Industrial Zone Alatau district of Almaty

Slides:



Advertisements
Similar presentations
High performance; from 1 metric ton to 100 metric tons instant purification facility per hour, 2400tons per day Low energy consumption (25 kw/h – 38 kw/h)
Advertisements

Electric Vehicles Industrial Cluster - NPO IKEM Corp. (Business entity of EVIC) Changing the Government Agenda of EU's poorest countries using the power.
I Situation of water supply and sewerage in Beijing 1. General situation of water supply business Beijing, the driest city in the world: Lack of water.
Part III Solid Waste Engineering
Titlul proiectului subtitlu EU Financing in Environmental Sector during Raluca FRATILA Ministry of Environment and Forests, Managing Authority.
MODERN VENTURES (Pty)Ltd t/a NORTHERN GATEWAY CITY PORTION 2 OF 36-NQ
This project is co-funded by the European Union, the Russian Federation and the Republic of Finland Activity 4. Utilities network analysis (KRIMEL, KAEEC,
CEMEPE Skiathos island, June 2007 Business activities in the environmental sector in Greece: Current status and prospects E. Kondili 1 *, J. K. Kaldellis.
Electrical Equipment Park in in Russian Federation Russian Federation on the basis of Korean technology Project’s conception presentation Moscow Region.
BORDER ENVIRONMENT COOPERATION COMMISSION Mitigating Impacts on Water Resources: Environmental Infrastructure Investment.
Presentation of workshops on environmental sanitation for the 6th year semester.
URBAN QUALITY AND SUSTAINABILITY AND GREEN JOBS GENERATION: ECOCIUDAD VALDESPARTERA.
Recycling plant with a sorting line and area for temporary waste storage Project idea: utilization and processing of waste Place of realization: near treatment.
1 II. Sewer Networks and Facilities Topic II.1. Kinds of Wastewater. General Scheme of Sewerage. Kinds of Sewerage Schemes (Patterns) Sewerage Definition:
Innovation Division. Innovation Its embedded novelty, providing qualitative increase in the efficiency of processes or products demanded by the market.
Department of Municipal Hygiene and Occupational Health. Lecture on environmental sanitation for the 5th year Lecture Subject: Hygienic bases layout and.
Territory of your possibilities! «DAMU ALMATY» Industrial-logistics park september 2009.
TAOYUAN ENVIRONMENTAL SCIENCE & TECHNOLOGY PARK BUSINESS INVITATION SEMINAR PRESENTATION OF PREFERENTIAL MEASURE & COUNSELING ENVIRONMENTAL PROTECTION.
INDUSTRIAL PARK MISSION Industrial Park mission is to create favorable conditions for the development of small and medium-sized companies Establishing.
Environmental Toolbox. Technical Module Introduction.
E nvironmental Protection in Bulgaria facts and challenges Workshop on : “Protection of the environment: climate change, pollution and biodiversity” Sofia,
Green Engineering Careers Tom Rebold Chair, Engineering Department.
Strengths and weaknesses of the permitting system and enforcement process in RIEW – Veliko Turnovo Regional Inspectorate of Environment and Water - Veliko.
Ogre county council (Latvia) Public services Conference in Novy Bydzov, 8-10th May 2008.
1 CONFIDENTIAL Project information Contact Construction of Solar Power Plant “Kapshagay Solar” 50MWt in Almaty Region Project profitability for the period.
Water Pollution and Solutions Chapter 11 section 4.
Seminar for Eastern Europe, Caucasus and Central Asia Countries (EECCA) on Water Statistics September 2012, Almaty, Kazakhstan J.Otgonbayar, Water.
AIMAG GROUP OVERVIEW AIMAG GROUP An integrated system of companies for innovation and quality of service. A multi-utility company for the.
Location The park is located between the major centers of consumption in Russia Industrial Park MSB-Udomlya is located in the Tver region. The developed.
«MALAYA SOSNOVKA» INDUSTRIAL INNOVATIONS PARK. - is situated in the centre of Russia on the border between Europe and Asia; - the territory is 88.5 thousand.
Transcarpathian Regional Council Zahony Development Company Beregovo District Administration Municipal government of village Diyda ENPI Cross-border Cooperation.
September 11, 2012 Water Resources Statistics of the Republic of Kazakhstan A. Yepbayeva, Director of Production Statistics and Environment Department.
Water and Wastewater Infrastructure Project Financing 1.
Lithuanian Water Suppliers Association LEGAL REGULATION OF WASTEWATER DISPOSAL AND TREATMENT IN LITHUANIA.
ERRA Workshop on Regulatory Monitoring of the Electricity Sector Almaty, Kazakhstan, January 31 – February 2, EnergoAlem Company Electricity Market.
1. Initiator and goals of the project Initiator of the project – the Investment Promotion Agency of Novosibirsk region – a specialized organization for.
2016. Abdi Ibrahim Global Pharm LLP  Pharmaceutical plant for production of medicines in accordance with the GMP standards of the Republic of Kazakhstan.
EASY project. Plan Local EASY Sustenergy Europe Project “Energy Actions and Systems for Mediterranean Local Communities”
Program for installing heating systems using renewable energy, including the replacement or completion of classic heating systems Between July 15, 2010.
STRATEGY OF LOCAL GOVERNMENT IN THE WASTE MANAGEMENT IN KIEV
M PARK AD Sofia.
NATIONAL COMPANY INDUSTRIAL ZONES
Federal Energy and Environmental Regulation Agencies and Laws
Collection and use of data on Water Abstraction and Use in Georgia Mariam Makarova, Head of Water Resources Management Division, Ministry of Environment.
MINISTRY OF ECOLOGY AND NATURAL RESOURCES OF UKRAINE
An early success story of people for the people
Information about the resort recreation area "Kenderli"
LOW CARBON TOWN-INDICATOR (LCT-I) BITUNG CITY, NORTH SULAWESI, INDONESIA NOLDY TUERAH CEO, BOARD OF INTEGRATED ECONOMIC DEVELOPMENT ZONE (IEDZ) MANADO-BITUNG.
MINISTRY OF ECOLOGY AND NATURAL RESOURCES OF UKRAINE
LEED Defined Leadership in Energy and Environmental Design
Industrial Zone Alatau district of Almaty
Agro zone «Intensive gardens»
Mini dairy plant construction
«We will start carrying out promising projects such as the formation of international transportation corridors, including those from the Baltic via the.
Numfon Eaktasang ,Ph.D Thammasat University
«We will start carrying out promising projects such as the formation of international transportation corridors, including those from the Baltic via the.
- Customs duties exemption
Solid Waste Management In ZF Landfill
WASTEWATER MANAGEMENT IN TURKEY
Sacramento County Stormwater Quality Program
FIELD LEVEL CHALLENGES FOR SOLAR PARKS IN INDIA
CONSTRUCTION PROJECT IN YAGOTYN DISTRICT, KIEV REGION
Construction of Balkhashskaya TPS
Welcome To Our Presentation 1. Topic Name Transfer Stations and Transport, Ultimate Disposal Methods 2.
IMPLEMENTATION OF ARTICLE 9
Nebraska Water Infrastructure Funding and Financing Programs
A Practice of Building a Low-carbon City in Chenggong New District Kunming, China Chengong Municipal People’s Government May 2016.
Investment potential   Petrovsky city   district Stavropol Territory.
Sacramento County Stormwater Quality Program
Environment in Cohesion Policy framework for
Presentation transcript:

