HITSP 2009 TC Timeline Overview

Slides:



Advertisements
Similar presentations
FCMAT Response & Preparation: Process Outline October 25, 2006.
Advertisements

Technical Committee Restructuring: Sequence of Events 1.(Urgent, needed immediately) TC leadership drafts overall goals and scope of each TC, i.e. division.
0 Chicago, IL March 6 th, 2007 Use Case Requirements, Design and Standards Selection HITSP Use Case Requirements, Design and Standards Selection Date:
0 HITSP Technical Committee 2009 Project Plans 1/20 HITSP Panel HITSP 2009 TC Timeline Overview Note: Quality Measures, Consumer Preferences, Clinical.
HITSP Capabilities Public Review Webinar HITSP Clinical Note Details Extension Public Review Capability 119 Communicate Structured Document Care Management.
Update on Newborn Screening Use Case Advisory Committee on Heritable Diseases in Newborns and Children - Advisory Committee on Heritable Diseases in Newborns.
0 Harmonization Process, Work Plan, and Schedule Chicago IL. March 5, 2007 HITSP Project 2007 Work Plan and Schedule Contract HHSP EC.
1 Collaboration and Concept Exploration Nationwide Health Information Organization (NHIO) Gateway March 28, 2007.
Query Health Distributed Population Queries Implementation Group Meeting October 25, 2011.
© 2013 OSLC Steering Committee1 Proposal to Create OSLC Affiliated Technical Committees OSLC Steering Committee Meeting: 1 PM EDT, 8 July 2013 Open Services.
Longitudinal Coordination of Care LCP SWG Thursday July 18, 2013.
HL7 Child Health Work Group Update HL7 EHR-Public Health Task Force Andy Spooner, MD CMIO, Cincinnati Children’s Hospital & Medical Center Co Chair, HL7.
GOVERNOR’S EARLY CHILDHOOD ADVISORY COUNCIL (ECAC) September 9, 2014.
0 Connectathon 2009 Registration Bob Yencha Webinar | August 28, 2008 enabling healthcare interoperability.
Targets for project progress 2015: graduation review – clear documentation and PoC implementation specify general framework and API requirements gap analysis.
0 HITSP Technical Committee 2008 Project Plans September 7, 2008 V1 HITSP Project Document Production Schedules Timeline Overview 2008 Use Case Detail.
BID-MAeHC DEMONSTRATION PROJECT Steering Committee Meeting October 19, 2009.
Healthcare Information Standards Panel 2007,2008, and Beyond John D. Halamka MD Chair, HITSP.
1 DRAFT October 22, 2008 Ed Larsen Framework Review Working Group Plan.
Public Health Data Standards Consortium
Ideas for the SPDX™ WG 1. Onboarding New Participants SPDX™ WG need to have a plan for onboarding new participating companies. Example:  I am Company.
0 Evaluation of Standards Harmonization Process for HIT Chicago, IL. January 23, 2008 HITSP Project 2008 Work Plan and Schedule Contract HHSP EC.
Lab Results Interfaces S&I Framework Initiative Bi-Weekly Initiative Meeting July 18, 2011.
0 Healthcare Information Technology Standards Panel January 24, 2008 HITSP – NHIN Liaison Update.
Structured Data Capture (SDC) All Hands Meeting May 26, 2016.
Capital Facilities Program Update San Rafael City Schools August 8, 2016.
1 Phase 2 Pilot of Newborn Hearing Screening (NHS) Health Information Exchange (HIE) With Electronic Health Records (EHRs) Using the Hearing Plan of Care.
Public Health Data Standards Consortium
HITSP Project 2007/2008 Work Plan and Schedule
Current Framework and Fundamental Concepts
IEEE TGv March 2010 Agenda Date: Authors: March 2010
IFSP Aligned with the Early Intervention Data System
Status of the Planning Working Group’s (PWG) Efforts
Public Health Data Standards Consortium
City of Crosslake Steering Committee Meeting #5- 10:00-12:00pm
Health Resources and Services Administration (HRSA)
Overview of the FEPAC Accreditation Process
HITSP Project 2007 Work Plan and Schedule Contract HHSP EC
Greater Columbia ACH Board of Directors 4/19/17
Electronic Health Information Systems
EHR System Function and Information Model (EHR-S FIM is based on EHR-S FM R2.0) CP.3.3 Manage Clinical Documents and Notes aka DC in EHR-S FM.
CEOS Work planning Steven Hosford, ESA/CNES, CEO
HITSP Standards Harmonization Technical Committees Update
5 Year Program Planning Process for year
Board of Early Education and Care May 12, 2009
Update to NLAG board 24th November 2015
Portfolio Management Process & Customer Request Management
NC Dual Eligibles Advisory Committee September 23, 2016
This Presentation Pack is brought to you by
WisPQC Informational Webinar for NAS/NOWS Initiative
United Way of Benton & Lincoln Counties
Reliability Standards Development Plan
Systemic Student Support (S3) Academy
NERC Reliability Standards Development Plan
doc.: IEEE <doc#>
SEPARATION HISTORY AND PHYSICAL EXAMINATION (SHPE)
Value-Based Payments.
HIT STANDARDS & INTEROPERABILITY COLLABORATIVE
NERC Reliability Standards Development Plan
TPM/PBPP Implementation Timeline
Ctclink executive leadership committee May 31, 2018
IEEE P Wireless RANs Date:
doc.: IEEE <doc#>
September 2009 Closing Report
doc.: IEEE <doc#>
Basic Data Provenance April 22, 2019
Health Information Exchange for Eligible Clinicians 2019
Capacity Access Review
Value-Based Payments.
CMS NPRM for Payer Data Exchange – to Member
Presentation transcript:

