Feather River West Levee Project Project Area C May 24, 2013

Slides:



Advertisements
Similar presentations
US Army Corps of Engineers BUILDING STRONG ® Public Law 84-99, Rehabilitation and Inspection Program Mike deMasi Chief Emergency Management, PL Program.
Advertisements

Draft Action Plan Update – Agenda Item No. 5D Central Valley Flood Protection Board.
Central Valley Flood Protection Board Meeting – Agenda Item No. 7A APPLICATION NO
Public Information Meeting #6 City of Fargo Flood Risk Reduction Projects Rose Creek Coulee October 9, 2012.
Acquisition of partial interest EASEMENTS. Does USPAP require a definition of the rights being appraised? Std Rule 1-2(e) Identify the characteristics.
The State Water Project, Unauthorized Encroachments and the California Water Code State of California Department of Water Resources Division of Operation.
SUTTER BUTTE FLOOD CONTROL AGENCY Supplemental Presentation on Variances and Encroachments Feather River West Levee Project Project Area C May 24, 2013.
Agenda Item 9 Sutter Bypass CVFPB Meeting April 17, 2009.
California’s Central Valley Flood System Improvement Framework California Levees Roundtable March 27, 2009 California Levees Roundtable March 27, 2009.
Gwinnett County’s Post Development Stormwater Management Program
Hydraulic Screening and Analysis Needed for USACE Review
ODOT Rail Division 1.Regulate all Highway/Railroad Crossings 2.What is a “Crossing Order”? 3.When is an Order required?
WEKIVA BASIN ONSITE SEWAGE TREATMENT AND DISPOSAL SYSTEM STUDY Bureau of Onsite Sewage Programs Division of Environmental Health Florida Department of.
Central Valley Flood Protection Board Meeting – Agenda Item No. 10A APPLICATION NOS and
Acquisition of Flood Control Easements Triangle High-Ground Area City of West Sacramento, Yolo Co. Meeting of the Central Valley Flood Protection Board.
N AVIGATING THE T URN : F LOOD R ISK A SSOCIATED WITH L EVEES Sam Riley Medlock, J.D., CFM Association of State Floodplain Managers May 2011.
An update from the National Committee on Levee Safety Presented to the TWCA by Karin M. Jacoby, PE, Esq. June 17, of 14An Involved Public and Reliable.
BUILDING STRONG ® Do not include this Slide. This template is a guide for preparing power points presentations. The information requested is important.
Western Regional Gas Conference August 24, 2010 Distribution Integrity Management Programs (DIMP) Rule.
Central Valley Flood Protection Board Meeting – Agenda Item No. 4E APPLICATION NO
Central Valley Flood Protection Board Meeting – December 20,
A GIS-Based Model to Identify Sensitive Water Resource Properties in Need of Protection 2009 Watershed Science and Technical Conference September 14 &
CALIFORNIA DEPARTMENT OF WATER RESOURCES Preparations for Flood Season DFM Flood Maintenance Office Presented By: Noel Lerner, Former Chief Flood.
Amendments to Orange County Code Chapter 9 (Building & Construction Regulations) Orange County BCC June 16, 2015.
1 Three Rivers Levee Improvement Authority Follow-up on Twelve Compliance Issues Raised on February 26, 2007 March 22, 2007.
DWR Maintenance Area Response to USACE Periodic Inspections Presented by: Noel Lerner, Chief, Flood Maintenance Office Mark List, Chief, Maintenance Support.
Central Valley Flood Protection Board Meeting – Agenda Item No. 6B APPLICATION NO
September 23, 2010 Overview of DWR’s Flood Management Activities Related to the Delta A Briefing to the Delta Stewardship Council 1.
Presented to: Central Valley Flood Protection Board August 23, 2013 Sacramento Area Levee Accreditation Key Results from Encroachment Analysis.
Central Valley Flood Protection Board Meeting – Agenda Item No. 9A CVFPB MEETING – October 25, 2013.
Tracey Ferguson Project Manager, Integrated Water Resources ATKINS.
Central Valley Flood Protection Board Meeting – Enforcement Report 1.
TRANSPORTATION ALTERNATIVES PROGRAM 2016 Project Scoring Update Workshop.
2 American River Common Features General Re-evaluation Report Request for Board Approval of Letter Requesting Consideration of Locally Preferred Plan (LPP)
CVFPB Executive Committee Meeting – Agenda Item No. 8A Central Valley Flood Protection Board.
CVFPB Executive Committee Meeting – Agenda Item No. 4C Central Valley Flood Protection Board.
APPLICATION NO LEVEE DISTRICT No. 1 Of SUTTER COUNTY STAR BEND SETBACK LEVEE SUTTER COUNTY April 17, 2009.
Crow Wing County Ditch #13 Public Hearing 10/27/15.
Durham Villas Planned Unit Development TSM & REZ Morris Bud Keeney Butte County Board of Supervisors December 11, 2012.
Environmental Site Assessments Hazardous Materials/ Regulated Substances Categorical Exclusion Training Class.
Mountain Regional Water Rules & Regulations Overview.
West Sacramento Area Flood Control Agency November 10, 2011 Update on Current Levee Construction Projects and on the Southport Sacramento River Levee Early.
May 14, Planning Commission Planning Commission May 14, 2015.
Briefing regarding the new State General Stormwater Pollution Control Permit.
CITY OF BELLEVILLE ROAD IMPROVEMENTS PROGRAM
Urban Runoff Pollution Ordinance 2017 Proposed Update
CROSS CONNECTION CONTROL PROGRAM
Stormwater Management
Chapter 3 Managing Earth’s Changes
Limited Service Agreements
Agenda Updates to Driveway and Sidewalk specifications and permits
Central Valley Flood Protection Plan Senate Bill 5 Amendments
Flood Damage Prevention Code Update
Butte County Board of Supervisors December 6, 2016
WEST & EAST DISTRICT PROJECTS PRESENTATION
Class I Injection Well Application Issues
Construction Management & Inspection
Local Bridge Hydraulics 101 Planning & Funding Considerations
Presentation Outline Background Summary of City Actions
MUNICIPAL UTILITIES DEPARTMENT July 26, 2005
Model Water Efficient Landscape Ordinance
Public Hearing Sanitary Sewer Fees
Moratorium Session 7 Oceanfront Development Proposals: December 3rd Folly Beach Planning Commission Reminder that this presentation, as well as past.
Any time a body of water rises to cover what is usually dry land.
WASTEWATER MANAGEMENT 19 September 2018
FEMA FLOOD INSURANCE STUDY UPDATES
Walker Street Reconstruction Project 25% Design Public Hearing
Washoe County Board of Adjustment
Urban Water Institute 24th Annual Conference Oroville Dam
Larimer County: engineering
Presentation transcript:

Feather River West Levee Project Project Area C May 24, 2013 SUTTER BUTTE FLOOD CONTROL AGENCY Supplemental Presentation on Variances and Encroachments Feather River West Levee Project Project Area C May 24, 2013

Permit 18793-1 Greatly reduces flood risk by remediating through and under-seepage deficiencies Requires removal of all encroachments which present a public safety risk Requires removal of all encroachments which negatively impact constructability Prioritizes expenditures on highest-risk issues first

Variances A lot of Variances? Yes, but... Variances are for features that already exist in the ground today, not new facilities Variances are proposed only for features which do not pose a safety of levee integrity issue – those that do are being removed All variances proposed are related to construction (trench slopes w/ CLSM backfill, positive closure device location), materials, and time variances. – everything that we touch gets better! Under proposed Title 23 Revisions, many of the Variances would not be Variances at all, but would be in full compliance

Encroachments

ULDC Requirements for Encroachments ULDC 7.12.1 - “Recognizing that establishing permits for existing encroachments and/or removing unpermitted encroachments can be a lengthy process, often requiring administrative and/or legal actions by state or federal entities, the following is acceptable for meeting the urban level of flood protection:…” Assess and prioritize risk associated with encroachments Immediately remediate high hazard encroachments Develop a plan to permit or remove low hazard encroachments over time Under SBFCA’s FRWLP, approximately 90% of encroachments will comply with ULDC and Title 23 by the end of construction. The remaining are being assessed and SBFCA will adopt a plan for remediation with target dates by December 31, 2013.