Industrial Zone Alatau district of Almaty

General information Industrial Zone in Alatau district of Almaty is formed as a complex of industrial enterprises that produce competitive and export-oriented goods and services. It is mainly concentrated in the manufacturing industry and in related services. These services are grouped by the following sectors: the general industry focus, centers of research and innovation development, special engineering education, commercialization and business in the region Industrial zone – Almaty

The main objectives for the creation of the Industrial Zone are: The location of the Industrial Zone is determined by the Resolution of the Akimat of Almaty №3 / 246 of 13.04.2009 west md. Shanyrak- 5 in Alatau district of Almaty. The main objectives for the creation of the Industrial Zone are: promoting the accelerated private enterprise development in the industry; optimization of expenses for the creation and development of new infrastructure facilities; improving the efficiency of production; providing employment. According to the Decree of the Government of the Republic of Kazakhstan №279 from 31.03.2014, JSC "NC" SEC "Almaty", being the operator of the Industrial Zone, established management company - JSC "Industrial Zone - Almaty." Industrial zone – Almaty

Benefits of participation in the industrial zone:  the possibility of obtaining land with the supplied infrastructure;  promotion and information support of the project participants by the Almaty City Administration and the Government of the Republic of Kazakhstan;  assistance and advice to the Management Company for the preparation and construction of industrial areas;  convenience of centralized provision of public services for the Management Company. Industrial zone – Almaty

