on upgrade by removing RMs Evaluate Hamamatsu, FBK diodes on bench (now – March) Performance (done!) Lifetime Install 2 RBXs of SIPMs (Hama, FBK) (Feb-Mar) Develop utilities needed for DCS, … Order SIPM for HO upgrade of R1, R2 (Mar 09) Build Cards (Mar – Oct) Build tested RMs with R2 Install as possible, 2009 shutdown, 2010 shutdown Jim Freeman 11/19/2008

Relaxed Path Timeline 2009 2010 2011 SD Run SD Run SD Run 2009 2010 2011 SD Run SD Run SD Run Install 2 SIPM RBXs Fab SIPM / Int cards Order 2K SIPMs: R1, R2 Install R1 Jim Freeman 11/19/2008

Requirements Document for HO SIPMs Jim Freeman 11/19/2008

MTT Concept (Phase II) Jim Freeman 11/19/2008

Using HO for MTT? Existing HO ~ ½ segmentation of desired MTT. OK like this? If not  Replace SIPMs with EDUs. Read out each of the 4 fibers per tile, analog info gives improved position resolution. New QIE/back end electronics F1 F2 Jim Freeman 11/19/2008

Install EDUs 2011 with old electronics Fine MTT Scenario Don’t install 3X3 SIPMs Rather develop EDUs Install EDUs 2011 with old electronics At some point in the future (2015?) upgrade to new electronics using same EDUs Jim Freeman 11/19/2008