FRWLP Approach Greatly reduce flood risk by remediating through and under-seepage deficiencies Acquire property rights per ULDC Move farming operations away from levee Cure ALL non-compliant encroachments to meet Title 23 and ULDC requirements

FRWLP Approach (cont.) Encroachment Remedial Design Process: Inventoried & inspected all encroachments Assessed encroachments for levee safety Assessed encroachments for levee constructability Prepared remedial designs to meet Title 23 and ULDC All findings and remedial designs were presented to the Independent Panel of Experts (IPE), DWR, USACE, and Board staff All comments and recommendations were resolved and back-checked

Summary of 428 Actual FRWL Encroachments 102 – No-issue items: e.g., bike-paths, spur levees, Star Bend Levee, 115KV lines, bridges, items outside levee zone (e.g. orchards in floodway), etc. 3 – Relief Well Systems/Trench Drains (84 wells @ Shanghai Bend, 25 wells @ Star Bend, associated ditches) 10 - Roadways 85 - Dry Utilities (primarily overhead lines within levee zone) electrical & communication 51 – Pressurized up and over pipes (gas, water, sewer) 31 – Gravity pipes (water) 8 – Pressure pipes at grade 1 – Railroad crossing 28 – Unneeded/unused pressure and gravity pipes 17 - CVFPB violations for excavations in the levee 3 – Canals and ditches (Sutter Butte Main Canal (project C), private irrigation ditch (project A), private drainage ditch (project A2) 21 – Supply wells (within 30 feet of landward toe) 68 – Misc. structures (many are ‘after the fact’ permits issued by CVFPB)

Addressing 428 Actual FRWL Encroachments 102 – No-Issue Items: e.g., bike-paths, spur levees, Star Bend Levee, 115KV lines, bridges, items outside levee zone (e.g. orchards in floodway), etc. No action required; complies with ULDC and Title 23 3 – Relief Well Systems/Trench Drains (84 wells @ Shanghai Bend; 25 wells @ Star Bend; associated ditches) Repairing; replacing with slurry wall; no further action required 10 – Roadways 85 - Dry Utilities (primarily overhead lines within levee zone) electrical & communication All will meet Title 23 and ULDC by end of constr.

Summary of 428 Actual FRWL Encroachments 51 – Pressurized up and over pipes (gas, water, sewer) All will meet Title 23 and ULDC by end of Constr. 31 – Gravity pipes (water) All will meet Title 23 and ULDC by end of Constr, 8 – Pressure pipes at grade; all to be upgraded 1 – Railroad crossing Meets Title 23 and ULDC/installing closure structure 28 – Unneeded or unused pressure and gravity pipes – to be removed or abandoned

Summary of 428 Actual FRWL Encroachments 17 - CVFPB violations for excavations in the levee We will fix all excavations by end of constr. 3 – Canals and ditches (Sutter Butte Main Canal (project C), private irrigation ditch (project A), private drainage ditch (project A2) In addition to seepage remediation, SBFCA negotiating maintenance MOU for Canal; ditches to be moved. 21 – Supply wells (within 30 feet of landward toe) 18 wells to be abandoned; 3 small domestic wells TBD 68 – Misc. structures (many are ‘after the fact’ permits issued by CVFPB) All reviewed for compliance with ULDC and Title 23; many to be removed during construction; remainder to be addressed by the plan

Conclusions SBFCA has adopted a strategic, risk-based approach in collaboration with USACE, DWR, and CVFPB staff: 100% of encroachments adversely affecting levee integrity are addressed by construction; approximately 90% of all encroachments will be ULDC and Title 23 compliant via FRWLP construction; the remaining 10% will be assessed, and by December 31, 2013 SBFCA will adopt a compliance plan.