HITSP 2009 TC Timeline Overview September 11, 2009 HITSP 2009 TC Timeline Overview Note: Quality Measures, Consumer Preferences, Clinical Research, Common Data Transport may deviate from the timeline below, as their timelines are further established they will be included as separate line items 8/24 HITSP TCL, Chicago 11/2 HITSP TCL DC Area 12/1 HITSP Board 8/25-8/27 TC F2F, Chicago 9/8 HITSP Board 11/3 – 11/5 TC F2F DC Area 1/11-1/15 Connectathon AUG SEPT OCT NOV DEC JAN 9/15 HITSP Panel CAP Req & Des Webinar (9/29-10/1) 12/15 HITSP Panel 1/20 HITSP Panel 2009 Work Items: Wave 1 10/30 11/6 12/23 1/13 1/20 9/11 9/18 10/16 12/4 R&D (Requirements and Design) Development (assumption is F2F Pub.) 1 week Insp Test/ Comment Comment & Resolution (longer duration due to holidays) 3 weeks Panel Review Comment Draft IS Dev 1 week 4 Weeks 6 Weeks 6.5 Weeks 1 Week 2009 Work Items: Wave 2 1/15 1/29 9/11 10/9 10/16 11/13 R&D (Requirements and Design) Development Comment Draft IS Dev 2 weeks 1 week WE ARE HERE 4 Weeks 15 Weeks Short Term Items August & September Generalize/Conform SPI SCs/Capabilities, TC Plans for Transition, Gap Resolution for Meaningful Use, Finalize Templates Holiday Ongoing Efforts Full TC Meetings Testing Support, Tooling Efforts, Foundations, NHIN Support, ARRA Gaps & Feedback from ONC IRT Content, Editorial and Quality Review Connectathon Panel Approval

Development of Generalized Capabilities Documents Timeline for Capabilities Generalization 8/24 HITSP TCL, Chicago 11/2 HITSP TCL DC Area 12/1 HITSP Board 8/25-8/27 TC F2F, Chicago 9/8 HITSP Board 11/3 – 11/5 TC F2F DC Area 1/11-1/15 Connectathon AUG SEPT OCT NOV DEC JAN 9/15 HITSP Panel 12/15 HITSP Panel 1/20 HITSP Panel Capabilities Team 9/15 10/1 Development of Generalized Capabilities Documents TC Comment Quality 4 Weeks WE ARE HERE Holiday Full TC Meetings IRT Content, Editorial and Quality Review Connectathon Panel Approval

2009 Work Items Split Up by Waves Activities During Wave 2 (Nominal Risk) Clinical Encounter Notes (CMHR) Common Device Connectivity (Cons) Long Term Care (Prov) Maternal and Child Health (Pop) Medical Home: Co-Morbidity & Registries (Cons) Order Sets (Prov) Scheduling (Admin) Wave 3 (Greater Risk) Consumer Adverse Event Reporting (Pop) Activities During Wave 1 Quality Measures (Pop) Common Data Transport** (SPI) Newborn Screening (Pop) Consumer Preferences** (SPI/Cons) Clinical Research (Pop) General Lab Orders (Prov) Medication Gaps (Cons) Prior-Authorization (Admin) Rationale ONC high-priority items For the purpose of proper resource utilization, the Program Management Team selected additional work items to include in Wave 1, supplemental to ONC identified priorities so that each TC would have a work item in Wave 1. CMHR/Data Architecture was not included as they have other prioritized items to complete ONC Priorities ** = May be on different schedule – beginning in August