The main technical and technological parameters The industrial zone Allocated for projects - 490 ha - 204,2 ha Number of companies (on 15.03.2017) – 38 unites Administrative and business center Transport and logistics centers Communal area (railway line) Roads Substations "PS№2 Industrial Zone" Difficult terrain - 22,6 ha - 28,3ha - 13,7ha – 87ha - 1 ha - 56,2 ha Industrial zone – Almaty

The production zone comprises six sectors: Food Industry; Pharmaceutical industry; Light industry; Mechanical engineering; Chemical industry; Construction industry. Industrial zone – Almaty

Natural and climatic conditions of the construction site: Climatic regions (SNIP RK 2.04-01-2001) - III B The area weight of the snow cover (SNIP 2.01.07-85 *) - II (S0 = 70 kg / m2) The area of wind pressure (SNIP 2.01.07-85 *) - III (W0 = 38 kg / m2) The estimated winter outdoor temperature of the coldest five-day week, security 0.92 (SN RK 2.04-21-2004) - minus 250 C Normative depth of freezing ground for loam - 92 cm Soil category of seismic properties - II (Tu.) And III (third) Soil subsidence of platforms - the second type Seismicity of the territory - 9 and 10 points Industrial zone – Almaty

main production road length of 3.1 km; Railway transport: There is an existing M / A driveway to the CHP-2, CHP-2 binding with siding №71. The total length of the construction w / d path 3,3km. Road network: main production road length of 3.1 km; industrial district road with length of 2,8km; multisectoral industrial road length 8,4km. Gas supply: Gas will be supplied from the GRA "Orbit". The total gas flow rate of 40,000 Nm3 / h, including: technological needs of 8,700 Nm3 / h; future development of neighborhoods 31300 Nm3 / h; The length of the gas networks of high and medium pressure 9,04km. Industrial zone – Almaty

 Category electricity – II;  Power supply:  Power supply is carried out from OSG 110 kV TPP-2. Substations №1 and №2 closed type transformers with a voltage of 110 / 10-10kV power 2h63MVA each scheme 110-4N;  Category electricity – II;  The installed capacity of power consumers - 504000kVt;  The estimated capacity of power consumers - 150 000kVt.  Water supply:  Water consumption - 22487.4 m3 / day;  Water pipeline distribution network includes ring, diameter, providing fire and drinking needs facilities;  Insertion of running water for building sites provided by distribution networks, with meters in wells. Industrial zone – Almaty

Construction CND to 2200 m3 / h md. Conductor-1. Boraldai; Sewerage provides: Construction of two off-site gravity sewers with a diameter of 200mm, 600mm in diameter from the LHC them. D. Kunaev to the ANC in md. Conductor-1. Boraldai, total length 11,36km; Construction CND to 2200 m3 / h md. Conductor-1. Boraldai; Construction of pressure collector sewer length of 2,56km; Construction of street backbones gravity sewer, length of 7,018km; Wastewater - 17035 m3 / day.  Drain rainwater: Implemented system tray and channel sedimentation ponds. Area ponds lagoons on the west side of 10 066 m2, on the east side of 6634 m2. Relatively clean water used to irrigate green areas. 10 Industrial zone – Almaty

Activities on the Environment Measures for environmental protection include the protection of air basin, groundwater, green spaces, noise reduction of transport and of the work of production facilities; The territory that is free from buildings and pavement is for general improving and landscaping; For the period of construction, environmental protection activities include the following: removal of topsoil before construction work, organization of temporary parking of vehicles, machinery, manufacturing sites with a hard surface, excavation work with the organization of dust suppression, prevention of soil pollution, removal of solid waste to the landfill, the use of water recycling with treatment facilities in the transport and other washing. Industrial zone – Almaty

Plan of actions for Prospective Participant in the Industrial Zone: Preparation of documentation in accordance with the approved list and coordination with the LP "Industrial Zone - Almaty.“ Application at LP "Industrial Zone - Almaty.“ Passage of the Regional Coordinating Council in Almaty. The signing of the Agreement on the conduct of activities in the industrial zone. Application to the akimat of Almaty city for providing the land. Industrial zone – Almaty

«Industrial zone - Almaty», LLP. Almaty, Algabas microdistict, str.№7, Substations №12 “BAK” phone: +7 (727) 237 69 13 e-mail: ind_zone@mail.ru Industrial zone – Almaty