Capacity Risk Some factors lead to capacity risks for expected delivery on the originally-assigned work Time for context switching between tiger teams and technical committees (both on front end and back end of 90-day effort) Lingering work items resulting from ARRA focus, and accommodation of new HITSP artifacts that support ARRA (e.g. – capabilities, service collaborations) Requirements that are yet-to-be determined (e.g. – consumer preferences) Requirements finalized during 90-day ARRA effort that need further assessment (e.g. – Common Data Transport) Original risk of gap/extension “sizing” outstripping capacity

2009 Work Item Details (Wave 1) IS Update Capability Create New Capability Service Collaboration New Constructs Wave 1 Quality Measures (Population) IS06 Common Data Transport (SPI) Newborn Screening IS92 Labor and Delivery (wave 2), Antepartum (wave 2) Consumer Preferences (SPI/Consume) CAP143 Possibly New Cap Clinical Research IS158 CAP127, CAP128, CAP135, CAP143 New Components to be identified General Lab Orders (Provider) New CAP99 Lab Order Message, Lab Order Status Medication Gaps (Consumer) CAP117, CAP118, CAP119, CAP140, CAP141, CAP143 Prior Authorization (Admin & Finance) CAP141 T68, T79

2009 Work Item Details (Wave 2 & 3) IS Update Capability Create New Capability Service Collaboration New Constructs Wave 2 Clinical Encounter Notes (CMHR) CAP119 Common Device Connectivity (Consumer) Update IS77 CAP119, CAP135, New Capability to Support Newborn Screening Possibly Document Sharing SC Technical Note Long Term Care (Provider) Update IS09 CDA, Update C83 Maternal and Child Health (Population) IS91 Possibly New Cap Labor and Delivery, Antepartum, Eligibility for Services, Vital Records Medical Home IS98 Order Sets (Provider) – At risk due to dev of HL7 standard needed New CAP95 Scheduling (Admin & Finance) CAP141 Wave 3 Consumer Adverse Event Reporting Extension to IS11

Requirements & Design Webinars Items to Review Req & Des on T- con Date and Time Technical Committee Work Item Items to Review Req & Des on T- con September 29, 2009 2-5pm EST Provider General Lab Orders New CAP99 September 30, 2009 Consumer Medication Gaps CAP117 CAP118 CAP119 CAP140 CAP141 CAP143 October 1, 2009 2-3:30pm EST Admin & Finance Prior Authorization 3:30-5pm EST CMHR Clinical Encounter Notes

2009 Work Item Timeline Details Draft Technical Committee Work Item Requirements and Design (IS & Capability docs) Req and Des Telecons (Capabilities) Draft Documents for Public Comment (Capabilities, Constructs, IS, SCs, TNs) Comments Dispositioned Finalization of Documents Population Quality Measures (Wave 1, IS06) Completed, public comment closed 10/30 12/16 12/23 Clinical Research (Wave 1, new IS158) Completed, public comment closed (RDSS144) Newborn Screening (Wave 1, new IS92) Due 9/18 (RDSS153) Maternal and Child Health (Wave 2, new IS91) Due 10/9 (RDSS155) 1/15 Consumer Adverse Event Reporting (Wave 3 – extension to IS11) TBD Provider General Lab Orders (Wave 1, new CAP99) Due 9/18 9/29 Long Term Care (Wave 2, update to IS09) Due 10/9 Order Sets (Wave 2, new CAP95)

2009 Work Item Timeline Details Draft Technical Committee Work Item Requirements and Design (IS & Capability docs) Req and Des Telecons (Capabilities) Draft Documents for Public Comment (Capabilities, Constructs, IS, SCs, TNs) Comments Dispositioned Finalization of Documents Consumer Medication Gaps (Wave 1, update CAPs) Due 9/18 9/30 10/30 12/16 12/23 Common Device Connectivity (Wave 2, new IS97) Due 10/9 (RDSS159) 1/15 Medical Home (Wave 2, new IS98) Due 10/9 (RDSS157) SPI Consumer Preferences (Wave 1 – with Consumer) Common Data Transport (Wave 1) Admin & Finance Prior Authorization (Wave 1, update CAP141) 10/1 Scheduling (Wave 2, new CAP93) Due 10/9 TBD CMHR Clinical Encounter Note (Wave 2)